ProgramProgramIntroduction
MDT Chamber ProductionSilicon Tracker Project
Software & Physics
Frank Linde (15’)Marcel Vreeswijk (25’)
Nigel Hessey (25’)Stan Bentvelsen (30’)
Laboratory Tour: – MDT production line (20’)
– SCT area (20’)
Lunch
Peter Jenni @ NIKHEF, 22-June-2001
2
ATLAS/D0 in Amsterdam & ATLAS/D0 in Amsterdam & NijmegenNijmegen
ATLAS contributions
Muon Spectrometer (hardware)End Cap ToroidsMDT ChambersAlignmentDetector ControlMDT Read-Out Driver
Silicon Tracker (hardware)100 modulesDisc designAssembly & test of one complete end cap
Trigger & DAQ (hard- & software)R&D participation
ATLAS D0Staff 9 4PostDoc 1 1PhD 7 7Students 1 1Technical support: very good
MedipixDataGRID
(G measurement)
3
End Cap ToroidsEnd Cap Toroids
Vacuum Vessels
(Schelde Exotech)
First Vessel: Assembly in progress to CERN: fall 2001 (6 months delay)
Second Vessel: Machining in progress to CERN: spring 2002 (on time)
Coil Winding
(HMA power systems)
Conductor delivery problematic; other materials & tools in place
Negotiations on claimed cost overruns by the company ongoing
4
Muon-Spectrometer: Muon-Spectrometer: AlignmentAlignment
Alignment
Key issue: RASNIK 3-point monitorStatus: Sensors delivered to MDT sites; DAQ prototypedOutstanding: Radiation tolerance of the multiplexersDifficulties: Cost (mechanics!) & lens quality
Many other interested parties M
asterMux
USA15Mux
On-chamber Off-chamber
mask
CCD
lensmultiplexer
5
Muon-Spectrometer: Detector Muon-Spectrometer: Detector ControlControl
Detector control (NIKHEF/CERN R&D collaboration)
Key issue: Modular: CAN CPU with many sensor types precise Hall B-sensors; cheap T-sensors, …Status: Being delivered to MDT sitesOutstanding: Radiation tolerance of the CAN CPUs
Used also by: D0, Saclay,
CMS(?), LAr (H8), …
T-sensors30 max
T0.2 oCB-sensorsB/B10-4
CAN
Network
digital busses to MDT front-end
extra bus(insuranc
e)
On-chamber
6
(Muon-Spectrometer:)(Muon-Spectrometer:) Read-Out DriverRead-Out Driver
Read-Out Driver
Difficulty: Cost (ROD+CSM doubles CORE)
Status: R&D phase Test bed: cosmic ray set-up
1.28 Gbit/s S-Link to ROB
6 x
CSM-Link
CSM-Link
TDC 1
TDC 18
CSM18 x
TDC 1
TDC 18
CSM18 x
MDT chambers
MROD(NIKHEF)
USA15
ROB
Surface
ROD or ROB “IN”
ROD or ROB “OUT”CSM
7
Trigger & DAQTrigger & DAQ
design & studies of MDT-ROD/ROS
MDT-ROD construction
spreadsheet & computer
model:
ROBs, networks & LVL2
processor farm
November 2001: Trigger, DAQ & DCS week @ NIKHEF
online softwareDCS software
{
8
ATLAS efforts on realization of CORE commitments
(We realize our participation in ATLAS physics studies is not in line with our ambition ………)
Muon SpectrometerEnd cap Toroids
Vacuum vessels: progressing well (minor delays)Coil winding: company claims cost overruns
MDT chamber construction:R&D basically completed (and it took a lot of time)Huge “serial” production effort in 2001-2005
Alignment, Detector Control & MDT Read-Out DriversCompleted or near completionPoint of concern: radiation tolerance
Silicon Tracker: Design closure urgently required (else we get squeezed)Significant assembly & test effort in 2002-2003/4
Trigger & DAQ:Many R&D contributions; synergy with MDT-Read-Out Driver project
SummarySummary