1 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page1of271

Attachments Y/N

H&S Site Survey Report Yes

Lifting Plan na EHS Manager:Hot Work Permit No

Site Emergency Response Plan Yes Supervisor:

Date of implementation: __24 ___/____02___/__2016_

RISK ASSESSMENTRISK ASSESSMENT Site ID - 1029 MP (GF) Site ID - 1029 MP (GF)

2 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page2of271

I herby confirm that I have read the below requirements and risk assessment and shall strictly follow and implement, and in case of conflicts or doubts I shall consult with company H&S Manager to use the dynamic risk assessment, and I am fully responsible for my own safety and the safety of all the crew working on my site. and I confirm that all H&S documents shall be on site whenever any work is carried out.

Team leader will check for any leakage or spillage on site before start of any activity. If found team leader must report it to project management immediately.Two meters ladder will be used by riggers to work on cable tray Rigger will use double lanyard to climb on the tower for access to the AntennasRigger's fall arrester will be connected to tower safety wire while climbingEnsure that AC and DC Power must be locked-out and tagged-out.Only the certified and competent electrician will do the isolation of power.Ensure the grounding is connected to the bus bar. Use only insulated tools.1. Any Activity Must be suspended when it gets dark2. All working at height activities and crane operations are prohibited between sunset and sunrise (from 6:30 PM - 5:40 AM)3. Do not access site without the required mandatory PPE (Helmet, Safety Shoes and VIS Jacket) and do not remove them when inside the site.4. Other job based PPE requirements are stated in the below risk assessment based on the required activity5. Do not access the site without having valid safety passport6. Follow the heat stress guidelines7. Monitor wind speed regularly8. Pre-Task Briefing Must be done before any work on site, and must include all team members.9. Warning Tape and H&S Signs are to be used where required (as mentioned in the below risk assessment)

General Notes

3 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page3of271

Team leader will check for any leakage or spillage on site before start of any activity. If found team leader must report it to project management immediately.Two meters ladder will be used by riggers to work on cable tray Rigger will use double lanyard to climb on the tower for access to the AntennasRigger's fall arrester will be connected to tower safety wire while climbingEnsure that AC and DC Power must be locked-out and tagged-out.Only the certified and competent electrician will do the isolation of power.Ensure the grounding is connected to the bus bar. Use only insulated tools.1. Any Activity Must be suspended when it gets dark2. All working at height activities and crane operations are prohibited between sunset and sunrise (from 6:30 PM - 5:40 AM)3. Do not access site without the required mandatory PPE (Helmet, Safety Shoes and VIS Jacket) and do not remove them when inside the site.4. Other job based PPE requirements are stated in the below risk assessment based on the required activity5. Do not access the site without having valid safety passport6. Follow the heat stress guidelines7. Monitor wind speed regularly8. Pre-Task Briefing Must be done before any work on site, and must include all team members.9. Warning Tape and H&S Signs are to be used where required (as mentioned in the below risk assessment)

4 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page4of271

Team leader will check for any leakage or spillage on site before start of any activity. If found team leader must report it to project management immediately.Two meters ladder will be used by riggers to work on cable tray Rigger will use double lanyard to climb on the tower for access to the AntennasRigger's fall arrester will be connected to tower safety wire while climbingEnsure that AC and DC Power must be locked-out and tagged-out.Only the certified and competent electrician will do the isolation of power.Ensure the grounding is connected to the bus bar. Use only insulated tools.1. Any Activity Must be suspended when it gets dark2. All working at height activities and crane operations are prohibited between sunset and sunrise (from 6:30 PM - 5:40 AM)3. Do not access site without the required mandatory PPE (Helmet, Safety Shoes and VIS Jacket) and do not remove them when inside the site.4. Other job based PPE requirements are stated in the below risk assessment based on the required activity5. Do not access the site without having valid safety passport6. Follow the heat stress guidelines7. Monitor wind speed regularly8. Pre-Task Briefing Must be done before any work on site, and must include all team members.9. Warning Tape and H&S Signs are to be used where required (as mentioned in the below risk assessment)

Site Photos

Risk Assessment

5 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page5of271

Risk Assessment

6 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page6of271

TASK HAZARD RISK

7 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page7of271

TASK HAZARD RISK

Transportation Driving/Traffic Hazards

fatality,Injury, Property Damage

8 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page8of271

TASK HAZARD RISK

Shifting of material from vehicle to site workplace (Manual Handling)

Weight or/and Dimensions of the material

back injury, foot injury

9 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page9of271

TASK HAZARD RISK

Working at heightHeight, Falling Objects

Fatality,Injury, Property Damage

10 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page10of271

TASK HAZARD RISK

RIGGING (Pulling material from Ground to Tower height)

Falling of object/Strong wind

Material damage/Injury

11 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page11of271

TASK HAZARD RISK

Installation of RRUs and Anntennas

falling objects, dropping objects

fatality, injury, property damage

12 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page12of271

TASK HAZARD RISK

Installation of RRUs and Anntennas

falling objects, dropping objects

fatality, injury, property damage

13 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page13of271

TASK HAZARD RISK

FallingFixing cables from anntenas to the cabinet

Injury, Fatalty, Property Damage

14 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page14of271

TASK HAZARD RISK

sharp cable, wrong coConnect BTS power cable to Rectifier

Injury, Property Damage

15 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page15of271

TASK HAZARD RISK

Using Of Hantools.Cut, Puncture, Abbravassion

injury, property damage

16 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page16of271

TASK HAZARD RISK

RF Exposure RadiationsBad health effects, cancer

17 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page17of271

TASK HAZARD RISK

Working on cable trays trip/fall injury

18 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page18of271

TASK HAZARD RISK

injury/infectionWaste Collecting/site Cleaning and transfer to waste disposal area

