The Seven Forms of Waste Continuous Improvement focuses on
the identification and elimination of the 7 forms of waste:
Overproduction Inventory Unnecessary Motion Transportation Waiting Over Processing Defects / Repair / Rework
2
1. Over ProductionProducing products or materials before they are needed.
Overproduction is the worst form of waste because it is the root cause of many other wastes.
Results of Over Production: • Products being produced in excess quantities• Products being made before customers need them• Excess Inventory• Excess Transportation• Hides available capacity
Caused by:• Working ahead of customer (internal/external) or process requirements
3
Waste Of Overproduction : Example
OPERATOR SHOULD BE IN THIS STATION (ST 16) BUT IS WORKING AHEAD IN ST 15
4
2. Inventory
Excess inventory is not directly required for current customer orders.
Results of Excess Inventory:• requires space• costs money and ties up capital• search and transport damage• hides defects• excess WIP and finished out-of-date product• Increased deterioration
Caused by: • Working ahead of build requirements• High WIP standards• No WIP standards• Lack of JIT/Pull system
6
3. Motion
Unnecessary movement in a process.
Some Results of Motion:• unnecessary walking• poor ergonomic conditions• part transfer• reaching and stopping and walking to locate/ pick up parts/tools
Caused by:• poor parts placement• poor process flow• poor work station layout
7
Waste of Motion: Example
TEAM MEMBER IN PAINT SHOP ATTEMPTING TO UNTANGLE HOSES TO THE BACK-UP GUNS IN THE TOP COAT BOOTH.
8
4. Transportation
The unnecessary movement of materials
Results of Transportation:• Loss of traceability • Damaged goods• Increased Lead Time• Excess Costs• Storage space
Caused by: • Poor parts storage• Poor Work area layouts• Working ahead of build requirements• Lack of JIT/ Pull system
9
Waste of Transportation: Example
BODY SHOP T/M CARRIES PARTS TO RACK LINESIDE.
BODY SHOP CONVEYANCE DELIVERS AMS BRACKETS TO TABLE ON THE FLOOR
10
5. Waiting
Periods of inactivity in a downstream process that occur because an upstream activity does not deliver on time.
Results of Waiting:• Over Production• Over Processing• Idle resources• Non-Value added work
Caused by:• Line stops• Waiting for Material• Repair/Maintenance• Waiting for equipment to process• Missing tools• Non- “Full” work process
11
Waste of Waiting: Example
TEAM MEMBER WAITING ON BODYIN ST. 3900. ROBOTS IN ST. 2400 WENT DOWN CAUSING DOWNTIME
12
6. Over Processing
Producing more or better than the customer requires.
Results of Over Processing:• Increased Processing Time• Costs• Incorrect process/equipment
Caused by:• Refining the product in ways or areas not important to the customer• Wait Time• Unclear Quality Standards
14
7. Defects/Repair/Rework
Products or aspects of the production processes that do not conform to specifications or to the customer’s expectations.
Results of Defects/Repair/Rework:• Customer Dissatisfaction• Non-Value added work• Extra costs• Extra space• Extra inspections/checks
Caused by:• Scrapped parts• Wrong or defective tools or machines• Wrong or missing processes• Poor Problem Solving• Unclear Standards