View
217
Download
0
Category
Preview:
Citation preview
8/19/2019 2 Anr Sard by Tmatsuo 19feb2016
1/16
7th ADB Business Opportunities Fair
16 March 2016
Environment, Natural Resourcesand Agriculture – South Asia
By: Takashi Matsuo
8/19/2019 2 Anr Sard by Tmatsuo 19feb2016
2/16
Country Strategy
BANGLADESH
Country Partnership Strategy, 2011-2015
Country Operations Business Plan, 2016-2018
-- supporting the government's Seventh Five-Year Plan (FY2016-2020)
* climate resilience through support for integrated water resource management
* rural infrastructure development
* flood control and riverbank erosion mitigation
* crop and value chain infrastructure
* irrigation system infrastructure
8/19/2019 2 Anr Sard by Tmatsuo 19feb2016
3/16
Country Strategy
INDIA
Country Partnership Strategy, 2013-2017
Country Operations Business Plan, 2016-2018
-- supporting the government's Twelfth Five-Year Plan
* agribusiness
* agricultural policy, institutional reforms, and capacity development
* surface and groundwater irrigation
* irrigation systems management
* flood-risk management
* marine ecosystem and coastal resources
8/19/2019 2 Anr Sard by Tmatsuo 19feb2016
4/16
Country Strategy
NEPAL
Country Partnership Strategy, 2013-2017
Country Operations Business Plan, 2016-2018
-- supporting the government's Three-Year Plan* irrigation and drainage
* water-based natural resource management
* agricultural policy, institutional reforms, and capacity development
* flood protection
* public-private partnerships
8/19/2019 2 Anr Sard by Tmatsuo 19feb2016
5/16
Country Strategy
SRI LANKA
Country Partnership Strategy, 2012-2016
Interim Country Partnership Strategy, 2015-2016
Country Operations Business Plan, 2016-2018
-- supporting the government's development policy framework
* new, rehabilitated, and modernized irrigation schemes
* water resources management
* fisheries production
8/19/2019 2 Anr Sard by Tmatsuo 19feb2016
6/16
Active Loan & Grant Portfolio
Bangladesh$444M 40%
India $295M26%
Nepal $230M21%
Sri Lanka$151M 13%
As of 16 March 2016
Total of 39 loans and grants
49% of projects administered by
ADB Resident Missions
8/19/2019 2 Anr Sard by Tmatsuo 19feb2016
7/16
Note: Projects are indicative, pending ADB Management and Board approval, and approval timelines are
subject to change.
2016 Lending Pipeline
Country Project NameAmount
($M)Source
Firm1 BAN Rural Infrastructure Maintenance Program (PDA) 2.0 ADF
2 BAN Crop Diversification and Value Chain Infrastructure Development
(PDA)
2.0 ADF
3 IND Assam Integrated Flood and River Erosion Management (Tranche 2) 70.1 OCR
4 IND Climate Adaptation in Vennar Sub-basin in Cauvery Delta 101.0 OCR
5 IND Sustainable Coastal Protection & Management Investment Program(Tranche 2) 75.0 OCR
6 SRI Mahaweli Water Security Investment Program (Tranche 2) 80.0 OCR
50.0 ADF
Standby6 IND National Water Use Efficiency Improvement Project (TA loan) 15.0 OCR
7 IND Agribusiness Infrastructure Development Investment Program
(Tranche 3)
15.0 OCR
8 NEP Agriculture Sector Development Program 50.0 ADF
9 NEP Bagmati River Basin Improvement (Additional Financing) 40.0 ADF
Total 2016 (excluding standby) 380.1
Total 2016 (including standby) 500.1
8/19/2019 2 Anr Sard by Tmatsuo 19feb2016
8/16
2017 Lending Pipeline
Note: Projects are indicative, pending ADB Management and Board approval, and approval timelines
are subject to change.