House keeping/sharp edges/tripping hazard/dust

19 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page19of271

TASK HAZARD RISK

20 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page20of271

TASK HAZARD RISK

21 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page21of271

TASK HAZARD RISK

22 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page22of271

TASK HAZARD RISK

23 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page23of271

TASK HAZARD RISK

24 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page24of271

TASK HAZARD RISK

25 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page25of271

TASK HAZARD RISK

26 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page26of271

TASK HAZARD RISK

27 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page27of271

TASK HAZARD RISK

28 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page28of271

TASK HAZARD RISK

29 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page29of271

TASK HAZARD RISK

30 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page30of271

TASK HAZARD RISK

31 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page31of271

TASK HAZARD RISK

32 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page32of271

TASK HAZARD RISK

33 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page33of271

TASK HAZARD RISK

34 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page34of271

TASK HAZARD RISK

35 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page35of271

TASK HAZARD RISK

36 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page36of271

TASK HAZARD RISK

37 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page37of271

TASK HAZARD RISK

38 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page38of271

TASK HAZARD RISK

39 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page39of271

TASK HAZARD RISK

40 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page40of271

TASK HAZARD RISK

41 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page41of271

TASK HAZARD RISK

42 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page42of271

TASK HAZARD RISK

43 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page43of271

TASK HAZARD RISK

44 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page44of271

TASK HAZARD RISK

45 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page45of271

TASK HAZARD RISK

46 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page46of271

Dennis

Ayub

Date of implementation: __24 ___/____02___/__2016_

Site ID - 1029 MP (GF) Site ID - 1029 MP (GF)

47 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page47of271

I herby confirm that I have read the below requirements and risk assessment and shall strictly follow and implement, and in case of conflicts or doubts I shall consult with company H&S Manager to use the dynamic risk assessment, and I am fully responsible for my own safety and the safety of all the crew working on my site. and I confirm that all H&S documents shall be on site whenever any work is carried out.

Team leader will check for any leakage or spillage on site before start of any activity. If found team leader must report it to project management immediately.Two meters ladder will be used by riggers to work on cable tray Rigger will use double lanyard to climb on the tower for access to the AntennasRigger's fall arrester will be connected to tower safety wire while climbingEnsure that AC and DC Power must be locked-out and tagged-out.Only the certified and competent electrician will do the isolation of power.Ensure the grounding is connected to the bus bar. Use only insulated tools.1. Any Activity Must be suspended when it gets dark2. All working at height activities and crane operations are prohibited between sunset and sunrise (from 6:30 PM - 5:40 AM)3. Do not access site without the required mandatory PPE (Helmet, Safety Shoes and VIS Jacket) and do not remove them when inside the site.4. Other job based PPE requirements are stated in the below risk assessment based on the required activity5. Do not access the site without having valid safety passport6. Follow the heat stress guidelines7. Monitor wind speed regularly8. Pre-Task Briefing Must be done before any work on site, and must include all team members.9. Warning Tape and H&S Signs are to be used where required (as mentioned in the below risk assessment)

General Notes

48 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page48of271

Team leader will check for any leakage or spillage on site before start of any activity. If found team leader must report it to project management immediately.Two meters ladder will be used by riggers to work on cable tray Rigger will use double lanyard to climb on the tower for access to the AntennasRigger's fall arrester will be connected to tower safety wire while climbingEnsure that AC and DC Power must be locked-out and tagged-out.Only the certified and competent electrician will do the isolation of power.Ensure the grounding is connected to the bus bar. Use only insulated tools.1. Any Activity Must be suspended when it gets dark2. All working at height activities and crane operations are prohibited between sunset and sunrise (from 6:30 PM - 5:40 AM)3. Do not access site without the required mandatory PPE (Helmet, Safety Shoes and VIS Jacket) and do not remove them when inside the site.4. Other job based PPE requirements are stated in the below risk assessment based on the required activity5. Do not access the site without having valid safety passport6. Follow the heat stress guidelines7. Monitor wind speed regularly8. Pre-Task Briefing Must be done before any work on site, and must include all team members.9. Warning Tape and H&S Signs are to be used where required (as mentioned in the below risk assessment)

49 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page49of271

Team leader will check for any leakage or spillage on site before start of any activity. If found team leader must report it to project management immediately.Two meters ladder will be used by riggers to work on cable tray Rigger will use double lanyard to climb on the tower for access to the AntennasRigger's fall arrester will be connected to tower safety wire while climbingEnsure that AC and DC Power must be locked-out and tagged-out.Only the certified and competent electrician will do the isolation of power.Ensure the grounding is connected to the bus bar. Use only insulated tools.1. Any Activity Must be suspended when it gets dark2. All working at height activities and crane operations are prohibited between sunset and sunrise (from 6:30 PM - 5:40 AM)3. Do not access site without the required mandatory PPE (Helmet, Safety Shoes and VIS Jacket) and do not remove them when inside the site.4. Other job based PPE requirements are stated in the below risk assessment based on the required activity5. Do not access the site without having valid safety passport6. Follow the heat stress guidelines7. Monitor wind speed regularly8. Pre-Task Briefing Must be done before any work on site, and must include all team members.9. Warning Tape and H&S Signs are to be used where required (as mentioned in the below risk assessment)

Site Photos

Risk Assessment

50 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page50of271

Risk Assessment

51 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page51of271

WHO IS EXPOSED?

52 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page52of271

WHO IS EXPOSED?

Passengers /General Public

53 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page53of271

WHO IS EXPOSED?

Technician & Rigger

54 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page54of271

WHO IS EXPOSED?

Employees

55 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page55of271

WHO IS EXPOSED?

workers on site

56 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page56of271

WHO IS EXPOSED?

Riggers and operatives

57 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page57of271

WHO IS EXPOSED?Riggers and operatives

58 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page58of271

WHO IS EXPOSED?

Riggers

59 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page59of271

WHO IS EXPOSED?

Site Engineer & Technicians.

60 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page60of271

WHO IS EXPOSED?

employees

61 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page61of271

WHO IS EXPOSED?

employees

62 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page62of271

WHO IS EXPOSED?

workers on site

63 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page63of271

WHO IS EXPOSED?

site Workers

64 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page64of271

WHO IS EXPOSED?

65 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page65of271

WHO IS EXPOSED?

66 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page66of271

WHO IS EXPOSED?

