View
215
Download
0
Category
Preview:
Citation preview
ROCKET PROJECT - 2012
Design Team Members:Neil deGrasse TysonRichard FeynmanStephen Hawking
1
Design Team Nameand/or Logo
Project Purpose
2
Work Breakdown StructureResponsibility Assignment Matrix
Gantt Chart
Hint:• Describe clearly• Do not read directly from your
powerpoint
3
Sketch/Drawing(s) or Picture of your Rocket
Hint: • Brief explanation (verbal) of your
design(s)• Do not read directly from your
powerpoint
4
Materials and approximate cost(table)
Hint: • Brief explanation (verbal)as to why
you chose these materials• Do not read directly from your
powerpoint
5
Physics principles relating to project (multiple slides)
Hint:• Use appropriate language/terminology
• Force, Speed, Acceleration, Thrust, Center of Mass, etc.• Relate the physics you have learned to the project.
• What makes Rocket Flight Possible? Describe in Detail.• How did you calculate the maximum height attained by your rocket• Explain your data, how does it relate to the performance of your Rocket
• Mass of Rocket• Angle - the maximum height attained by your rocket• Water volume used• Air Pressure usedSimulator results http://www.aircommandrockets.com/flying_higher.htm • Initial Thrust• Initial Burn Acceleration• Average Acceleration• Time to Burnout• Burnout Velocity• Drag Force• Actual Apogee`• Total Time of Flight
6
Physics principles relating to project (multiple slides)
Hint:• Pictures or Video to illustrate your explanation
of how rocket flight is possible.• Make Connections to the Entry Document
• Proposal• Brochure• How can this be used to teach science to students
• Do not read directly from your powerpoint
7
ConclusionHint:• Summarize the project. • Did you successfully address all of the
requirements of the Entry Document. • What did you learn; about yourself, your group,
physics, rocket flight, the project?• Do not read directly from your powerpoint
8
Recommended