#190036” x 10’ Sour 720psi Vertical 3 Phase Separator
Condition Field Ready &/or Minor Repair
Manufactured Alco 2003
Location Slave Lake, Alberta
Status Connected
Registration AB/BC/SK
Service Sour
Phases 3 Phase; dressed 2
Vessel Connections Vessel inlet/outlet; 8”300# and 2” dumps & drains.
Meter Run 6” 300# sch40 dual chamber with NACE trim. 5 valve manifold with transmitter.
Instrumentation Barton pressure transmitters, one upstream of inlet controller and one downstream.
Electrical AC interior/exterior lighting, 2) exhaust fans.
Building & Skid 12’ L x 10’6” W building. 14’ x 10’6” skid. 14’SL, 12’3”SW, estimate 14’6” SH with spool on top of vessel removed. (12’6” to top of ridge vent.)
Package Comments 6” 600# inlet controller, 2) AC lit Cata-dyne 24” x 24” heaters, H2S & LEL detection. Vessel nitrogen purged in 2013.