67 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page67of271

WHO IS EXPOSED?

68 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page68of271

WHO IS EXPOSED?

69 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page69of271

WHO IS EXPOSED?

70 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page70of271

WHO IS EXPOSED?

71 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page71of271

WHO IS EXPOSED?

72 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page72of271

WHO IS EXPOSED?

73 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page73of271

WHO IS EXPOSED?

74 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page74of271

WHO IS EXPOSED?

75 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page75of271

WHO IS EXPOSED?

76 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page76of271

WHO IS EXPOSED?

77 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page77of271

WHO IS EXPOSED?

78 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page78of271

WHO IS EXPOSED?

79 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page79of271

WHO IS EXPOSED?

80 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page80of271

WHO IS EXPOSED?

81 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page81of271

WHO IS EXPOSED?

82 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page82of271

WHO IS EXPOSED?

83 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page83of271

WHO IS EXPOSED?

84 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page84of271

WHO IS EXPOSED?

85 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page85of271

WHO IS EXPOSED?

86 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page86of271

WHO IS EXPOSED?

87 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page87of271

WHO IS EXPOSED?

88 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page88of271

WHO IS EXPOSED?

89 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page89of271

WHO IS EXPOSED?

90 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page90of271

WHO IS EXPOSED?

91 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page91of271

Contractor: JAIDAH

Sign: _________________

Sign: _________________

__24 ___/____02___/__2016_

Site ID - 1029 MP (GF) Site ID - 1029 MP (GF)

Scope of work - MW Installation Date - 24 - 02- 2016 Date - 24 - 02- 2016

92 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page92of271

I herby confirm that I have read the below requirements and risk assessment and shall strictly follow and implement, and in case of conflicts or doubts I shall consult with company H&S Manager to use the dynamic risk assessment, and I am fully responsible for my own safety and the safety of all the crew working on my site. and I confirm that all H&S documents shall be on site whenever any work is carried out.

Team leader will check for any leakage or spillage on site before start of any activity. If found team leader must report it to project management immediately.Two meters ladder will be used by riggers to work on cable tray Rigger will use double lanyard to climb on the tower for access to the AntennasRigger's fall arrester will be connected to tower safety wire while climbingEnsure that AC and DC Power must be locked-out and tagged-out.Only the certified and competent electrician will do the isolation of power.Ensure the grounding is connected to the bus bar. Use only insulated tools.1. Any Activity Must be suspended when it gets dark2. All working at height activities and crane operations are prohibited between sunset and sunrise (from 6:30 PM - 5:40 AM)3. Do not access site without the required mandatory PPE (Helmet, Safety Shoes and VIS Jacket) and do not remove them when inside the site.4. Other job based PPE requirements are stated in the below risk assessment based on the required activity5. Do not access the site without having valid safety passport6. Follow the heat stress guidelines7. Monitor wind speed regularly8. Pre-Task Briefing Must be done before any work on site, and must include all team members.9. Warning Tape and H&S Signs are to be used where required (as mentioned in the below risk assessment)

General Notes

93 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page93of271

Team leader will check for any leakage or spillage on site before start of any activity. If found team leader must report it to project management immediately.Two meters ladder will be used by riggers to work on cable tray Rigger will use double lanyard to climb on the tower for access to the AntennasRigger's fall arrester will be connected to tower safety wire while climbingEnsure that AC and DC Power must be locked-out and tagged-out.Only the certified and competent electrician will do the isolation of power.Ensure the grounding is connected to the bus bar. Use only insulated tools.1. Any Activity Must be suspended when it gets dark2. All working at height activities and crane operations are prohibited between sunset and sunrise (from 6:30 PM - 5:40 AM)3. Do not access site without the required mandatory PPE (Helmet, Safety Shoes and VIS Jacket) and do not remove them when inside the site.4. Other job based PPE requirements are stated in the below risk assessment based on the required activity5. Do not access the site without having valid safety passport6. Follow the heat stress guidelines7. Monitor wind speed regularly8. Pre-Task Briefing Must be done before any work on site, and must include all team members.9. Warning Tape and H&S Signs are to be used where required (as mentioned in the below risk assessment)

94 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page94of271

Team leader will check for any leakage or spillage on site before start of any activity. If found team leader must report it to project management immediately.Two meters ladder will be used by riggers to work on cable tray Rigger will use double lanyard to climb on the tower for access to the AntennasRigger's fall arrester will be connected to tower safety wire while climbingEnsure that AC and DC Power must be locked-out and tagged-out.Only the certified and competent electrician will do the isolation of power.Ensure the grounding is connected to the bus bar. Use only insulated tools.1. Any Activity Must be suspended when it gets dark2. All working at height activities and crane operations are prohibited between sunset and sunrise (from 6:30 PM - 5:40 AM)3. Do not access site without the required mandatory PPE (Helmet, Safety Shoes and VIS Jacket) and do not remove them when inside the site.4. Other job based PPE requirements are stated in the below risk assessment based on the required activity5. Do not access the site without having valid safety passport6. Follow the heat stress guidelines7. Monitor wind speed regularly8. Pre-Task Briefing Must be done before any work on site, and must include all team members.9. Warning Tape and H&S Signs are to be used where required (as mentioned in the below risk assessment)

Site Photos

Risk Assessment

95 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page95of271

Risk Assessment

96 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page96of271

EXISTING CONTROLS

RISK ASSESS

L

97 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page97of271

EXISTING CONTROLS

RISK ASSESS

L

2

• Driver must have valid driving license• Vehicle must be fit for the job• Vehicle must be in good working conditions• Inspect the vehicle using roadworthy inspection checklist• Fix the identified problems before moving to site• All passengers must fasten the seat belts (front and rear)• Any load in the vehicle should be properly secured and distributed• No material in the front or rear seats of the vehicle• Do not use mobile phone while driving• Never over speed • Never drive under the influence of the drugs• Must follow VF 07 absolute safety rules• Drivers must be very watchfull of other road users during driving for any unexpected situation • Drivers must always keep the volume of the car tape as low as possible if at all to be on. • Drivers must always avoid any deep discussion with passengers to avoid lost of concentration.All drivers must have Defensive Driving Training

