8/9/2019 2004-2005 Annual Report Murray Mallee Local Action Planning
1/24
1
Contents
Chairpersons Report October 2005 3
Murray Mallee Local Action Planning 5
Management Committee 9
Key Achievements 2004-2005 10
Integrated NRM in the Murray Mallee 10
- Program 12: Capacity Building 11
- Program 4.9: Whole Farm Planning 17
- Program 4.13: Overcoming Barriers to the Use of Productive Perennials
to Reduce Recharge 17
- Program 4.12: Revegetation Technical Support 17
Mallee Futures Program-NLP & RMCWMB 18
Murray Mallee Biodiversity Plan 22
Murray Mallee Revegetation Guidelines 23
Future Activities 24
Auditors Report 25
8/9/2019 2004-2005 Annual Report Murray Mallee Local Action Planning
2/24
2
Some of the information included in the report has been taken from theMurray Mallee Local
Action Plan 2002 - 2005. Copies of the Plan are available by contacting the Association.
Telephone: 08 8531 2066
Facsimile: 08 8532 5300
Address: PO Box 2056, Murray Bridge, SA 5253
Email: mmlap@lm.net.au
8/9/2019 2004-2005 Annual Report Murray Mallee Local Action Planning
3/24
3
Chairpersons Report - October 2005
Rodney Brown
Murray Mallee LAP chair
MMLAP AGM 2005
I would like to take this opportunity to thank our Committee for their support andencouragement to be involved with a number of conferences and workshops which have dealt
with a wide range of issues that are relevant to the future role of LAPs in general and
MMLAP in particular. Some of these have been:
Good Governance Workshop at Murray Bridge.
This has resulted in an update of our own Governance/Operational Policy.
Interviews and Appointment of our Implementation Officer.
Regional LAP Forum at Loxton.
Mallee Futures Grant Allocations. A great result -49 Landholders carrying out91 projects.
LAP Consultation of the State Draft Strategic Plan at Murray Bridge.
SAMDBC NRM Board Stakeholders Forum for LAP chairs at Mannum.
Investment Strategy Reference Joint meeting at Murray Bridge.
In Safe Hands Workshop at Murray Bridge.
SAMDB Board Stakeholder Forum at Mannum. Of particular interest was theproposed timeline for the establishment of NRM Groups.
I have also been grateful for the opportunity to present an Information Workshop for Lameroo
Students to assist with their preparation for the Youth Conference in Adelaide.
It was also a privilege to be invited to a follow up Student Presentation to the local
community.
Ben and Nicole will provide information in their reports about a host of activities conducted
by our LAP, but I would like to acknowledge the success of the following in particular:
Mantung Book Launch and Tour.
Karoonda Farm Fair.
Riverland and Southern Mallee Revegetation Tours/Field Trips.
Lucerne Field day at Marama.
Mentoring of Sth Mallee (Karoonda) students at the Youth Conference.
Karoonda A.S. Workshops.
Two planned activities as this report goes to print are:
Attendance by representatives of MMLAP at the Native Grasses Conference andField Day at Burra.
A Three day Environment Appreciation and Biodiversity AwarenessProgram at Lameroo Regional Community School in December
Detailed Project Officer and Implementation Officer Reports at Committee Meetings attest
to the fact that MMLAP is very much alive and well.
My thanks especially to Ben and Nicole for their enthusiastic and dedicated implementation
of the Committees Vision and plans for the ongoing Capacity Building and on Ground
Works.
My thanks to all Committee members for their considerable input to the success of MM LAP
in 2005, both in their thoughtful contributions at committee Meetings and theirencouragement of community involvement in the areas they represent.
8/9/2019 2004-2005 Annual Report Murray Mallee Local Action Planning
4/24
4
A special word of thanks to Malcolm as Vice Chair and Keith as Secretary for his excellent
Minutes and of course Judy for her expert and tireless work in the area of finance.
We are pleased that James Pinkney has agreed to take over our Bookkeeping and Accounts
and that Judy has agreed to continue as our Treasurer.
Without an active, dynamic Committee the considerable contributions our LAP is making to
conservation / preservation and enhancement of our Mallee Region would not be possible.
Our links with M.S.F, MMSCB and other NRM Bodies also ensure that our LAP is well
placed to encourage sustainability practices and improved productivity.
Finally, our greatest challenge in the coming year will be to adapt and adopt new ways of
improving the operation of MMLAP under the new NRM Board and Group structures.
