1
Re Kgabisa Tshwane Programme
2
Background
• October 1997 Cabinet decision that Departments headquarters must locate in the inner city of Tshwane
• June 2004 programme of action: improvement of the physical work environment for the national government in the inner city of Tshwane
• Re Kgabisa Tshwane programme was launched in November 2005 as a programme to improve the physical working environment of the headquarters of national government departments
3
What is Re Kgabisa Tshwane Programme
Re Kgabisa Tshwane is a ten year two pronged programme
that is aimed at:
1. Providing new and refurbished improved accommodation solutions for civil servants in the inner city of Tshwane. The new and improved accommodation is aimed at improving service delivery to our customers and ensure employee wellness.
2. The new accommodation is to be strategically located in a way that will act as a catalyst for a broader rejuvenation strategy for the inner city of Tshwane.
4
Programme Objectives
Other objectives of the programme
• Minimize the cost of the improvement by maximizing the use of Government own building and related infrastructure.
• Improved service delivery by consolidating and clustering Government departments
• Ensure that the most viable option for each department is executed.
5
Programme Objectives cont.
Secondary objectives
• Promote BEE
• Improve appearance and image of Government in Tshwane
• Promote heritage, culture and capital status of the city
6
Programme Stakeholders
• The programme champions are the DPW, DPSA and CTMM
• The DPW and the CTMM are the programme sponsors and have signed an MOU
• Other stakeholders include National government, Provincial government, Private sector, BEE and SMMEs, etc
• DPW provides long term accommodation solutions for public servants
• CTMM provides both infrastructure and urban management services
• DPSA ensures that the Batho Pele service levels are achieved
• National Treasury is responsible for implementation of the funding strategy
7
Key Deliverables
A. Spatial Development Framework:
• A spatial development framework has been adopted by the CTMM in January 2006.
• Seven precincts have been identified as planning nodes.
• Architectural design guidelines have been developed.
• Heritage guidelines documents have been developed.
• Transport study documents have been developed but not yet finalised.
• Engineering/ Infrastructure documents have been developed.
• Next major work will be detailed precinct designs.
8
TICP SDF : Overall Concept is of consolidation and clustering of Gov. Offices in a series of nodes along two axes associated with key public spaces
9
Precincts planning
10
Key Deliverables cont
B. Needs Assessment:
Needs assessment looks at each departments needs in terms of office space,
parking and the nature of the business of the department vs. location,
accessibility, security etc.
• 98% needs assessment work has been done.
• Approximately one third of government headquarters will remain in their present locations.
• All needs assessments will be finalised end March 2006.
11
Key Delivery cont
C. Options Analysis:• Options Analysis methodology developed (Identifies the
optimal accommodation solution and the financing and implementation strategy) (Treasury requirement)
• First options analyses for DEAT completed in December 2005
• Service providers appointed for option analyses for eleven other departments, will be finalised by July 2006: Labour, Defence, SAMDI, SAPS, Arts and Culture, Transport, Minerals and Energy, Justice, Stats SA, Home Affairs and Government Printers
• Options analyses for remaining departments due to commence in April 2006
12
STATUS OF WORK PER DEPARTMENT
• D. Implementation
Department Work Done Current Physical Improvement
Public Works Needs Analysis Finalised
Contracts has been awarded for phase one.
Phase two is currently on planning.
Cleaning of the outside building is 70 % completed.
Painting of the building has commenced
Floor finishes is 70% completed.
South Wing toilets have been refurbished.
Phase one work will be completed in November 2006.
13
STATUS OF WORK PER DEPARTMENT
Department Work Done Current Physical Improvement
The Presidency Needs assessment finalised
Comprehensive information on the current infrastructure has been compiled.
Master plan document of the integrated improvement has been finalised. Work on the West wing has commenced.
14
STATUS OF WORK PER DEPARTMENT
Department Work Done Current Physical Improvement
Education Needs assessment is complete
The site for development has been finalised.
Architectural designs have been approved.
EIA has been approved.