98 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page98of271

EXISTING CONTROLS

RISK ASSESS

L

2

- Conduct Tool box talk before start of work'- Employees should be trained about manual handling, and safety lifting techniques- Appropriate PPE must be use such as safety boots and hard hats and gloves.- Avoid awkward postures- Ensure good house keeping at site

99 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page99of271

EXISTING CONTROLS

RISK ASSESS

L

2

o Full body harness, Double Lanyard, Positioning Lanyard, Safety shoes, Tower Climbing Helmets, Tower Climbing gloves, safety goggles• Only trained and certified tower climbing & rescue workers will work on tower • Work on hold in case of strong wind (24kT) or adverse weather (call the safety inspector for review) • Accessories must be kept in protected bags in order not to fall on the ground• Inspect PPE, Rescue Equipment Inspection prior use• Proper PPE to be used:• Tower climbers must inspect the tower before climbing, In case of finding any abnormality do not climb and report to safety department- Always use connectors/carabiners/hooks in verticale position - Never put double lanyard hooks on the same anchor point - All damaged PPEs must be marked as damaged and removed from site immediately - Never work after sunset or before sunrise- There must be a regular visual or audio contact between Rescuer and Tower Climber- Supervisor must ensure that tower climber and rescuer are physicall and mentally fit on the day> Riggers (tower climber) must use double lanyard to connect themselves with the tower all the time> Ringgers should never remove both hooks of the double lananyard from tower at the same time

100 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page100of271

EXISTING CONTROLS

RISK ASSESS

L

2

• Must ensure that o Certified rigger (having rigging & slinging training) available at siteo All ropes and pulleys have EN & CE markingo Material Fall Arrest System is properly installedo Drop zone is identifiedo Certificates Rigger , Tower Climbers and First Aider are available at siteo Tag lines are used• Ensure the pulley is in good condition• Ensure the pulley is properly attached with the tower• Recheck the condition of the pulley attachment in intervals during the work• No one should be standing under the tower when material is being pulled up• There should be enough no. of workers to handle the rope with the material• Hold the work in case of adverse weather

101 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page101of271

EXISTING CONTROLS

RISK ASSESS

L

2

~ Make sure the area is barricaded and nobody is working beneath-Appropriate PPE must be warn such as hard hat, gloves, safety boots and safety harness. ~ No alone working.~ No night time working.- Follow the lifting procedure- Use pulley and rope having EN standard- Use material fall arrestor to save material from falling- Must inspect ropes, pulley, slings, material fall arretor and ensure that it is fit for use- check the weight before lifting that it is suitable- ensure that weight is securely attached with the rope and material fall arrestor- No work at site when material is detatched from structure and comming down- no work during high wind speed, rain or adverse weather- Follow the above working at height risk assessment- ensure that weight is securely attached with the rope and material fall arrestor- No work at site untill lifted equipment is fixed with the tower- use taglines to control movement of the equipment- • careful while working on sharp edges like on cable trays, and must use gloves• Accessories must be placed in a protective bag in order not to be scattered - Only trained workers should participate in the delivery, movement and positioning of all the equipments.No Horseplay during work.

102 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page102of271

EXISTING CONTROLS

RISK ASSESS

L

2

~ Make sure the area is barricaded and nobody is working beneath-Appropriate PPE must be warn such as hard hat, gloves, safety boots and safety harness. ~ No alone working.~ No night time working.- Follow the lifting procedure- Use pulley and rope having EN standard- Use material fall arrestor to save material from falling- Must inspect ropes, pulley, slings, material fall arretor and ensure that it is fit for use- check the weight before lifting that it is suitable- ensure that weight is securely attached with the rope and material fall arrestor- No work at site when material is detatched from structure and comming down- no work during high wind speed, rain or adverse weather- Follow the above working at height risk assessment- ensure that weight is securely attached with the rope and material fall arrestor- No work at site untill lifted equipment is fixed with the tower- use taglines to control movement of the equipment- • careful while working on sharp edges like on cable trays, and must use gloves• Accessories must be placed in a protective bag in order not to be scattered - Only trained workers should participate in the delivery, movement and positioning of all the equipments.No Horseplay during work.

103 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page103of271

EXISTING CONTROLS

RISK ASSESS

L

2

Ensure all riggers are worn appropriate PPE.Ensure Ringing and slinging rope shall be used to pull the cables.Ensure area is barricaded.Ensure cable pulling route is identified and understood by riggers.Ensure double lanyard is connected to proper stable anchor point all the time during task.

104 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page104of271

EXISTING CONTROLS

RISK ASSESS

L

1

Ensure right person for the task is assigned by site engineer.Ensure hand gloves are worn all the time during work.Ensure site engineer is present all the time.Ensure all cables are connected as per SDD.

105 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page105of271

EXISTING CONTROLS

RISK ASSESS

L

2

Ensure All workers are trained and competent to use of hand tools and power tools.Ensure Right tools for the right task rule is in place.Ensure All power tools must be inspected visually before use by competent person.e.g power cable, cabinet, etc.Ensure no passing of tools by throwing.Ensure no homemade tools are used at site.Ensure No Horsplay.

106 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page106of271

EXISTING CONTROLS

RISK ASSESS

L

1

Exclusion zone to be followedAll riggers should be trained about RF hazards and use of RF monitorUse RF Monitors Supervisor is required to set the value of RF monitor to 39 V/m before each useRF signage should be in place, In case of find beep from the RF monitor, the rigger is required to change his location to go out of the high radiation zone. If it is requried to work within high radiation area then rigger is required to come out of the high radiation zone, inform the site supervisor about the situation. The site supervisor shall arrange to shut dowing the site or sector with coordination of company Project Control and the Client.

