20-11-2015

1

Claus Iversen

2008 – til i dag, Construction Manager, D&R and Marine Works, Femern A/S

2005 – 2008 Construction Manager, Bosphorus, Istanbul, The Marmaray Project, Immersed Tunnel

1995 – 2001 Contract Director, D&RØresundskonsortiet, DK

1975 – 1995, Danish Hydraulic InstituteMarine Works

CIV 210. september 2015

20-11-2015

2

CIV

CIV

20-11-2015

3

Øresund tunnelfabrikNordhavn, København

10. september 20155

10. september 2015CIV

20-11-2015

4

10. september 2015CIV

The Marmaray Project

• Total length of CR-Project app. 77 km:– At grade, European side 19.6 km – At grade, Asian side 43.4 km– Bored tunnels 12.2 km– Immersed tube tunnel 1.4 km

10. september 2015CIV 8From Halkali to Gebze

20-11-2015

5

The Background (1860)

10. september 2015CIV 9

Gravet ned i havbunden

10. september 2015CIV 10

20-11-2015

6

Dredging Works

CIV 11

Contaminated soil: 120.000 m3 Clean soil: 1.000.000 m3

Stone backfill: 130.000 m3 Soil backfill: 800.000 m3

Immersed Tunnel Yard

10. september 2015CIV 12

20-11-2015

7

Tuzla Construction Yard

10. september 2015CIV 13

20-11-2015

8

20-11-2015

9

10. september 2015CIV 17

20-11-2015

10

Elements, today, E4 – E1

10. september 2015CIV 20

20-11-2015

11

Bosphorus, Marine Works

10. september 2015CIV 22

20-11-2015

12

20-11-2015

13

Nedsænket på et tunnelfundament

10. september 2015CIV 25

Tunnelfundament

CIV10. september 2015

26

20-11-2015

14

Bosphorus, Marine Works

10. september 2015CIV 27

20-11-2015

15

Immersion Barge

10. september 2015CIV 29

CIV 30

Preparing element for immersion

10. september 2015

20-11-2015

16

Sænkning af elementer

CIV10. september 2015

31

Monteringsudstyr oven på elementerne

CIV 3210. september 2015

20-11-2015

17

Sammenkobling mellem tunnelelement ogsænkepram

CIV10. september 2015

33

Indvendigt udstyr i elementerne

CIV10. september 2015

34

20-11-2015

18

Inside Element 7, today

10. september 2015CIV 35

Tunnelelement klart til nedsænkning

CIV10. september 2015

36

20-11-2015

19

CIV

Wirer så tykke som håndled

Udstyr i kontrolrummet

CIV 3810. september 2015

20-11-2015

20

10. september 2015CIV

Tunnelportal og ramper

40

20-11-2015

21

10. september 2015CIV 41

10. september 2015CIV 42

20-11-2015

22

10. september 2015CIV 43

20-11-2015

23