In particular we need to do all we can to ensure that dry land issues receive the focus they
deserve.
Thank you to all our Association Members for their interest and support and thank you to
those who have gone the extra mile to attend our AGM today.
Rod Brown. Chair/MMLAP
8/9/2019 2004-2005 Annual Report Murray Mallee Local Action Planning
5/24
5
Murray Mallee Local Action Planning
Landholders in the Murray Mallee already make a huge commitment to look after their land
and water resources. This commitment is acknowledged by the local action planning process
which:
supports landholders to improve land management;
provides a broader community focus on the regions natural resources;
enables communities and governments to work together to tackle the major natural
resource management issues.
Murray Mallee Local Action Plan
The Murray Mallee Local Action Planning Association Inc is a community organisation
comprised of Murray Mallee community members who represent a range of groups and
organisations. The Association was formed in 1998 and has a management committee which,
currently consists of nine members. Membership of the Association is open to all members of
the Murray Mallee community and the Association currently has 98 registered members.
This membership has enabled strong links to be formed with many other groups, agencies and
programs operating in the Murray Mallee.
The mission statement of the association is:
To maintain and enhance the natural and agricultural systems of the Murray Mallee through
the support of the community.
To achieve this mission, theMurray Mallee Local Action Plan: Draft for Public Consultation
was prepared and released in 1999.
The local action plan:
identifies the regions major natural resource management issues and determines priority
actions and the most cost effective way for the community, industry and government to
invest their time and money in sustainable natural resource management;
continues to evolve and the Murray Mallee Local Action Plan: 2002-2005 reflects
community feedback on the draft, with priorities identified through community
consultation, and provides updated information on progress and future directions.
8/9/2019 2004-2005 Annual Report Murray Mallee Local Action Planning
6/24
6
Issues
In developing the local action plan, the association identified five major natural resources
management issues for the region in consultation with the Murray Mallee community:
Overarching issues:
Issue 1: Awareness
Issue 2: Farm profitability
Key resource issues:
Issue 3: Soil erosion
Issue 4: Water use
Issue 5: Biodiversity loss
The key resource issues can not be addressed without also addressing the overarching issues.
Objectives
Objectives and actions have been identified for each of the five issues:
Objective 1:
Raise awareness in the Murray Mallee community of the need for change
Objective 2:
Increase gross margins of Mallee farming systems within land capability
Objective 3:
Reduce the erosion of topsoil caused by wind
Objective 4:
Ensure sustainable use of the groundwater resources of the Murray Mallee
Objective 5:Increase the water use efficiency on farms in the Murray Mallee
Objective 6
Minimise the impacts of irrigation drainage in the Murray Mallee
Objective 7:
Protect and enhance native vegetation communities in the Murray Mallee and the species they
support
8/9/2019 2004-2005 Annual Report Murray Mallee Local Action Planning
7/24
7
Partnerships
The focus of the local action plan is on achieving results through on-ground action, which can
only be done by those people working on and making decisions about their use of the land
and water resources. Therefore, the actions identified in this plan are mainly community
actions. It is expected that these will be implemented in partnership with local and regional
groups, and all levels of government.
The role of the Murray Mallee Local Action Planning Association is to create an overarching
plan so that all land and water management activities in the Mallee have one central reference
point. Responsibility for implementing many of the actions within this plan will be shared
with other groups and entities working in the Murray Mallee, such as the Murray Mallee
Districts Soil Conservation Board, Mallee Water Resources Committee, and Mallee
Sustainable Farming Inc. Some of the actions are covered in more detail in other plans
developed by the association, such as the Murray Mallee Revegetation Plan,Murray Mallee
Land and Water Management Plan, and Assisting the Murray Mallee Community to
Understand and Adopt Integrated Natural Resource Management with a focus on
Groundwater Recharge.
Action
The association has been involved in supporting, developing and implementing projects in theMurray Mallee that address the major issues in the local action plan. More than 21,000
hectares of on-ground works have been completed through theMallee Futures Program since
1998.
How can you be involved?
Invest in natural resources management in the Murray Mallee;
Join the Murray Mallee Local Action Planning Association Inc;
Participate in training activities eg field days and workshops;
Undertake a revegetation project on your property financial incentives and free
technical support are currently available for some projects;
Organise or become involved in group fox baiting or weed control programs;
Become involved in mallee fowl monitoring activities;
Help your local school to be involved;
Be involved in the decision making for the region by participating in consultation
activities.