Country Project NameAmount
($M)Source
1 BAN Rural Infrastructure Maintenance Program 130.0 OCR
50.0 ADF
2 BANFlood and Riverbank Erosion Risk Management Investment Program
(Tranche 2) 100.0 ADF
3 BHU Amochhu River Training and Flood Protection 15.0 ADF
45.0 OCR
4 IND Agribusiness Infrastructure Development Investment Program
(Tranche 3)15.0 OCR
5 INDKarnataka Integrated and Sustainable Water Resource Management
Investment Program (Tranche 2) 119.0 OCR
6 IND Madhya Pradesh Irrigation Efficiency Investment Program (Tranche 1) 315.0 OCR
7 MLD Laamu Gan-Fonadhoo Community Connectivity Project 15.7 ADF
8 NEP Bagmati River Basin Improvement (Additional Financing) 40.0 ADF
9 NEP Large Scale Irrigation Scheme in Terai (PDA) 2.0 ADF
Total 2017 846.7
8/19/2019 2 Anr Sard by Tmatsuo 19feb2016
9/16
2016 Non-Lending Pipeline
Note: Projects are indicative, pending ADB Management and Board approval, and approval timelines are
subject to change.
Country Project NameAmount
($M)Source
1 BAN PPTA: Preparing Ganges-Kobadak and Teesta Barrage 0.2 TASF-V
2 BHU CDTA: Improving Agribusiness (One Village One Product) 0.5 TASF-V
3 BHU PPTA: Amochhu River Training and Flood Prevention Project 0.5 TASF-V
4 NEP CDTA: Implementation of Water Resource Commission Act 0.5 TASF-V
Total 2015 1.7
8/19/2019 2 Anr Sard by Tmatsuo 19feb2016
10/16
Areas of Business Opportunities
CONSULTING SERVICES
* project preparation
* project design
* institutional reforms and capacity building
* project implementation and management support
PHYSICAL WORKS
* irrigation facilities
* river training
* flood protection* dam and channels
* coastal protection
* rural roads
* agribusiness infrastructure
8/19/2019 2 Anr Sard by Tmatsuo 19feb2016
11/16
Opportunities
Estimate
($ million)Method
BangladeshIrrigation Management Improvement Project
3.1 NCB
13.5 ICB
(3 packages)
4.0 NCB
Flood and Riverbank Erosion Risk Management Investment Program (Tranche1) 6.0 ICB
5.2 NCB
12.4 NCB
(5 packages)
3.6 NCB
(2 packages)
Southwest Area Integrated Water Resource Planning and Management Project - Additional Financin
6.6 NCB
1.3 NCB
2.6 NCB
4.8 NCB
1.6 NCB
Riverbank protection works
Works Packages
Embankment construction or resectioning
Khal (canal) re-excavation
Construction of PMP, SMO and WMO office buildings
Embankment construction/rehabilitation
Emergency riverbank protection
Construction and/or rehabilitation of water management structures
Local riverbank protection works
Upgrading of electrical distribution
Farmer distribution, pumps and prepayment meters-stage 2: 5,000 ha
New structures, rehabilitation of structures, rehabilitation of BWDB buildings
Geobags
8/19/2019 2 Anr Sard by Tmatsuo 19feb2016
12/16
Opportunities
Estimate($ million)
Method
India
Orissa Integrated Irrigated Agriculture& Water Management Project - Tranche 2
Various NCB
Sustainable Coastal Protection and Management - Tranche 2
Various ICB / NCB
Nepal
Bagmati River Basin Improvement Project
17.2 ICB
Works Packages
Civil works packages for rehabilitation, extension and modernization of canal
embankments
Construction of Upper Bagmati River Environment Improvement Works
