FEASIBILITY OF BANGALOREMETRO RAIL PROJECT(NAMMA
PROJECT)
7/31/2019 16471683 Bangalore Metro Rail Project
2/91
WHY B.M.R.C PROJECT AS
NAMMA PROJECT???
7/31/2019 16471683 Bangalore Metro Rail Project
3/91
By:-
7/31/2019 16471683 Bangalore Metro Rail Project
4/91
METRO PLANNING WORLD FACTS
All developed countries start planning for a Metro when the population of the city nears one millionmark.By the time the population level reaches two million
mark a Metro network is in place.
7/31/2019 16471683 Bangalore Metro Rail Project
5/91
TYPES OF METRO A Metro can be either underground or elevated and incase of outskirts of the cities on the ground even.Metros can be :-
Heavy capacity with a capacity of 60-90,000 phpdt.Medium capacity with a capacity of 40-50,000 phpdt, or,
A light metro with the capacity ranging from 25-30,000 phpdt. When the traffic volume exceeds 12,000 phpdt it can behandled only by a rail-based Metro System.Metros can be either with pneumatic wheels or steel
wheels on steel rails. In either case the traction is by electric energy.Other MRTS modes are Mono Rail, Sky Bus, HighCapacity buses etc.
7/31/2019 16471683 Bangalore Metro Rail Project
6/91
7/31/2019 16471683 Bangalore Metro Rail Project
7/91
Types of project feasibility analysis
Technical feasibility Marketing feasibility
Socio-economic feasibility Managerial feasibility Financial feasibility
7/31/2019 16471683 Bangalore Metro Rail Project
8/91
TECHNICAL FEASIBILITY:-
7/31/2019 16471683 Bangalore Metro Rail Project
9/91
Metro train important features3 cars train sets ( DMC TC - DMC) : CAPACITY 1000 passengers
750 v d.c , third rail , bottom current collector systemStainless steel carbody
3 phase AC asynchronous motors with variable voltage and variablefrequencyMicroprocessor controlled
7/31/2019 16471683 Bangalore Metro Rail Project
10/91
Saloon features:-
(A) Wide gangway between cars to allow free movement of passengers
(B) Smooth finish interior panels ( graffitis resistant)(C) Non slip and non skid floor structure.
7/31/2019 16471683 Bangalore Metro Rail Project
11/91
Rolling stock operation parameters(1) Services to start from 5a.m till midnight (19 hours in a day)(2) Frequency Peak : 4 minutes
( expandable to 2 mts )
(3) Journey time : 33 mts EAST - WEST28 MTS NORTH SOUTH
(4) DWELL TIME : 30 sec(5) Maximum speed : 80 km/hr
7/31/2019 16471683 Bangalore Metro Rail Project
12/91
Aero dynamic cab styling Modernized car body contour Exterior panels and wide
windows stainless steel without paint
4 wide doors on each side
Vehicle Exterior View
7/31/2019 16471683 Bangalore Metro Rail Project
13/91
Optimized arrangement of Interior passengers facilities Harmonized and modernized Interior Color Scheme Scratch proof interior panel
Skid free, fire resistant floor
Vehicle Interior View
7/31/2019 16471683 Bangalore Metro Rail Project
14/91
Passenger Facility(1) 4 wide passengers automatic access doors in each side.
(2) Wide and clear windows .(3) Completely air- conditioned coaches(4) Earmarked space for persons with disability.(5) Wi-fi sytem accessibility(6) Information to passengers ;(7) Automatic voice announcement system(8) Electronic information display(9) Electronic destination display .
7/31/2019 16471683 Bangalore Metro Rail Project
15/91
ROLLING STOCK - SAFETY ASPECTS(1) ATP automatic train protection : protection to train with driversupervision.(2) ATO automatic train operation :automatic start ,acceleration& deceleration(3) ATC :automatic train control :(ATP+ ATO)(4) TRAIN MANAGEMENT SYSTEM :TMS :
information for operation & maintenance(5) Microproccessor control & brake system(6) Safety door closing / opening(7) Surveillance cameras for security ( CCTV)
(8) Voice communication between passengers & drivers(9) Emergency announcement from operational control centre.
