Roadway Target Spread Rate

The Target for Traffic Level D, Design Mix SP 04-3807, Coarse SP-9.5 with a gmm of 2.339.

43.3 lbs./SY x 2.339 = 101.28 Lbs/SY/in. 101.28 Lbs/ in. x 1.5” = 151.92 lbs./SY or

a target of 152 lbs./SY +/- 5% Minimum = 144.4 lbs/SY Maximum = 159.6 lbs/SY

8

Asphalt Road Reports

9

10

Target Spread Rate Set

11

12

Asphalt Road Report Header

13

14

15

16

17

18

19

330-2.2 Minimum Process Control Testing Requirements

5. Monitor the mix spread rate at the beginning of each day’s production, and as needed to control the operations, at a minimum of once per 200 tons (200 metric tons) placed to ensure that the spread rate is within 5% of the target spread rate. When determining the spread rate, use an average of five truckloads of mix.

If the Contractor fails to maintain the construction process in accordance with the approved Quality Control Plan, the Engineer may elect to stop the construction operation at any time until the deficiencies are corrected.

20

21

Target and Actual Spread Rate

22

23

Paving Completed

24

Pay Is Limited To 105% Of Set Spread Rate

25

26

Lot Density

27

How the Quantities of Density and Non-Density Tons Affect

the Composite Pay Factor (CPF)

28

29

30

31

32

33

34

35

36

37

38

39

Plant Reports

40

41

42

Lot Submittal Package

43

44

45

46

47

48

49

50

51

Recommended