Financial feasibility studies have been finalised
15
STATUS OF WORK PER DEPARTMENT
Department Work Done Current Physical Improvement
DPSA Needs assessment is complete
The site has been identified
The architectural designs has been finalised
The building has been re-altered to be in line with the needs assessment.
All brick work has been completed
Painting has been completed
90% flooring has been completed.
16
STATUS OF WORK PER DEPARTMENT
Department Work Done Current Physical Improvement
SAPS Needs Analysis Finalised
Awaiting outcome of OA Process
17
STATUS OF WORK PER DEPARTMENT
Department Work Done Current Physical Improvement
Justice and Constitutional Development
Needs Analysis Finalised
Options analysis underway
8 sites shown to DG, COO. Presentation to Minister/Exco 27 Jan.
18
STATUS OF WORK PER DEPARTMENT
Department Work Done Current Physical Improvement
SAMDI Needs Analysis Finalised
Interim accommodation Batho Pele.
19
STATUS OF WORK PER DEPARTMENT
Department Work Done Current Physical Improvement
Department of Home Affairs
Needs Analysis Finalised
Awaiting outcome of OA Process
Interim accommodation solutions are underway. Two properties have been identified. To meet with DG to finalise interim solutions. Upgrade of travena in progress.
20
STATUS OF WORK PER DEPARTMENT
Department Work Done
Current Physical Improvement
Department of Communications
Needs Analysis Finalised
Awaiting outcome of OA Process. , but upgrade of iParioli in progress.
21
STATUS OF WORK PER DEPARTMENT
Department Work Done Current Physical Improvement
Statistics SA Needs Analysis Finalised
A number of sites have been looked at with the top management but awaiting outcome of OA Process
22
STATUS OF WORK PER DEPARTMENT
Department Work Done Current Physical Improvement
Department of Transport
Needs Analysis Finalised
Options analysis advisors have appointed Awaiting outcome of OA Process
23
STATUS OF WORK PER DEPARTMENT
Department Work Done Current Physical Improvement
Department of Minerals & Energy
Needs Analysis Finalised
Initial negotiation with the MDC has began. A meeting to finalise the issues with the CTMM
Awaiting outcome of OA Process
24
STATUS OF WORK PER DEPARTMENT
Department Work Done Current Physical Improvement
Department of Labour
Needs Analysis Finalised
Single Location. Propose development of option ahead of OA process
Also focus will be on finding parking solutions for the building
25
STATUS OF WORK PER DEPARTMENT
Department Work Done Current Physical Improvement
Government Printing Works
Needs Analysis Finalised
Awaiting outcome of OA Process. Major challenge is perimeter security that needs to be built in the process. A number of sites have been visited.
26
STATUS OF WORK PER DEPARTMENT
Department Work Done Current Physical Improvement
Department of Correctional Services
Needs Analysis Finalised
PPP process in progress. Choice of location is Salvakop.
Meeting with Transnet on the 30/03/2006 to make an offer.
27
STATUS OF WORK PER DEPARTMENT
Department Work Done Current Physical Improvement
Department of Science & Technology
Needs Analysis Finalised
Options analysis finalised
Building works well advanced at the CSIR
28
STATUS OF WORK PER DEPARTMENT
Department Work Done Current Physical Improvement
Department of Land Affairs
Needs Analysis Finalised
PPP process in progress. Land has been identified. The MDC has been approached. Awaiting a meeting with the CTMM to finalise land issues. Meeting due 10/03/2006
29
STATUS OF WORK PER DEPARTMENT
Department Work Done Current Physical Improvement
Department of Environmental Affairs & Tourism
Needs Analysis Finalised
PPP process in progress. Land has been identified. Land Evaluations are done. Evaluations will be table on the Land Board on the 17/03/2006
30
STATUS OF WORK PER DEPARTMENT
Department Work Done Current Physical Improvement
Department of Foreign Affairs
Needs Analysis Finalised
PPP process in progress. Land has been identified. Currently EIA processes are in place.
31
Thank You
NGIYABONGA