Share knowledge, information and achievements by submitting a story for the `Mallee
Update newsletter released quarterly.
8/9/2019 2004-2005 Annual Report Murray Mallee Local Action Planning
8/24
8
Location of the Murray Mallee Local Action Planning Association area
8/9/2019 2004-2005 Annual Report Murray Mallee Local Action Planning
9/24
9
Management Committee members during 2004/05 were:
Chairperson
Rod Brown Murraylands regional development board
Vice Chairperson
Malcolm Johns Mantung Maggea Land Management Group
Secretary
Keith Payne Murray Mallee Soil Conservation Board
Treasurer
Judy Pfeiffer Community
Members
Trevor Schiller Murray Mallee Soil Conservation Board
Ross Day Mallee Water Resources Committee
Jody Gates Dept of Heritage and Environment
Barry Manuel Wanbi Land Management Group
Neville Pfeiffer Southern Mallee District Council, June 2004
Andrew Hall Mantung Maggea Land Management Group
Kenton FarrWanbi Land Management Group, Mantung
Maggea Land Management Group, Sept 2005
Colin Zadow District Council Karoonda East Murray
The Management Committee was supported during 2005/06 by:
Ben Simon Murray Mallee Project Officer, March 2004-current
Nicole Zeoli Implementation Officer, April 2005-April 2006
Harry Seager Implementation Support Officer-July 04-January 05
8/9/2019 2004-2005 Annual Report Murray Mallee Local Action Planning
10/24
10
Key Achievements 2004 - 2005
To continue implementation of the Murray Mallee Local Action Plan during the last year,
funding support was provided through the SA Murray-Darling Basin Natural Resources
Management Board. This support was linked to implementation of National Action Plan for
Salinity and Water Quality (NAP) and Natural Heritage Trust Extension (NHT) priority
projects. The River Murray Catchment Water Management Board and the National Landcare
Program provided significant funding to enable additional actions identified in the Murray
Mallee Local Action Plan to be achieved.
The achievements of the last year have continued to build on the planning and
implementation activities that have been undertaken during the last seven years. These
activities have been achieved through an investment of well over three million dollars in the
Murray Mallee Local Action Planning area. Past and current investment continues to address
priority natural resource management issues identified in the Murray Mallee Local Action
Plan with current investment also focussing on priority regional issues. This funding has
been more than matched by financial and in-kind contributions from the community,
especially landholders.
Funding also continues to be received by other groups contributing to on-ground action in the
Murray Mallee such as the Mallee Sustainable Farming Inc, Mallee Community EducationNetwork and Land Management groups.
Integrated Natural Resources Management in the Murray
Mallee
This project has attracted contributions of support and funding from the SA MDB NRM
Board, the SA Murray Darling Basin Integrated Natural Resource Management Group, the
National Action Plan for Salinity and Water Quality, National Landcare Program and the
Australian and South Australian Governments.
The project is made up of several programs, such as Capacity Building (Program 12),
Revegetation Technical Support (Program 4.12), Whole Farm Planning (Program 4.9),
Overcoming Barriers to the Use of Productive Perennial Species to Reduce Mallee
Recharge(4.13) and revegatation On-ground Works(Programs 9.3& 4.12)
8/9/2019 2004-2005 Annual Report Murray Mallee Local Action Planning
11/24
11
Program 12: Capacity Building
This project aims to provide resources that will enable community groups and individuals to
further develop their understanding and capacity to play a meaningful role in natural resource
management in the SA Murray Darling Basin by;
Provide professional support to the Murray Mallee LAP and other natural resource
management groups in the Mallee.
Continue developing partnerships, networking and education and awareness activities.
Facilitate change management and leadership activities.
Address indigenous issues.
Initiate participation in research programs and adaptive management activities.
Governance & Operation Achievements 2004 - 2005
Professional support provided to the Murray Mallee LAP and Land Management Groups
as required.
Partnerships strengthened with SAMDB NRM Groups, Authorised officers, Mallee
Sustainable Farming and Land Management Groups ( Mantung Maggea, Lower Mallee)
Linkages maintained with five local schools (Browns Well, East Murray, Geranium,
Karoonda, Lameroo,).