107 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page107of271

EXISTING CONTROLS

RISK ASSESS

L

2

PPE Inspection prior use.Proper PPE to be used:Gloves, safety shoes, Helmetscareful while working on sharp edges, and must use gloves.the right equipment should be use with the appropriate running of the cables•

108 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page108of271

EXISTING CONTROLS

RISK ASSESS

L

2

• Participants instructed to cover any cuts, however minor, with surgical tape or waterproof plasters.• Waste must be stored at designated area, . • appropriate and minimum PPE should be used by participants: Safety boot, appropriate hand gloves, helmet. and dust masksWorkers participating in the waste collecting should be cautious for:o Sharp objects (glass, nails, metal pieces, etc.)o obstacles to avoid tripping hazard.

109 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page109of271

EXISTING CONTROLS

RISK ASSESS

L

110 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page110of271

EXISTING CONTROLS

RISK ASSESS

L

111 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page111of271

EXISTING CONTROLS

RISK ASSESS

L

112 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page112of271

EXISTING CONTROLS

RISK ASSESS

L

113 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page113of271

EXISTING CONTROLS

RISK ASSESS

L

114 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page114of271

EXISTING CONTROLS

RISK ASSESS

L

115 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page115of271

EXISTING CONTROLS

RISK ASSESS

L

116 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page116of271

EXISTING CONTROLS

RISK ASSESS

L

117 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page117of271

EXISTING CONTROLS

RISK ASSESS

L

118 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page118of271

EXISTING CONTROLS

RISK ASSESS

L

119 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page119of271

EXISTING CONTROLS

RISK ASSESS

L

120 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page120of271

EXISTING CONTROLS

RISK ASSESS

L

121 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page121of271

EXISTING CONTROLS

RISK ASSESS

L

122 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page122of271

EXISTING CONTROLS

RISK ASSESS

L

123 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page123of271

EXISTING CONTROLS

RISK ASSESS

L

124 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page124of271

EXISTING CONTROLS

RISK ASSESS

L

125 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page125of271

EXISTING CONTROLS

RISK ASSESS

L

126 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page126of271

EXISTING CONTROLS

RISK ASSESS

L

127 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page127of271

EXISTING CONTROLS

RISK ASSESS

L

128 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page128of271

EXISTING CONTROLS

RISK ASSESS

L

129 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page129of271

EXISTING CONTROLS

RISK ASSESS

L

130 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page130of271

EXISTING CONTROLS

RISK ASSESS

L

131 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page131of271

EXISTING CONTROLS

RISK ASSESS

L

132 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page132of271

EXISTING CONTROLS

RISK ASSESS

L

133 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page133of271

EXISTING CONTROLS

RISK ASSESS

L

134 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page134of271

EXISTING CONTROLS

RISK ASSESS

L

135 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page135of271

EXISTING CONTROLS

RISK ASSESS

L

136 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page136of271

Contractor: JAIDAH

Sign: _________________

Sign: _________________

Scope of work - MW Installation

137 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page137of271

I herby confirm that I have read the below requirements and risk assessment and shall strictly follow and implement, and in case of conflicts or doubts I shall consult with company H&S Manager to use the dynamic risk assessment, and I am fully responsible for my own safety and the safety of all the crew working on my site. and I confirm that all H&S documents shall be on site whenever any work is carried out.

Team leader will check for any leakage or spillage on site before start of any activity. If found team leader must report it to project management immediately.Two meters ladder will be used by riggers to work on cable tray Rigger will use double lanyard to climb on the tower for access to the AntennasRigger's fall arrester will be connected to tower safety wire while climbingEnsure that AC and DC Power must be locked-out and tagged-out.Only the certified and competent electrician will do the isolation of power.Ensure the grounding is connected to the bus bar. Use only insulated tools.1. Any Activity Must be suspended when it gets dark2. All working at height activities and crane operations are prohibited between sunset and sunrise (from 6:30 PM - 5:40 AM)3. Do not access site without the required mandatory PPE (Helmet, Safety Shoes and VIS Jacket) and do not remove them when inside the site.4. Other job based PPE requirements are stated in the below risk assessment based on the required activity5. Do not access the site without having valid safety passport6. Follow the heat stress guidelines7. Monitor wind speed regularly8. Pre-Task Briefing Must be done before any work on site, and must include all team members.9. Warning Tape and H&S Signs are to be used where required (as mentioned in the below risk assessment)

138 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page138of271

Team leader will check for any leakage or spillage on site before start of any activity. If found team leader must report it to project management immediately.Two meters ladder will be used by riggers to work on cable tray Rigger will use double lanyard to climb on the tower for access to the AntennasRigger's fall arrester will be connected to tower safety wire while climbingEnsure that AC and DC Power must be locked-out and tagged-out.Only the certified and competent electrician will do the isolation of power.Ensure the grounding is connected to the bus bar. Use only insulated tools.1. Any Activity Must be suspended when it gets dark2. All working at height activities and crane operations are prohibited between sunset and sunrise (from 6:30 PM - 5:40 AM)3. Do not access site without the required mandatory PPE (Helmet, Safety Shoes and VIS Jacket) and do not remove them when inside the site.4. Other job based PPE requirements are stated in the below risk assessment based on the required activity5. Do not access the site without having valid safety passport6. Follow the heat stress guidelines7. Monitor wind speed regularly8. Pre-Task Briefing Must be done before any work on site, and must include all team members.9. Warning Tape and H&S Signs are to be used where required (as mentioned in the below risk assessment)

139 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page139of271

Team leader will check for any leakage or spillage on site before start of any activity. If found team leader must report it to project management immediately.Two meters ladder will be used by riggers to work on cable tray Rigger will use double lanyard to climb on the tower for access to the AntennasRigger's fall arrester will be connected to tower safety wire while climbingEnsure that AC and DC Power must be locked-out and tagged-out.Only the certified and competent electrician will do the isolation of power.Ensure the grounding is connected to the bus bar. Use only insulated tools.1. Any Activity Must be suspended when it gets dark2. All working at height activities and crane operations are prohibited between sunset and sunrise (from 6:30 PM - 5:40 AM)3. Do not access site without the required mandatory PPE (Helmet, Safety Shoes and VIS Jacket) and do not remove them when inside the site.4. Other job based PPE requirements are stated in the below risk assessment based on the required activity5. Do not access the site without having valid safety passport6. Follow the heat stress guidelines7. Monitor wind speed regularly8. Pre-Task Briefing Must be done before any work on site, and must include all team members.9. Warning Tape and H&S Signs are to be used where required (as mentioned in the below risk assessment)

140 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page140of271

141 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page141of271

RISK ASSESS

S RV Risk Level Action required

142 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page142of271

RISK ASSESS

S RV Risk Level Action required

4

8 Medium

Additional control measures required

143 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page143of271

RISK ASSESS

S RV Risk Level Action required

3

6 Medium

Additional control measures required

144 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page144of271

RISK ASSESS

S RV Risk Level Action required

4

8 Medium

Addition control measures to be taken.