7/31/2019 16471683 Bangalore Metro Rail Project
16/91
COACHES:-Max. permissible speed 80 kmphrCommercial speed 32 KmphrCoach body Stainless steel
Length - 20.8 mWidth - 2.88mHeight 3.80m
Carrying capacity About 50 sitting &306 standing (at 8person per sq. m .area)
Axle load 15 tonnesClass of accomodation oneTraction motors: coaches 4 of 180 Kw each in motorAcceleration Max 1.0 m/sec ^2Decceleration Max 1.1 m/sec ^2(normal)Additional features Air conditioning
Automatic door closing
7/31/2019 16471683 Bangalore Metro Rail Project
17/91
AUTOMATIC FARE COLLECTION Automatic Fare Collection (AFC) Gates
Stand near the AFC GatesEntry:
Hold your Token/ Smart Card closeto the machine
Exit:Token Users: Drop your token intothe machine
7/31/2019 16471683 Bangalore Metro Rail Project
18/91
7/31/2019 16471683 Bangalore Metro Rail Project
19/91
Design underground elevated
6.76 km25.65 km
Schedule speed 32 to 80 kmph
Frequency of train 4.0 min.
PHPDTFuture PHPDT
40,00080,000
7/31/2019 16471683 Bangalore Metro Rail Project
20/91
7/31/2019 16471683 Bangalore Metro Rail Project
21/91
7/31/2019 16471683 Bangalore Metro Rail Project
22/91
7/31/2019 16471683 Bangalore Metro Rail Project
23/91
METRO Rail Features :
Level platforms at all rail stations for easy boarding Audible and digital station announcements inside thetrain and also at the stationFrequent service Wheelchairs tie-downs are not needed on the trainsbecause of the smooth ride
METRO Rail stops at all stations and the doors openautomatically
7/31/2019 16471683 Bangalore Metro Rail Project
24/91
An elevated metro rail, with two lines (up and down lines) on a deck
erected on pillars generally in the central median of the road, withoutobstructing the road traffic;
Standard gauge (1435 mm);
Stations located at an average interval of 1km elevated stations with
passenger access through staircases, escalators & lifts;
Adequate parking space and circulating areas to be provided (mostly on
Govt. lands) at the stations;
Frequency of 3 to 4 minutes during peak hours;
The system is expected to carry about 1.57 million passengers per day by
2011 and 2.57 million by 2021
24
SALIENT FEATURES OF THE METRO RAIL PROJECT :-
7/31/2019 16471683 Bangalore Metro Rail Project
25/91
Rails to be continuously welded to minimize noise levels;
Power supply through 3rd rail bottom collection (750 v DC);
Coaches air-conditioned with automatic door-closures and many
safety features;
Signaling system ensures safety and specified speeds through
Automatic Train Control (ATC), Automatic Train Protection (ATP) and Automatic Train Operation (ATO);
Telecommunication facilities to be state of the art, facilitating
continuous communication between Central Control, train drivers
and station masters.
25
Contd
7/31/2019 16471683 Bangalore Metro Rail Project
26/91
7/31/2019 16471683 Bangalore Metro Rail Project
27/91
7/31/2019 16471683 Bangalore Metro Rail Project
28/91
MARKET ANALYSISINDUSTRY ANALYASIS AND OUTLOOKTARGET MARKET STUDY
PRIMARY MARKET SIZECOMPETITION
7/31/2019 16471683 Bangalore Metro Rail Project
29/91
INDUSTRY ANALYSIS AND OUTLOOK1) DESCRIPTION OF INDUSTRY(BANGALORE METRO RAIL
CORPORATION) NAMMA METRO:-Bangalore, the IT Capital of India is bustling with
development of infrastructure. The city of Bangalore with agrowing population of 6.8 million sued with traffic chaosowing to steep rise in number of private vehicles in the form of
two wheelers and cars.Namma Metro (Our metro) / The Bangalore Metro isthe under-construction mass-transit rail system for the cityof Bangalore, India. The agency responsible for itsimplementation is Bangalore Metro Rail Corporation Ltd(BMRCL). Navayuga Engineering has been awarded thecontract to construct Reach 1 on the East-West line. Fiveconsortia have been short-listed as general consultants for theproject.
7/31/2019 16471683 Bangalore Metro Rail Project
30/91
2) SIZE OF THE INDUSTRY AND FUTURE GROWTH PROJECTIONS:-
The total project outlay was estimated at Rs 6395 crore in 2006.
At present metro project is been projected only till inner ring-roads but inthe future it will be expanding to outer ring-roads also.