Supported partnerships with local government, providing input on the District Council of
Karoonda East Murray Roadside Vegetation Survey and Management Plans, and
vegetation management plan for native vegetation reserve adjoining `Pioneer Park
Attended Indigenous cross cultural workforce training
Attended Local Level Facilitators Workshop
Maintained links with research activities being undertaken through the Mallee Sustainable
Farming project, S.A.R.D.I., Rural Solutions SA and the Native Grasses Resource Group
Submitted grant application for a community volunteer grant
Provided input into the NRM reform process and regional Investment Strategy
Development
Submitted Australia Post community grant application for the Lameroo Regional
Community School for interpretive bush trial on school grounds
Participated in regional Local Action Planning forums and CARE team meetings.
Supported over 20 existing groups: Mallee Sustainable Farming Inc., Broomrape Team,Mantung Maggea L/C Group, Murray Bridge Animal Plant Control Board, Lower Mallee
Land Management Group, MM Soil Conservation Board, Mallee Water Resources
Committee, Conservation Volunteers Australia, Greening Aust., D.E.H., Nature
Conservation Council of SA, Wildlife Habitat Support Group, Karoonda Native Plant
Society, Karoonda Historical Society, District Council of Karoonda East Murray,
Karoonda Lions Club, Trees For Life, Stipa Native Grasses Group and Bats forBiodiversity, Mallee Strategic Task Force, Rural Solutions SA and other Local Action
Planning Groups within the SA Murray Darling Basin.
8/9/2019 2004-2005 Annual Report Murray Mallee Local Action Planning
12/24
12
Education and Awareness Activities Achievements 2004 2005
(Achieving objective 1)
Raising awareness in the Murray Mallee community of the need for change has been a key
part of all project work undertaken in the Murray Mallee. An integrated extension program
involving all active groups and programs in the area continues to be implemented.
Newspaper advertisements and editorials printed in local papers, District Council of
Karoonda East Murray newsletter, `In the Basin an SA Murray Darling Basin NRM
Board Newsletter, `Agronomy Matters a newsletter for the Branched Broomrape group
and Mallee Sustainable Farming Inc. and local school newsletters.
Radio interviews with 5MU, Power FM, and ABC Radio Riverland.
Information provided for input onto regional web page
Training undertaken in web page editing.
Mallee Update, four newsletters were prepared and distributed to over 800 people in theMurray Mallee.
Attended and/or organised displays for Riverland Field days, Mallee Sustainable Farming
Field Day, Pinnaroo Show, Murray Bridge Show and Karoonda Farm Fair.
Held Mallee Enterprise Tour in the Southern Mallee in October 2004. Several
enterprises in the area were visited to look at what other enterprises besides cropping and
grazing were alive and well in the Murray Mallee. Discissions about the natural resources
management activities were undertaken at each of the properties. It was clear that with a
bit of ingenuity other means of making a living in the Mallee were possible.
Distributed information to over 800 landholders regarding Climate Risk Workshops at
Wunkar to encourage attendance.
Three native seed collection workshops were held in the Northern (Wanbi) and Southern (Parrakie and
Geranium) Mallee. The workshops covered identification, collection, extraction, preparation, storage,
dormancy and the value of local seed from existing vegetation.
Stockyard Plain and Noora Basin Drainage Disposal Basin Tour- held on the 24th March involved a bus
trip to view and discuss the basins to address landholder concerns and increase knowledge and awareness of
disposal basins.
Bat monitoring workshop, held at the Ettrick Fire station in March, in conjunction with the `Bats for
Biodiversity project and the Mannum to Wellington LAP to learn about the role bats play in the
environment, how to monitor them and the opportunities existing for community members to undertake
monitoring or encourage bats onto their properties.
Attended GIS training at OHalloran Hill TAFE.
Attended Project Management Training at Murray Bridge
Attended Staff management training at Murray Bridge Organised workshop on `Guidelines for using perennial vegetation in the Murray Mallee held on the 1st of
July.
8/9/2019 2004-2005 Annual Report Murray Mallee Local Action Planning
13/24
13
Attended NRM tracker training through TAFE care office
Updated regional contacts lists for a range of services related to NRM to increase links with the range of
different service providers.
Participated in the Goolwa to Wellington LAP ` Sticky Beak Tour, providing a short talk on a biodiversity
site.
Attended threatened species awareness workshop near Tailem Bend, held by the Mannum to Wellington
LAP.
Attended Regional Revegetation Forum at Murray Bridge.
Disseminated NRM and National Landcare Program updates to the committee and provided updates in
newsletter.
Disseminated information regarding funding and training opportunities to Murray Mallee Local Action
Planning Committee, MSF, District Council of Karoonda East Murray, Mantung Maggea Land
Management Group, Geranium primary school and numerous other organisations.