For approval in 2016; civil works on shoreline protection and management
8/19/2019 2 Anr Sard by Tmatsuo 19feb2016
13/16
Opportunities
Estimate
($ million)
Method
Sri Lanka
Mahaweli Water Security Investment Program - Tranche 1
5.6 ICB
1.3 NCB
24.8 ICB21.4 ICB
5.6 NCB
48.0 NCB
5.2 NCB
2.4 NCB
1.4 ICB
Heightening of Minipe Anicut Including Water Control & Measurement
Facilities for LB & RB Canals
Rehabilitation of Minipe LB Canal from 30+140 km to 49+820 km - stage 2
Construction of Upper Elahera Canal From 0+100 km to 6+226 kmConstruction of Main Canal from Nebadagahawatta Wewa to Mahakitula
Wewa
Works Packages
Construction of Mahakithula Inlet Tunnel, Mahakithula & Mahakirula
Reservoirs, Feeder Canal Length 3.66 km from Mahakithula to Mahakirula
Reservoir
Rehabilitation of Minipe LB Canal from 49+820 km to 63+650 km - stage 3
Rehabilitation of Minipe LB Canal from 63+650 to 73+960km - stage 4
Irrigation Control Gates
Wemedilla LBMC from 0+000 Km to 5+250 km & New Sluice and Tail Canal
8/19/2019 2 Anr Sard by Tmatsuo 19feb2016
14/16
Opportunities
Estimate
($ million) Method
Bhutan
Amochhu River Training and Flood Prevention Project
Improving Agribusiness (One VillageOne Product)
Nepal
Water Resources Project Preparatory Facility
0.4 QCBS
Sri Lanka
Mahaweli Water Security Investment Program - Tranche 1
1.4 QCBSImproving System Efficiencies and Water Productivity Consultants
Consulting Services Packages
Preparing Flood Risk Management Projects
For approval in 2016; consulting services packages to be determined.
For approval in 2016; consulting services packages to be determined.
8/19/2019 2 Anr Sard by Tmatsuo 19feb2016
15/16
Contact Us
ENVIRONMENT, NATURAL RESOURCES
AND AGRICULTURE DIVISION (SAER)
SOUTH ASIA DEPARTMENT
INDIA RESIDENT MISSION
M. Teresa Kho
Country Directormtkho@adb.org
L. Boenwanan Sondjaja
Deputy Country Director
lsondjaja@adb.org
Takashi Matsuo
Director
tmatsuo@adb.org
Cindy Malvicini
Principal Portfolio Management Specialist
cmalvicini@adb.orgNEPAL RESIDENT MISSION
BANGLADESH RESIDENT MISSION Kenichi YokoyamaCountry Director
kyokoyama@adb.org
Tika Limbu
Portfolio Management Specialist
tlimbu@adb.org
Kazuhiko Higuchi
Country Director
khiguchi@adb.org
Oleg Tonkonjenkov
Deputy Country Director
otonkonjenkov@adb.org SRI LANKA RESIDENT MISSION
BHUTAN RESIDENT MISSION Sri WidowatiCountry Director
swidowati@adb.org
Taisuke Miyao
Senior Portfolio Management Specialist
tmiyao@adb.org
Tshewang Norbu
Senior Country Coordination Officer
tnorbu@adb.org
mailto:mtkho@adb.orgmailto:lsondjaja@adb.orgmailto:tmatsuo@adb.orgmailto:cmalvicini@adb.orgmailto:kyokoyama@adb.orgmailto:tlimbu@adb.orgmailto:khiguchi@adb.orgmailto:otonkonjenkov@adb.orgmailto:swidowati@adb.orgmailto:tmiyao@adb.orgmailto:tnorbu@adb.orgmailto:tnorbu@adb.orgmailto:tmiyao@adb.orgmailto:swidowati@adb.orgmailto:otonkonjenkov@adb.orgmailto:khiguchi@adb.orgmailto:tlimbu@adb.orgmailto:kyokoyama@adb.orgmailto:cmalvicini@adb.orgmailto:tmatsuo@adb.orgmailto:lsondjaja@adb.orgmailto:mtkho@adb.org
8/19/2019 2 Anr Sard by Tmatsuo 19feb2016
16/16
THANK YOU
Recommended