7/31/2019 16471683 Bangalore Metro Rail Project
31/91
7/31/2019 16471683 Bangalore Metro Rail Project
32/91
7/31/2019 16471683 Bangalore Metro Rail Project
33/91
PRIMARY MARKET SIZE
BEML Ltd has bagged a Rs.1672.50 crore order from Bangalore MetroRail Corporation to supply 150 metro rail coaches by October 2010.
BEML, would be assisted by South Korea-based Rotom andJapan-based Melco and Mitsubishi in the manufacture of metro rail coaches.
PROSPECTIVE COMMUTERSTotal number of commuters which can use the metro are 45000-50000 per
hourCommuters travel can be much more economical with a proposed fare of
1.33-1.63 times then bus fares.Annual escalation fares at 4%
7/31/2019 16471683 Bangalore Metro Rail Project
34/91
FORCASTED ANNUAL SALESTotal number of commuters travelling per day:820,000
Approx metro fare :Rs 7-15 per commutersAnnual sales: 820,000 x 15 x 365
:4489500000: 4.4895 billions
7/31/2019 16471683 Bangalore Metro Rail Project
35/91
7/31/2019 16471683 Bangalore Metro Rail Project
36/91
7/31/2019 16471683 Bangalore Metro Rail Project
37/91
How to achieve the huge market share
Improve customer services
Keep an eye on current levels of crime
Better systems to manage a fare structure
Easily availability of tickets or having a system of E-ticket.
7/31/2019 16471683 Bangalore Metro Rail Project
38/91
Action plans to increase the market share..Promote positive aspects of rail commuting
Train front line staff in customer careDevelop an appropriate advertising campaignCommission market research to establish customer needs and
expectations
Develop a commercial customer services mindset among staff Promote off-peak, special event and weekend servicesIntroduction of various refreshment schemesStrong branding (as "Metrorail" or any brand )
7/31/2019 16471683 Bangalore Metro Rail Project
39/91
7/31/2019 16471683 Bangalore Metro Rail Project
40/91
7/31/2019 16471683 Bangalore Metro Rail Project
41/91
7/31/2019 16471683 Bangalore Metro Rail Project
42/91
Demand ForecastingSafe and ReliableLow-Fares to commuters than other transport
Advertisements on trains, eg: Sprite adds on doors of trains.
Air-Conditioned coachesFast and comfortable journeyAutomatic doors with obstruction detection
The unique feature of Bangalore Metro is its integration with othermodes of public transport, enabling the commuters conveniently inter-change from one mode to another. Because of proper planning in of METRO.
7/31/2019 16471683 Bangalore Metro Rail Project
43/91
SOCIO ECONOMIC FEASIBILITY:-
7/31/2019 16471683 Bangalore Metro Rail Project
44/91
7/31/2019 16471683 Bangalore Metro Rail Project
45/91
7/31/2019 16471683 Bangalore Metro Rail Project
46/91
7/31/2019 16471683 Bangalore Metro Rail Project
47/91
The perfect Plan The city bus corridors will not run parallel to
Bangalore Metro corridors, instead buses will act asfeeders. The mono rail network planned for the city will not overlap with that of the metro, but willconnect at major junctions as feeders. On certain highdensity corridors, three wheelers will be regulated.Feeder bus services will be provided to all the metrostations.Bus bays and parking facilities for private vehicles willbe available at all major stations. State-of-the-art satellite bus-cum-metro terminals are beingplanned in the city outskirts, to control the entry of inter-city buses.
7/31/2019 16471683 Bangalore Metro Rail Project
48/91
7/31/2019 16471683 Bangalore Metro Rail Project
49/91
IssuesThere has not been sufficient examination of transport's impact on social issues within a qualitativeframework.It is important to also consider the flow of socialcapital in the form of information, news, or jobopportunities facilitated through transport networks.
7/31/2019 16471683 Bangalore Metro Rail Project
50/91
Transport
The role of transport in facilitating or limiting socialcapital expands economic criteria models whenmeasuring the impact of transport projects.The benefits of improving transport infrastructurehave traditionally been measured by performancecriteria, like improved connectivity, travel time,speeds and fuel savings.
The costs of improvements in transport infrastructureare classically defined as construction cost, ongoingoperations and maintenance cost.
7/31/2019 16471683 Bangalore Metro Rail Project
51/91
7/31/2019 16471683 Bangalore Metro Rail Project
52/91
Negative Impact Of Metro
7/31/2019 16471683 Bangalore Metro Rail Project
53/91
Negative Impact Of MetroProject
During this phase, those impacts, which are likely to takeplace due to the layout of the project, have been assessed.