Attended SA MDB NRM stakeholder forum.
Attended Investment Strategy joint reference group meeting.
Attended Berri stakeholder reform
Provided input as member of the INRM SAMDB Revegetation Steering Committee.
Attended STIPA native grasses field day at Burra with committee members and landholders
Attended `In safe hands training at Murray Bridge with committee member and staff.
Attended native fodder forum at the Waite Institute to hear a range of talks on research and development in
the use of native woody plants for fodder use.
Attended training for `Bushland condition monitoring manual at Purnong.
Attended EPBC act training (Environment Protection and Biodiversity Conservation) at Victor Harbour.
8/9/2019 2004-2005 Annual Report Murray Mallee Local Action Planning
14/24
14
School and Youth activities Achievements 2004 2005
Seed collection and Propagation workshops held at Geranium Primary and Karoonda
Area School with seedlings ordered by parents for projects in the area.
Nursery activities at Karoonda Area School and Geranium Primary coordinated includingthe provision of materials and instruction.
Direct seeding demonstrations held at Karoonda Area School using seed collected from
workshops
Participated in Mallee Schools Environmental Education program, aimed at bringing all
active groups undertaking educational programs with Mallee Schools together to improve
connectivity and flow between different topics being delivered.
`Pioneer Park vegetation management activities- between the 14th
and 18th
of March,
Conservation Volunteers Australia, in conjunction with Karoonda Historical Society,
Greening Australia and Karoonda East Murray School undertook a range of bush
management activities such as cutting and swabbing boxthorns, pulling weeds, seed
collection activities and assisted in the construction of nursery structures with Karoonda
Area School students for the school nursery.
Information such as posters, pamphlets, CD-ROMs and manuals provided to mallee
schools for inclusion in libraries.
Information regarding funding and leadership opportunities provided to numerous mallee
schools and Mallee Xtreme Leadership Program coordinator.
Surveys from three mallee school students regarding Mallee fowl and revegetation
answered.
River Murray Youth Council
Students from Karoonda Area School and numerous other schools in the SAMDB
currently on the River Murray Youth Council supported and guided at regular meetings
and transport support provided.
Upper Murray Youth Council supported by Implementation Officer with attendance and
support at meetings.
Presentation delivered at Youth Council meeting regarding Murray Mallee Dry-land
issues.
Coordinated and facilitated support provided at the Adelaide River Health conference,
particularly planning activities.
8/9/2019 2004-2005 Annual Report Murray Mallee Local Action Planning
15/24
15
Partnership Achievements 2004 - 2005 (Achieving objective 1)
Linkages have been maintained and continue to be developed with groups and agencies
working in the Murray Mallee:
Murray Mallee Soil Conservation Board, Mallee Sustainable Farming, Mallee Water
Resources Committee, Murray Mallee Strategic Task Force, Murray Mallee Community
Education Network, River Murray Catchment Water Management Board, INRM group
for the SAMDB, Animal Plant Control Boards, Local Government, Land Management
Groups and Department For Environment and Heritage.
Technical support is provided by DWLBC through Rural Solutions SA and Greening
Australia for the planning and assessment of on-ground works projects and technical
support has been provided by DEH for some biodiversity focussed projects.
Linkages strengthened with other Local Action Planning groups with the Implementation
of Maintaining the Momentum(completed November 04), Implementation of Local
Biodiversity Plans for the SAMDB, Active Adaptive Management Project and Regional
Capacity Building activities coordinated by the Regional Capacity building coordinator
have been linked into, with participation and support provide by the Murray Mallee LAP.
Linkages strengthened with Animal Plant Control Boards by providing information about
the distribution of weeds in the Murray Mallee to assist with the development of control
programs such as `Defeating the Weeds Menace for weeds such as boneseed.
Disseminating information about `Bridal Rust workshops and fox bating activities,
communicating regularly about current projects to help maintain coordinated approach to
sites such as rabbit bating on revegetation sites.
Linkages have been formed with the SARDI ` Mallee Dry Land Grazing Systems-
Lucerne and New Perennial Legumes providing strong links with the NLP `Overcoming
Barriers to the Use of Productive Perennial Species to Reduce Mallee Recharge project,
Mallee Pasture Varietal Project and Mallee Futures Program activities.
Input into threatened flora recovery plan prepared by DEH with financial support
provided to undertake monitoring of threatened species in Ngarkat and surrounding
heritage agreements in partnership with the Coorong LAP. Information provide about the
locations of threatened species targeted in the recovery plan.
