1 THE 22@ PROJECT: Strategy THE 22@ PROJECT: Strategy Conclude the urban renewal of Poblenou...

Preview:

Citation preview

1

THE 22@ PROJECT: StrategyTHE 22@ PROJECT: Strategy

Conclude the urban renewal of Poblenou Conclude the urban renewal of Poblenou Responding to the needs: the knowledge economyResponding to the needs: the knowledge economy

2

Metropolitan Area of Barcelona

3

4THE PROCESS OF URBAN TRANSFORMATION IN POBLENOUTHE PROCESS OF URBAN TRANSFORMATION IN POBLENOU

5

6

7

8

9THE PROCESS OF URBAN TRANSFORMATION IN POBLENOUTHE PROCESS OF URBAN TRANSFORMATION IN POBLENOU

10

THE SCALA OF TRANSFORMATION

AREA:AREA: 198.26 ha., 115 blocks, 1,159,626 m² 22@ land 198.26 ha., 115 blocks, 1,159,626 m² 22@ land

POTENTIAL MAXIMUM ROOF SPACE:POTENTIAL MAXIMUM ROOF SPACE: 4.000.000 m² approx. 4.000.000 m² approx.• Production: 3.200.000 m² approx.Production: 3.200.000 m² approx.• Other uses (facilities, housing,..): 800.000 m² approx.Other uses (facilities, housing,..): 800.000 m² approx.

HOUSING:HOUSING: • Accepted: 4.614 existing dwellings Accepted: 4.614 existing dwellings • New social housing: 4.000 approx. (minimum of at least 25% rented)New social housing: 4.000 approx. (minimum of at least 25% rented)

INCREASE IN GREEN SPACE:INCREASE IN GREEN SPACE: 75.000 m² approx. 75.000 m² approx.

NEW FACILITIES:NEW FACILITIES: 145.000 m² 145.000 m²

NEW JOBS:NEW JOBS: 100.000 / 130.000 approx. 100.000 / 130.000 approx.

INVESTMENT IN INFRASTRUCTURE PLAN:INVESTMENT IN INFRASTRUCTURE PLAN: 162.3 million Euro 162.3 million Euro

11

BASIC AIMS OF THE PROJECT

@ Activities @ Activities

Non-polluting, city friendly activities (ie. low noise levels, etc.)

Intensive use of space

Intensive use of qualified personnel

Intensive use of Information and Telecoms Technology

12

Coexistence of different usesCoexistence of different uses

– IndustryIndustry

– Technology Technology – HousingHousing– OfficesOffices– ShopsShops– HotelsHotels– Corporate apartmentsCorporate apartments

– FacilitiesFacilities

PGM’ 76PGM’ 76

BASIC AIMS OF THE PROJECT

13

32,7

2,22

0

GENERALGENERAL

PGM’ 76PGM’ 76

GENERALGENERAL

22@ Plan22@ Plan

@ ACTIVITIES@ ACTIVITIES

PUBLIC HOUSINGPUBLIC HOUSING

of

roo

f p

er

of

lan

dm

² o

f ro

of

pe

r m

² o

f la

nd

BASIC AIMS OF THE PROJECT

Redensification Redensification

14

MANAGING THE TRANSFORMATION

A Municipal Corporation

– Urban planning

– Urban management

– Infrastructure

– Heritage management

– In co-ordination with the urban planning authorities

– Promotion

15

PEI 22@: BASIC CONTENTS

• Infrastructures implantations criteria

• Analysis of the different systems:

– Energy

– Telecomunications

– Hidraulic Cycle

– Wastes and Cleaning

– Accesibility and Public areas

• Stage planning

• Economical Funds from Land Use Tax (+roof, +value)

16

www.bcn.es/22@bcn

22@mail.bcn.es

ANALYSIS OF THE DIFFERENT SYSTEMS: ACCESSIBILITY AND PUBLIC SPACES

17

ANALYSIS OF THE DIFFERENT SYSTEMS: ACCESSIBILITY AND PUBLIC SPACES

• Application of the city modal split

• Public Transport Infraestructures Previsions

• Connections with the road network of the city

• Road structure hierarchy

• Intelligent systems for the traffic management

• Car park standards in the sector

18

MOBILITYPedestrian roads

proposals

19

Infrastructure’s TrainProposalsMOBILITY

20

New AccessesNew Accesses

in existing Line 4in existing Line 4

21

MOBILITY Planning

Accessibility planning.Infrastructure Director Plan (PDI 2001-10)

22

MOBILITYGeneral View

General Road Proposal

23

MOBILITY Bicycle roads proposal

24

MOBILITYPrimary & Secondary

Roads section

25

MOBILITY Road network Plan

26

www.bcn.es/22@bcn

22@mail.bcn.es