These impacts are:-
Project Affected People (PAPs)Loss of trees/forest;Utility/Drainage Problems, and
Loss of Historical and Cultural MonumentsSoil Erosion, Pollution and Health Risk at Construction Site.Increased Water Demand.Noise Pollution.
7/31/2019 16471683 Bangalore Metro Rail Project
54/91
BUSINESS STRUCTURE OF BANGLORE
METRO RAIL PROJECT
MANAGERIAL FEASIBILITY
OF BANGALORE METRO RAIL PROJECT
7/31/2019 16471683 Bangalore Metro Rail Project
55/91
7/31/2019 16471683 Bangalore Metro Rail Project
56/91
Legal structure :The Rs 6,395-crore Bangalore Metro Rail project will not be scrapped.The government has accepted the Justice Shivshankar Bhat Committeereport, which recommended that the project will go along the CMHRoad alignment .
Allaying people's fears, he announced a rehabilitation package forfamilies and business establishments on CMH Road and MahakaviKuvempu Road who would be affected by the acquisition of 28 acres of private land.
The package for CMH Road residents and all other property losses willcost the exchequer about Rs 30 crore. As recommended by theShivshankar Bhat Committee, the rehabilitation package will includeallotment of sites by BDA, provision of house rent for six months toaffected households, and 10-month rent to affected businessestablishments.
7/31/2019 16471683 Bangalore Metro Rail Project
57/91
7/31/2019 16471683 Bangalore Metro Rail Project
58/91
7/31/2019 16471683 Bangalore Metro Rail Project
59/91
Consultants and service providers:Public sector firm BEML has got railway equipment and component orders of over Rs4,000 crore, as per said by company chairman and managing director V R S Natarajan.
The first order worth Rs 1,672.50 crore from the Bangalore Metro Rail Corporation(BMRC) is for the supply of metro coaches, including spares, for Phase I of the project by October 2010. BEML is expecting an additional order of metro coaches for furtherexpansion and extension of proposed metro lines in Bangalore city.
The rolling stock order will comprise 50 train sets of three cars each and will beimplemented by a consortium comprising BEML, Rotem and Mitsubishi, Natarajan said. Additional orders for the Bangalore Metro in the coming months, depending onrequirements, are expected to involve supply of 30 coaches for Rs 300 crore, and at a laterpoint, a Rs 600-crore order for another 63 coaches.
Nine general consultants are in the race to bag the contract for developing the design andconstructing the Bangalore Metro Rail. The Bangalore Metro Rail Corporation (BMRC) isscrutinising the documents submitted by the nine consultants, including one by RailIndia Tecno and Economic Services (RITE )
Detailed Design Consultants
7/31/2019 16471683 Bangalore Metro Rail Project
60/91
Detailed Design Consultants(DDC) awarded to RITES for Reach1.
Span Consultants for Reach 2
Setup Consultants for Reach 3
Detailed Design Consultants(DDC) for Stations awarded as
follows: Reach 2 - Span Consultants,Reach 3 - S N Bhobe Associates,Reach 4 - L&T Ramboll
Consulting Engineers Ltd.Design work under progress
Cont
Cont
7/31/2019 16471683 Bangalore Metro Rail Project
61/91
Navayuga Engineering Company Ltd wasawarded the work of constructingelevated structure (viaduct) between ch11200m to ch 17600m excluding stationportions from Byappanahalli to CricketStadium (Reach-1) section of BangaloreMetro.
Widening of road in R1, R2 and R3 isbeing undertaken by SurendraConstruction Pvt Ltd.
7/31/2019 16471683 Bangalore Metro Rail Project
62/91
Skilled and experienced business
managers:Siemens AG of Germany Bombardier Transportation GmbH
Alstom Projects India LtdThe local subsidiary of Frances Alstom Corp ., and state-run BEMLLtdto build and supply coaches for the local rail network it is buidingin Indias technology hub.
7/31/2019 16471683 Bangalore Metro Rail Project
63/91
Business Founders:The project involves no private participation , however the stategovernment has formed a committee i.e Shivshankar Bhatt committee ;project recommended to follow C.M.H Road allignment .
Bangalore metro rail corporation ( B.M.R.C) is heading the project withnine consultants and service providers.