Input on steering committee for the Karoonda East Murray District council roadside
vegetation survey and Roadside Vegetation Management Plan projects managed by DEH.
8/9/2019 2004-2005 Annual Report Murray Mallee Local Action Planning
16/24
8/9/2019 2004-2005 Annual Report Murray Mallee Local Action Planning
17/24
17
Program 4.9:Whole Farm Planning
Meetings attended with the Murray Mallee Community Education Network and Rural
Solutions to discuss rollout and delivery of programs
Attended and assisted with EMS forum` Managing Risks to Agricultural Production
delivered by Kerri Muller. Disseminated flyer to 500 landholders.
Produced flyer for workshop in late October, workshop cancelled due to lack of
landholder availability and clashes with the range of other field days and activities in
the Mallee.
Program 4.13: Overcoming Barriers to the use of productive perennial species
to reduce Mallee Recharge
Draft consultancy brief prepared for review Final consultancy brief completed
Brief sent to 10 consultants
Consultant selected
Meetings held every few months to monitor progress
Ongoing discussions held with consultant
Support provided by Project Officer to consultant to access survey data, contacts,
relevant documents, meeting coordination, draft review feedback and general
coordination and support.
Report produced outlining information, survey results, trail aims and suggestions
Fact sheets produced covering native grasses, soil erosion and native seed collection.
Expression of interest to participate in trials sent out.
Planning trials has begun, with trials due to be implemented in 2006.
Program 4.12:Revegetation Technical Support
(Achieving objectives 1, 2, 3, 5, 7)
Support, project assessment, monitoring, communications, links to other projects
Administration and reporting coordinated, including technical and monitoring support
for assessment of long term eroded areas, assessment of sites and planning assistance to
achieve both sustainable Ag and Biodiversity Conservation
Ongoing co-ordination and admin by Project Officer
Provision of technical support and site assessments coordinated
Project data maintained on NRM tracker
Respond to numerous enquiries regarding revegetation on-ground works
Links and input into a range of biodiversity projects, activities and issues provided
across Local Action Planning boundaries.
8/9/2019 2004-2005 Annual Report Murray Mallee Local Action Planning
18/24
18
Mallee Futures Program
(Achieving objectives 1, 3, 5, 7) including Program 9.3, 4.12.7 & 4.12.3:
Revegetation On-ground Works
The Mallee Futures Program is the key implementation program for the Murray Mallee
Local Action Plan and Murray Mallee Revegetation Plan. The Mallee Futures Program
currently has five sub projects that have or continue to contribute funding.
1. National Action Plan Maintaining the Momentum
The Maintaining the Momentum project contributed funding to the program until November
2004. The project has now been finalised and final reports submitted, this is no longer a
component of the Mallee Futures Program.This project maintained the momentum of change amongst landholders throughout the SA
MDB, which has been achieved through involvement in Local Action Planning On-ground
works programs. It supported continued on ground action to address a range of integrated
natural resource management issues in priority locations through the SA MDB to achieve
priority outcomes of the National Action Plan for Salinity and Water Quality and with a major
focus on biodiversity as part of the solution. The project was implemented by four local
action planning groups and commenced in 2003, with the Murray Mallee Local component
being administered through the well recognised banner of the Mallee Futures Program. It has
built on work already undertaken in the region and capitalised on the investigations
undertaken by the Mallee Sustainable Farming Project. It developed the skills of landholders
to evaluate and implement option to address a range of natural resource management issues
such as groundwater recharge, soil erosion, and biodiversity decline.
2. National Landcare Program-community support component
The Department of Agriculture, Fisheries and Forestry has provided funding for the activities
undertaken within the `Mallee Futures Program for the 2005 season. The employment of an
Implementation Officer has enabled the continued progress of this well known and essentialprogram. Once again there has been steady interest in the range of on-ground works options
available.
Continuation of funding has been granted for the 2006 season, with the addition of funds to
address soil erosion issues such as levelling of Class VII sand dune blowouts and sowing of
perennial cover to continue the work the soil board has supported.
8/9/2019 2004-2005 Annual Report Murray Mallee Local Action Planning
19/24
19
3. River Murray Catchment Water Management Board - Community Grants
Program
Program 4. supported through both the NAP and the Catchment Board levy, has assisted to
uphold activities, such as the establishment of perennial pastures and fodder blocks to address
priority soil erosion and recharge sites and provide productive and effective stock feed,
reducing pressure on native vegetation and providing better grazing and soil management
options.