145 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page145of271

RISK ASSESS

S RV Risk Level Action required

4

8 Medium

Addition control measures to be taken.

146 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page146of271

RISK ASSESS

S RV Risk Level Action required

4

8

MediumAddition control measures to

be taken.

147 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page147of271

RISK ASSESS

S RV Risk Level Action required

4

8

MediumAddition control measures to

be taken.

148 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page148of271

RISK ASSESS

S RV Risk Level Action required

4

8 Medium

Addition control measures to be taken.

149 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page149of271

RISK ASSESS

S RV Risk Level Action required

3

3 Low

Continuous monitoring is requried

150 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page150of271

RISK ASSESS

S RV Risk Level Action required

3

6 Medium

Additional control measures required

151 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page151of271

RISK ASSESS

S RV Risk Level Action required

3

3 Low

Additional control measures required

152 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page152of271

RISK ASSESS

S RV Risk Level Action required

3

6 Medium

Additional Control measures required

153 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page153of271

RISK ASSESS

S RV Risk Level Action required

3

6 Medium

Review at next opportunity

154 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page154of271

RISK ASSESS

S RV Risk Level Action required

155 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page155of271

RISK ASSESS

S RV Risk Level Action required

156 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page156of271

RISK ASSESS

S RV Risk Level Action required

157 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page157of271

RISK ASSESS

S RV Risk Level Action required

158 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page158of271

RISK ASSESS

S RV Risk Level Action required

159 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page159of271

RISK ASSESS

S RV Risk Level Action required

160 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page160of271

RISK ASSESS

S RV Risk Level Action required

161 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page161of271

RISK ASSESS

S RV Risk Level Action required

162 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page162of271

RISK ASSESS

S RV Risk Level Action required

163 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page163of271

RISK ASSESS

S RV Risk Level Action required

164 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page164of271

RISK ASSESS

S RV Risk Level Action required

165 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page165of271

RISK ASSESS

S RV Risk Level Action required

166 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page166of271

RISK ASSESS

S RV Risk Level Action required

167 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page167of271

RISK ASSESS

S RV Risk Level Action required

168 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page168of271

RISK ASSESS

S RV Risk Level Action required

169 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page169of271

RISK ASSESS

S RV Risk Level Action required

170 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page170of271

RISK ASSESS

S RV Risk Level Action required

171 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page171of271

RISK ASSESS

S RV Risk Level Action required

172 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page172of271

RISK ASSESS

S RV Risk Level Action required

173 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page173of271

RISK ASSESS

S RV Risk Level Action required

174 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page174of271

RISK ASSESS

S RV Risk Level Action required

175 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page175of271

RISK ASSESS

S RV Risk Level Action required

176 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page176of271

RISK ASSESS

S RV Risk Level Action required

177 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page177of271

RISK ASSESS

S RV Risk Level Action required

178 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page178of271

RISK ASSESS

S RV Risk Level Action required

179 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page179of271

RISK ASSESS

S RV Risk Level Action required

180 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page180of271

RISK ASSESS

S RV Risk Level Action required

181 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page181of271

Scope of work - MW Installation

182 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page182of271

I herby confirm that I have read the below requirements and risk assessment and shall strictly follow and implement, and in case of conflicts or doubts I shall consult with company H&S Manager to use the dynamic risk assessment, and I am fully responsible for my own safety and the safety of all the crew working on my site. and I confirm that all H&S documents shall be on site whenever any work is carried out.

Team leader will check for any leakage or spillage on site before start of any activity. If found team leader must report it to project management immediately.Two meters ladder will be used by riggers to work on cable tray Rigger will use double lanyard to climb on the tower for access to the AntennasRigger's fall arrester will be connected to tower safety wire while climbingEnsure that AC and DC Power must be locked-out and tagged-out.Only the certified and competent electrician will do the isolation of power.Ensure the grounding is connected to the bus bar. Use only insulated tools.1. Any Activity Must be suspended when it gets dark2. All working at height activities and crane operations are prohibited between sunset and sunrise (from 6:30 PM - 5:40 AM)3. Do not access site without the required mandatory PPE (Helmet, Safety Shoes and VIS Jacket) and do not remove them when inside the site.4. Other job based PPE requirements are stated in the below risk assessment based on the required activity5. Do not access the site without having valid safety passport6. Follow the heat stress guidelines7. Monitor wind speed regularly8. Pre-Task Briefing Must be done before any work on site, and must include all team members.9. Warning Tape and H&S Signs are to be used where required (as mentioned in the below risk assessment)

183 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page183of271

Team leader will check for any leakage or spillage on site before start of any activity. If found team leader must report it to project management immediately.Two meters ladder will be used by riggers to work on cable tray Rigger will use double lanyard to climb on the tower for access to the AntennasRigger's fall arrester will be connected to tower safety wire while climbingEnsure that AC and DC Power must be locked-out and tagged-out.Only the certified and competent electrician will do the isolation of power.Ensure the grounding is connected to the bus bar. Use only insulated tools.1. Any Activity Must be suspended when it gets dark2. All working at height activities and crane operations are prohibited between sunset and sunrise (from 6:30 PM - 5:40 AM)3. Do not access site without the required mandatory PPE (Helmet, Safety Shoes and VIS Jacket) and do not remove them when inside the site.4. Other job based PPE requirements are stated in the below risk assessment based on the required activity5. Do not access the site without having valid safety passport6. Follow the heat stress guidelines7. Monitor wind speed regularly8. Pre-Task Briefing Must be done before any work on site, and must include all team members.9. Warning Tape and H&S Signs are to be used where required (as mentioned in the below risk assessment)