Private organisation like siemens & contractors have taken contract for
supply of coaches. Hence, there is no specific business founder to be givencredit for thisMassive metro project , its with combined efforts Of cohesion of state government & private contractors.
Governance Participation :
7/31/2019 16471683 Bangalore Metro Rail Project
64/91
Sl.No Name & Address Nominated by
1 Dr. M RamachandranSecretary - Ministry of Urban DevelopmentGovernment of IndiaChairman, Bangalore Metro Rail Corporation Ltd.
Nirman Bhavan New Delhi 110 011
Govt. Of India
2 Sri S K LohiaDirector - Urban TransportMinistry of Urban DevelopmentGovernment of IndiaDirector, BMRCLNirman BhavanNew Delhi 110 011
Govt. Of India
3 Sri Satish KumarDirector (Electrical)Delhi Metro Rail Corporation LtdNBCC Place, Pragathi ViharBhishma Pitamah MargNew Delhi 110 003
Govt. Of India
4 Sri R.P.Gupta Advisor (Works)Ministry of RailwaysGovernment of IndiaNew Delhi 110 001
Govt. Of India
5 Sri Anil Baijal, IAS (Retd)Director - BMRCLE-524, II FloorGreater Kailash-IINew Delhi 110 048
Govt. Of India
6 Sri M.LakshminarayanaSecretary to Hon'ble Chief MinisterGovernment of Karnataka
Vidhana SoudhaBangalore 560 001
Govt. Of karnataka
7/31/2019 16471683 Bangalore Metro Rail Project
65/91
CHALLENGES
7/31/2019 16471683 Bangalore Metro Rail Project
66/91
CHALLENGES
Bangalore Metro Project is the biggest urbanintervention.
Project is to be executed in very difficult urban
environments. Being the IT heart of India all actions under closescrutiny.
The Project implementation period august 2005 todecember 2011 .
Metro being constructed to world class standardswith frontline technologies.
CHALLENGES
7/31/2019 16471683 Bangalore Metro Rail Project
67/91
CHALLENGES The expertise and technology not available in the country.
Legal cover needed for construction and operations not in
position. The sensitivities of the city to be respected during
construction No hardship or inconvenience to the public Structures should be aesthetic & merge with surroundings.
Large number of utilities. Religious & Archaeological structures.
7/31/2019 16471683 Bangalore Metro Rail Project
68/91
FINANCIAL PERSPECTIVE:-
PROJECT COST
7/31/2019 16471683 Bangalore Metro Rail Project
69/91
PROJECT COST
7/31/2019 16471683 Bangalore Metro Rail Project
70/91
7/31/2019 16471683 Bangalore Metro Rail Project
71/91
Project cost DetailsEstimation of cost in Rs . Crores
The estimated cost of the project approved by the Governmentof Indiabased on April 2005 prices is as under:-
Construction cost : 5080 (5912)*Interest during construction : 348 (449)*Financing charges &Pre-operative expenses : 25 (29)*TOTAL Current Cost : 5453 (6395)**( completion cost which is the current cost + an annualescalation of 5% per year for the likely duration of theproject.)
7/31/2019 16471683 Bangalore Metro Rail Project
72/91
Source of fund
State: Rs 1807 crCentre/Federal: Rs 1447 crFinancial Institutions: Rs 2953 cr
Interest rate : Approx 8.75% for a 15 year term loan,line of credit form insurance companies and providentfund agencies comes for 25 years at 9% interest
7/31/2019 16471683 Bangalore Metro Rail Project
73/91
7/31/2019 16471683 Bangalore Metro Rail Project
74/91
7/31/2019 16471683 Bangalore Metro Rail Project
75/91
7/31/2019 16471683 Bangalore Metro Rail Project
76/91
7/31/2019 16471683 Bangalore Metro Rail Project
77/91
7/31/2019 16471683 Bangalore Metro Rail Project
78/91
7/31/2019 16471683 Bangalore Metro Rail Project
79/91
CARRYING CAPACITY
The Bangalore Metro has been designed for a capacity of 40,000 PHPDT.
The number of passengers expected to travel on the
metro everyday is 10.20 lakhs in 2011and 16.10 lakhs in 2021.