4. Soil Conservation Board- Drought Grant
The State Government provided the Soil Conservation Boards with funding to address soil
degradation issues accelerated by the drought conditions in 2002. Project work commenced in
2003 and has reached the final stages of completion, with all funds committed and all but a
few final inspections remaining.
5. River Murray Catchment Water Management BoardThe River Murray Catchment Water Management Board has provided funding to a local
action planning partnership to implement on-ground works in the priority area within 15km of
the River Murray. The Murray Mallee LAP is managing several projects in the dry-land
component of the Corridor. It is not yet known if these projects will roll over onto the 2006
season, but likely that the funds will be returned to the catchment board and added to the levy
pool.
Mallee futures Program 2004-2005
Incentive offers have been sent out to over 50 landholders for more than 95 projects.
A total of 42 landholders will receive funding to undertake 69 on-ground works
projects.
Funding has been allocated to fence and protect over 800 hectares of remnant
vegetation and establish around 60 hectares of local native species, over 130 hectares
of fodder plants and more than 1900 hectares of perennial pasture.
Information about the Mallee futures program was distributed to over 900
landowners in the Murray Mallee, advertisements and updates placed in local
newspapers, the Stock journal and theMallee Update. Landholders successfully targeted for participation in the Soil Boards Drought
project.
Ongoing follow up of landholders to help plan projects and access technical support
has continued, as well as numerous final inspections for completed projects.
8/9/2019 2004-2005 Annual Report Murray Mallee Local Action Planning
20/24
20
Mallee Futures Achievements 2005 2006
Incentive offers have been sent to over 50 landholders for more than 95 projects. A total
of 42 landholders will receive funding to undertake 69 on-ground works projects.
Funding has been allocated to fence and protect over 800 hectares of remnant vegetation
and establish around 60 hectares of local native species, over 130 hectares of fodder
plants and more than 1900 hectares of perennial pasture.
Information about theMallee Futures Program was distributed to over 900 landowners in
the Murray Mallee, advertisements and updates placed in local newspapers, the Stock
Journal and theMallee Update.
Ongoing follow up of landholders to help plan projects and access technical support has
continued, as well as numerous final inspections for completed projects.
Technical support provided by State Government agencies, has been extremely useful in
assisting landholders plan revegetation and rehabilitation projects, especially in the
selection of suitable species, establishment techniques and assessment of remnant
vegetation and eroded sand hill sites.
The community has continued their commitment to on-ground works and table 1
summarises the projects completed or committed, up to September 2005.
Provided area of revegetation funded and revegetation activity information for Ministerial
report.
Participation in training for NRM Tracker database.
Monitoring requirements continued to be reviewed in partnership with other Local Action
Planning groups to develop a system suitable for future regional reporting processes.
Monitoring of all completed projects has been undertaken, including photographs and
GPS readings to enable GIS coverage of project activity to be maintained.
Lower Mallee Land Management group members have continued fox bating activities to
reduce predation on Malleefowl using funding provided by a Threatened Species Network
Grant and the support of the Murray Bridge Animal plant board.
Two revegetation field days held around Loxton and Karoonda/Parrakie to showcase
some local native species revegetation projects undertaken by landholders.
Field based workshop on establishing and managing Lucerne in the Mallee held and
presented by Rural Solutions, which was attended by about 30farmers from across the
Murray Mallee.