184 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page184of271

Team leader will check for any leakage or spillage on site before start of any activity. If found team leader must report it to project management immediately.Two meters ladder will be used by riggers to work on cable tray Rigger will use double lanyard to climb on the tower for access to the AntennasRigger's fall arrester will be connected to tower safety wire while climbingEnsure that AC and DC Power must be locked-out and tagged-out.Only the certified and competent electrician will do the isolation of power.Ensure the grounding is connected to the bus bar. Use only insulated tools.1. Any Activity Must be suspended when it gets dark2. All working at height activities and crane operations are prohibited between sunset and sunrise (from 6:30 PM - 5:40 AM)3. Do not access site without the required mandatory PPE (Helmet, Safety Shoes and VIS Jacket) and do not remove them when inside the site.4. Other job based PPE requirements are stated in the below risk assessment based on the required activity5. Do not access the site without having valid safety passport6. Follow the heat stress guidelines7. Monitor wind speed regularly8. Pre-Task Briefing Must be done before any work on site, and must include all team members.9. Warning Tape and H&S Signs are to be used where required (as mentioned in the below risk assessment)

Abnormal Situation of Site (Photos)Abnormal Situation of Site (Photos)

185 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page185of271

Abnormal Situation of Site (Photos)Abnormal Situation of Site (Photos)

186 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page186of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

187 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page187of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

1 4

4

Site Vehicle will be parked near the site.The site vehilce must not carry more than 5 people inlucing driver.The car must be parked 5 meter far from the fence.Site Engineer will carry the key of site entrance gate.

188 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page188of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

1 3

3

Max. 5 kg can be lifted by one person at one time.Ensure Rolling of cables must be performed by two person or more.Ensure nip and pinch points are identified.

189 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page189of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

1 4

4

Two meter ladder will be used to work on the cable tray.Double lanyard will be used by riggers while climbing.Rigger's fall arrester will be connected to tower safety wire while climbing.Positioning lanyard will be used by each rigger.slings will be used.3 slings will be used to secure one anntena during installtion.1 rescue kit will be available near tower with assigned rescuer.

190 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page190of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

1 4

4

The standard pulley will be installed at proper anchor point by rigger.The rope length must be twice according to tower height.1 meter sling will be used to hold the material.Rigger will use double lanyard, positioning lanyard and fall arrester.Conitinious monitoring by site enginner is required.Ensure the load will be attached with material fall arrestor.Tag lines will be used.Slings will be used.

191 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page191of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

1 4

4

Riggers must be medically fit to climb the tower, Ensure

Wind speed meter is obtained by rigger at all the time.

Riggers must be careful while fixing of anntena to prevent from

hitting to tower. Anntenna and RRUs will be

secured with material fall arrestor.Riggers are trained by third party.Ensure continious monitoring by

site engineer.

192 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page192of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

1 4

4

Riggers must be medically fit to climb the tower, Ensure

Wind speed meter is obtained by rigger at all the time.

Riggers must be careful while fixing of anntena to prevent from

hitting to tower. Anntenna and RRUs will be

secured with material fall arrestor.Riggers are trained by third party.Ensure continious monitoring by

site engineer.

193 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page193of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

1 4

4

194 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page194of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

1 3

3

195 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page195of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

1 3

3

Tools must be carried in tools bag while working at height.Right tools for the right task shall be applied.

196 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page196of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

The team must have RF monitor.

1 3

3

197 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page197of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

1 3

3

2 Meter ladder will be used.One person will hold ladder while another person working on ladder.Ladder will be visually inspected before use by rigger.Ensure right cables are dismantled as per instruction by huawei.

198 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page198of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

1 3

3

All waste material will be stored at one place and area will be barricaded by caution tape.After completion of work, all waste materials must be removed from site.

199 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page199of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

200 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page200of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

201 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page201of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

202 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page202of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

203 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page203of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

204 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page204of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

205 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page205of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

206 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page206of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

207 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page207of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

208 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page208of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

209 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page209of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

210 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page210of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

211 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page211of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

212 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page212of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

213 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page213of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

214 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page214of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

215 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page215of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

216 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page216of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

217 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page217of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

218 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page218of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

219 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page219of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

220 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page220of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

221 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page221of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

222 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page222of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

223 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page223of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

224 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page224of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

225 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page225of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

226 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page226of271

Scope of work - MW Installation

227 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page227of271

I herby confirm that I have read the below requirements and risk assessment and shall strictly follow and implement, and in case of conflicts or doubts I shall consult with company H&S Manager to use the dynamic risk assessment, and I am fully

Team leader will check for any leakage or spillage on site before start of any activity. If found team leader must report it to project management immediately.Two meters ladder will be used by riggers to work on cable tray Rigger will use double lanyard to climb on the tower for access to the AntennasRigger's fall arrester will be connected to tower safety wire while climbingEnsure that AC and DC Power must be locked-out and tagged-out.Only the certified and competent electrician will do the isolation of power.Ensure the grounding is connected to the bus bar. Use only insulated tools.1. Any Activity Must be suspended when it gets dark2. All working at height activities and crane operations are prohibited between sunset and sunrise (from 6:30 PM - 5:40 AM)3. Do not access site without the required mandatory PPE (Helmet, Safety Shoes and VIS Jacket) and do not remove them when inside the site.4. Other job based PPE requirements are stated in the below risk assessment based on the required activity5. Do not access the site without having valid safety passport6. Follow the heat stress guidelines7. Monitor wind speed regularly8. Pre-Task Briefing Must be done before any work on site, and must include all team members.9. Warning Tape and H&S Signs are to be used where required (as mentioned in the below risk assessment)