COMFORTABLE
7/31/2019 16471683 Bangalore Metro Rail Project
80/91
COMFORTABLETRAVEL..priceless
The Bangalore Metro comes with a package deal.Comfortable
quick, safer and economicalits energy requirement per passenger km. is only one-fifth of that of road based systems.Commuters can breathe easy, there will be no airpollution as the system runs on electric power. Theeconomic rate of return is 22.3%
7/31/2019 16471683 Bangalore Metro Rail Project
81/91
7/31/2019 16471683 Bangalore Metro Rail Project
82/91
h
7/31/2019 16471683 Bangalore Metro Rail Project
83/91
Phase : 1
North-South Corridor ( 23.7km)Stations: Hesaraghatta Cross, T Dasarahalli, Jalahalli, PeenyaIndustrial Area, Peenya Village, Outer Ring Road, Yeshwantpur,Mahalakshmi Layout, Rajajinagar, Malleswaram, Swastik,
Majestic, Chickpet, City Market, K R Road, South End Circle, Jayanagar, R V Road, Banashankari, J P Nagar, Puttenahalli.
East-West Corridor (18.1km)Stations: Baiyappanahalli, Old Madras Road, C M H Road,Ulsoor, Trinity Circle, M G Road, Cricket Stadium, VidhanaSoudha, Central College, Majestic, City Railway Station, MagadiRoad, Tollgate, Hosahalli, Vijayanagar, Deepanjalinagar, MysoreRoad
D i i f Fi Ph
7/31/2019 16471683 Bangalore Metro Rail Project
84/91
Description of First Phase:-The first phase of the Bangalore Metro consists of two lines of electrifieddouble track.
1. The first one, East West, will be 18km long and the second, North South,15 km long.
2. They will cross at Majestic station. The greatest part will be elevated, exceptfor 6.7 km underground near Majestic station, City Railway Station, Vidhana Souda and City Market.
3. The project is partly funded by the Japanese Bank for InternationalCooperation (JBIC).
4. The project management team would give assistance to the owner BMRC onall aspects of the project, in particular : supervision and commissioning of works, monitoring of quality, integration of the metro with the other modes
of transport in Bangalore city.5. The contract period is till December 2012.6. Bangalore is the third Indian metropolis, after Delhi and Mumbay, to
choose SYSTRA for its metro project. SYSTRA is also recognised in India forits know-how concerning major civil works (Signature Bridge, ChambalBridge, Pragati Maidan Bridge).
7/31/2019 16471683 Bangalore Metro Rail Project
85/91
Phase II
Lines built during Phase-I are likely to be extendedfurther. The Technology clusters in the South & Eastof the City are planned to be connected with Yelahanka in the North. Route alignments are yet tobe finalized
Some of the space which is going to be
7/31/2019 16471683 Bangalore Metro Rail Project
86/91
Some of the space which is going to beclaimed by BMRTL for the project are:-
4,126 sq mt of Central Bus Sand in Majestic.On MG Road the project will use 14 sq mt of Nalli Silksand 25 sq mt of Land Mark building.210 sq mt of IOC petrol bunk near Trinity Circle .Trinity Complex, Megdooth Motors, Police Quarters onUlsoor Road .Part of Govt Kannada Primary School at Srirampuram,Govt Urdu School at Chickpet .
74 sq mt of Bangalore Hospital on RV Road .4,320 sq mt of Mysore Mills behind Maharaja Mills .119,000 sq mt of private industry land on Tumkur Road
7/31/2019 16471683 Bangalore Metro Rail Project
87/91
RECOMMENDATION:-States be given powers to legislate on the operationand maintenance of the projectsCommissioner of Railway Safety to have powers toissue safety certification for metro systemsthe Centre would extend financial and logistic supportfor the implementation of the metro project.the choice of gauge is to be left to the concerned Stategovernments to decide.right choice of roots.
7/31/2019 16471683 Bangalore Metro Rail Project
88/91
REFERENCE:sources collected fromhttp://www.google.com http://www.businesstandard.com http://www.karnataka.com http://www.bmrc.com http://www.thehindu.com
http://www.youtube.com
http://www.google.com/http://www.businesstandard.com/http://www.karnataka.com/http://www.bmrc.com/http://www.thehindu.com/http://www.thehindu.com/http://www.bmrc.com/http://www.karnataka.com/http://www.businesstandard.com/http://www.google.com/7/31/2019 16471683 Bangalore Metro Rail Project
89/91
7/31/2019 16471683 Bangalore Metro Rail Project
90/91
7/31/2019 16471683 Bangalore Metro Rail Project
91/91
Recommended