8/9/2019 2004-2005 Annual Report Murray Mallee Local Action Planning
21/24
Option Pilot ProjectBiodiversity in the Mallee
Implementation of the LAP
1999 to 2000
Mallee FuturesProgram *
2001 to 2003
Salinity Reduction
Program *
2001 to 2003
Maintaining theMomentum
Soil Board Drought
RMCWMB Corridor
Works funded to30/9/04
Protect andenhanceremnants
402 1798 2,556 392 1315
Local nativespecies blocks
113 97 62 363.5 79.5
Windbreaks 40 36 67.5 24.5 14.5
Fodder shrubs 340 489 1,167 836 324 Product block /woodlot
13 8 8 10.5
Perennial pasture- lucerne
1527 2,774 812
Perennial pasture veldt/primrose
425
730 1,458 40
2675
Fodder shrub /pasture mix
107 n/a
TOTAL 1427 ha 4,690 ha 8,092.5 ha 2,476 ha 4,418.5 ha
Earthworks 57 ha 250 ha 215 ha 72 ha 187 ha
Fencing 99 km 117 km 266 km 111 km 108 km
* Note due to a very dry season in 2002 these works took three years to complete instead of the planned two years with the majority of
8/9/2019 2004-2005 Annual Report Murray Mallee Local Action Planning
22/24
22
Murray Mallee Biodiversity Plan
(Achieving objective 7,Actions 7.2, 7.3& 7.5)
The objective of this project is to identify and document areas with threatened and significant
flora and fauna in the Murray Mallee. The identified priority areas will be targeted for protection
and active management to prevent further decline in biodiversity. The identification of threatenedecosystems, Flora and Fauna species, threats and practical on-ground solutions and actions will
form the basis of the plan. The expected audience will be both officers in the field and landholders
with an interest in biodiversity conservation. The plan will ensure that future revegetation
recovery projects are well targeted towards biodiversity outcomes, in addition to addressing other
natural resource management issues such as weed control and raising awareness of the value of
biodiversity to the mallee community. This information will be a key resource for future project
development and implementation to address biodiversity conservation issues in the region. A
consultant is currently working on this with assistance from a steering committee with a broad
range of knowledge and skills from within the mallee community.
This project is due to be completed by the end of the year.
Biodiversity Plan Achievements 2004 2005
Steering committee formed with representation from a range of stakeholders and landholders
with biodiversity experience.
Draft consultancy brief prepared for review.
Final consultancy brief completed
Consultant selected by steering committee
Steering committee meetings held every few months to continue to develop document
Ongoing discussions held with DEH in relation to support available to progress the mapping
component of the project.
Support provided by Project Officer to consultant to access weeds data, photos, contacts,
relevant documents, communication with steering committee, meeting coordination, draft
review feedback and general project coordination and support.
8/9/2019 2004-2005 Annual Report Murray Mallee Local Action Planning
23/24
23
Murray Mallee Revegetation Guidelines
(Achieving objectives 1,2,5&7)
This project is to provide Murray Mallee land managers the understanding and skills to contribute
to biodiversity conservation and sustainable natural resource management. This will be achieved
through the development of guidelines, which describe revegetation options and implementation
techniques to achieve sustainable and profitable farming systems based on land capabilities.
Revegetation Guidelines Achievements 2004-2005
Consultant Peter Bulman, Farm Tree Systems, appointed to prepare guidelines,
Guidelines completed and include a detailed financial analysis of perennial vegetation
options in the Murray Mallee.
Guidelines prepared and printi9ng and targeted distribution undertaken.
A brochure highlighting the key points of the guidelines has been prepared and distributed
throughout the Murray Mallee and wider community.
A workshop highlighting the guidelines delivered at Karoonda by the consultant Peter
Bulman and involved a range of landholders and employed personnel.
Advertising in Stock Journal regarding the availability of the free `Guidelines
undertaken, with a healthy response received.
Project Completed.
8/9/2019 2004-2005 Annual Report Murray Mallee Local Action Planning
24/24
Future activities
Ensuring continued implementation of the Murray Mallee Local Action Plan continues to be a
challenging process as the delivery of funding programs takes a more regional focus. Current
projects will be completed during 2004 2005 and new projects are expected to commence with
funding provided for another year of National Landcare Program funding and through the
Integrated Natural Resources Management Plan for the SA MDB and associated investment
strategy and the River Murray Catchment Water Management Board
The delivery of funding and implementation of future projects will be influenced by the outcome
of the current Natural Resource Management (NRM) reform process. With the appointment of a
Regional NRM Board in 2005 and subsequent appointment of sub-regional groups the ongoing
role of the Murray Mallee Local Action Planning Association will need to be determined. During
2005 2006 a key role of the Murray Mallee LAP will be to continue building the capacity of the
local community to enable input into regional planning and implementation processes. Activities
to enhance the skills and confidence of community members to ensure local priorities are
considered during regional decision making processes will become increasingly important.
As stated previously, partnerships have been a key component of the implementation of the
Murray Mallee Local Action Plan in the past. It is becoming increasingly apparent that enhancing
these partnerships through the sharing of skills and resources will ensure priority outcomes for the
region are achieved. Maintaining these partnerships and developing new partnerships within a
new regional natural resource management structure will be crucial for the ongoing
implementation of the Plan. These partnerships will ensure that the integrated approach to
addressing natural resource management issues used by the Murray Mallee Local Action Planning
Association will continue into the future.