228 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page228of271

Team leader will check for any leakage or spillage on site before start of any activity. If found team leader must report it to project management immediately.Two meters ladder will be used by riggers to work on cable tray Rigger will use double lanyard to climb on the tower for access to the AntennasRigger's fall arrester will be connected to tower safety wire while climbingEnsure that AC and DC Power must be locked-out and tagged-out.Only the certified and competent electrician will do the isolation of power.Ensure the grounding is connected to the bus bar. Use only insulated tools.1. Any Activity Must be suspended when it gets dark2. All working at height activities and crane operations are prohibited between sunset and sunrise (from 6:30 PM - 5:40 AM)3. Do not access site without the required mandatory PPE (Helmet, Safety Shoes and VIS Jacket) and do not remove them when inside the site.4. Other job based PPE requirements are stated in the below risk assessment based on the required activity5. Do not access the site without having valid safety passport6. Follow the heat stress guidelines7. Monitor wind speed regularly8. Pre-Task Briefing Must be done before any work on site, and must include all team members.9. Warning Tape and H&S Signs are to be used where required (as mentioned in the below risk assessment)

229 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page229of271

Team leader will check for any leakage or spillage on site before start of any activity. If found team leader must report it to project management immediately.Two meters ladder will be used by riggers to work on cable tray Rigger will use double lanyard to climb on the tower for access to the AntennasRigger's fall arrester will be connected to tower safety wire while climbingEnsure that AC and DC Power must be locked-out and tagged-out.Only the certified and competent electrician will do the isolation of power.Ensure the grounding is connected to the bus bar. Use only insulated tools.1. Any Activity Must be suspended when it gets dark2. All working at height activities and crane operations are prohibited between sunset and sunrise (from 6:30 PM - 5:40 AM)3. Do not access site without the required mandatory PPE (Helmet, Safety Shoes and VIS Jacket) and do not remove them when inside the site.4. Other job based PPE requirements are stated in the below risk assessment based on the required activity5. Do not access the site without having valid safety passport6. Follow the heat stress guidelines7. Monitor wind speed regularly8. Pre-Task Briefing Must be done before any work on site, and must include all team members.9. Warning Tape and H&S Signs are to be used where required (as mentioned in the below risk assessment)

Additional Controls / Clear from photosAdditional Controls / Clear from photos

Abnormal Situation of Site (Photos)Abnormal Situation of Site (Photos)

230 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page230of271

Additional Controls / Clear from photosAdditional Controls / Clear from photos

Abnormal Situation of Site (Photos)Abnormal Situation of Site (Photos)

231 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page231of271

RISK ASSESS

Risk Level Action required

232 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page232of271

RISK ASSESS

Risk Level Action required

low Review at next opportunity

233 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page233of271

RISK ASSESS

Risk Level Action required

Low

Review at next opportunity

234 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page234of271

RISK ASSESS

Risk Level Action required

Low

Monitoring required

235 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page235of271

RISK ASSESS

Risk Level Action required

Low

Review at next opportunity

236 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page236of271

RISK ASSESS

Risk Level Action required

Low

Continuous monitoring is requried

237 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page237of271

RISK ASSESS

Risk Level Action required

Low

Continuous monitoring is requried

238 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page238of271

RISK ASSESS

Risk Level Action required

Low

Review at next opportunity

239 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page239of271

RISK ASSESS

Risk Level Action required

Low

Continuous monitoring is requried

240 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page240of271

RISK ASSESS

Risk Level Action required

Low

Continuous monitoring is requried

241 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page241of271

RISK ASSESS

Risk Level Action required

Low

Review at next opportunity

242 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page242of271

RISK ASSESS

Risk Level Action required

Low

Review at next opportunity

243 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page243of271

RISK ASSESS

Risk Level Action required

Low

Review at next opportunity

244 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page244of271

RISK ASSESS

Risk Level Action required

245 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page245of271

RISK ASSESS

Risk Level Action required

246 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page246of271

RISK ASSESS

Risk Level Action required

247 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page247of271

RISK ASSESS

Risk Level Action required

248 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page248of271

RISK ASSESS

Risk Level Action required

249 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page249of271

RISK ASSESS

Risk Level Action required

250 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page250of271

RISK ASSESS

Risk Level Action required

251 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page251of271

RISK ASSESS

Risk Level Action required

252 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page252of271

RISK ASSESS

Risk Level Action required

253 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page253of271

RISK ASSESS

Risk Level Action required

254 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page254of271

RISK ASSESS

Risk Level Action required

255 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page255of271

RISK ASSESS

Risk Level Action required

256 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page256of271

RISK ASSESS

Risk Level Action required

257 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page257of271

RISK ASSESS

Risk Level Action required

258 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page258of271

RISK ASSESS

Risk Level Action required

259 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page259of271

RISK ASSESS

Risk Level Action required

260 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page260of271

RISK ASSESS

Risk Level Action required

261 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page261of271

RISK ASSESS

Risk Level Action required

262 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page262of271

RISK ASSESS

Risk Level Action required

263 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page263of271

RISK ASSESS

Risk Level Action required

264 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page264of271

RISK ASSESS

Risk Level Action required

265 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page265of271

RISK ASSESS

Risk Level Action required

266 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page266of271

RISK ASSESS

Risk Level Action required

267 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page267of271

RISK ASSESS

Risk Level Action required

268 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page268of271

RISK ASSESS

Risk Level Action required

269 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page269of271

RISK ASSESS

Risk Level Action required

270 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page270of271

RISK ASSESS

Risk Level Action required

Site Emergency Response

HUAWEI - Qatar - Internal Proprietary – Use pursuant to Company instruction Page 1 of 1

# Emergency Response Steps

1 Site Manager (Always In charge)

2 Fire Emergency

3 First Aid Emergency

4 Major Injury / Severe Emergencies 999

5 Falling From Height

6 Site Evacuation

7 Others

Comments:

S. Supervisor: NameS.P Number: Number

Rescuer: NameS.P Number: Number

Rescuer: NameS.P Number: Number

Rescuer: NameS.P Number: Number

Describe evacuation from site: (R.T and IBS)

E.R. PlanE.R. Plan Site ID - Site ID - Scope of work - Date - Date -

Recommended