B u l k & L o c a t i o n

BASIC B.I.M PRESENTATION

STEPHENSON & TURNER BUILDING INFORMATION MODELING (B.I.M)

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

OBJECTIVE To have an open forum.

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

OBJECTIVE To have an open forum.

We wish to discuss:Relationships & Co-operation in a B.I.M Environment

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

OBJECTIVE To have an open forum.

We wish to discuss:Relationships & Co-operation in a B.I.M EnvironmentRule No1

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

OBJECTIVE To have an open forum.

We wish to discuss:Relationships & Co-operation in a B.I.M EnvironmentRule No1

Everything should be as simple as it is, but not simpler.

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

OBJECTIVE To have an open forum.

We wish to discuss:Relationships & Co-operation in a B.I.M EnvironmentRule No1

Everything should be as simple as it is, but not simpler.

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

OBJECTIVE To have an open forum.

We wish to discuss:Relationships & Co-operation in a B.I.M EnvironmentRule No1

Everything should be as simple as it is, but not simpler.

Any intelligent fool can make things bigger & more complex...It takes a touch of genius and a lot of courage to move in the opposite direction.

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

OBJECTIVE To have an open forum.

We wish to discuss:Relationships & Co-operation in a B.I.M EnvironmentRule No1

Everything should be as simple as it is, but not simpler.

Any intelligent fool can make things bigger & more complex...It takes a touch of genius and a lot of courage to move in the opposite direction.

1. In this forum can we apply this principle?

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

OBJECTIVE To have an open forum.

We wish to discuss:Relationships & Co-operation in a B.I.M EnvironmentRule No1

Everything should be as simple as it is, but not simpler.

Any intelligent fool can make things bigger & more complex...It takes a touch of genius and a lot of courage to move in the opposite direction.

1. In this forum can we apply this principle?

2. Disclaimer

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

B.I.M, What is it ?

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

B.I.M, What is it ?

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

B.I.M, What is it ?

Prior to defining the B.I.M process, one needs to ask the question:

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

B.I.M, What is it ?

Prior to defining the B.I.M process, one needs to ask the question: “ Why are clients asking to have design teams all work on Revit in a co-operative B.I.M environment ?”

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

B.I.M, What is it ?

Prior to defining the B.I.M process, one needs to ask the question: “ Why are clients asking to have design teams all work on Revit in a co-operative B.I.M environment ?”

Why B.I.M ?

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

B.I.M, What is it ?

Prior to defining the B.I.M process, one needs to ask the question: “ Why are clients asking to have design teams all work on Revit in a co-operative B.I.M environment ?”

Why B.I.M ?

Internationally B.I.M has been proven to be the most cost effective construction process

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

B.I.M, What is it ?

Prior to defining the B.I.M process, one needs to ask the question: “ Why are clients asking to have design teams all work on Revit in a co-operative B.I.M environment ?”

Why B.I.M ?

Internationally B.I.M has been proven to be the most cost effective construction process

1 - Money

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

B.I.M, What is it ?

Prior to defining the B.I.M process, one needs to ask the question: “ Why are clients asking to have design teams all work on Revit in a co-operative B.I.M environment ?”

Why B.I.M ?

Internationally B.I.M has been proven to be the most cost effective construction process

1 - Money

2 - Demand for information

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

Who are the main beneficiaries of the B.I.M process ?

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

Who are the main beneficiaries of the B.I.M process ?

1 - Tenant / Occupant

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

Who are the main beneficiaries of the B.I.M process ?

1 - Tenant / Occupant

2 - Client

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

Who are the main beneficiaries of the B.I.M process ?

1 - Tenant / Occupant

2 - Client} Have the most to gain

No real cost in implementation

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

Who are the main beneficiaries of the B.I.M process ?

1 - Tenant / Occupant

2 - Client

3 - Construction Company

} Have the most to gain No real cost in implementation

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

Who are the main beneficiaries of the B.I.M process ?

1 - Tenant / Occupant

2 - Client

3 - Construction Company

} Have the most to gain No real cost in implementation

Reduced cost due to better Clash detection & Co-ordination Minimal cost until 4D & 5D

}

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

Who are the main beneficiaries of the B.I.M process ?

1 - Tenant / Occupant

2 - Client

3 - Construction Company

4 - Main Design Team ( Primary Data User )

} Have the most to gain No real cost in implementation

Reduced cost due to better Clash detection & Co-ordination Minimal cost until 4D & 5D

}

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

Who are the main beneficiaries of the B.I.M process ?

1 - Tenant / Occupant

2 - Client

3 - Construction Company

4 - Main Design Team ( Primary Data User )

} Have the most to gain No real cost in implementation

Reduced cost due to better Clash detection & Co-ordination Minimal cost until 4D & 5D

New software & staff training requirementConsiderable costs in implementation Correct B.I.M = Productivity gains, only if the core stays intact

}

}

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

Who are the main beneficiaries of the B.I.M process ?

1 - Tenant / Occupant

2 - Client

3 - Construction Company

4 - Main Design Team ( Primary Data User )

5 - Larger Design Team ( Secondary Data User )

} Have the most to gain No real cost in implementation

Reduced cost due to better Clash detection & Co-ordination Minimal cost until 4D & 5D

New software & staff training requirementConsiderable costs in implementation Correct B.I.M = Productivity gains, only if the core stays intact

}

}

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

Who are the main beneficiaries of the B.I.M process ?

1 - Tenant / Occupant

2 - Client

3 - Construction Company

4 - Main Design Team ( Primary Data User )

5 - Larger Design Team ( Secondary Data User )

} Have the most to gain No real cost in implementation

Reduced cost due to better Clash detection & Co-ordination Minimal cost until 4D & 5D

New software & staff training requirementConsiderable costs in implementation Correct B.I.M = Productivity gains, only if the core stays intact

}

}

}Reduced cost due to better Input information, only if the model stays intactMinimal cost until 4D & 5D

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

Who are the main beneficiaries of the B.I.M process ?

1 - Tenant / Occupant

2 - Client

3 - Construction Company

4 - Main Design Team ( Primary Data User )

5 - Larger Design Team ( Secondary Data User )

6 - Sub Contractors ( Third Data User )

} Have the most to gain No real cost in implementation

Reduced cost due to better Clash detection & Co-ordination Minimal cost until 4D & 5D

New software & staff training requirementConsiderable costs in implementation Correct B.I.M = Productivity gains, only if the core stays intact

}

}

}Reduced cost due to better Input information, only if the model stays intactMinimal cost until 4D & 5D

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

Who are the main beneficiaries of the B.I.M process ?

1 - Tenant / Occupant

2 - Client

3 - Construction Company

4 - Main Design Team ( Primary Data User )

5 - Larger Design Team ( Secondary Data User )

6 - Sub Contractors ( Third Data User )

} Have the most to gain No real cost in implementation

Reduced cost due to better Clash detection & Co-ordination Minimal cost until 4D & 5D

New software & staff training requirementConsiderable costs in implementation Correct B.I.M = Productivity gains, only if the core stays intact

}

}

}

}

Reduced cost due to better Input information, only if the model stays intactMinimal cost until 4D & 5D

Reduced cost due to 2D or 3D content for there shop drawings , only if the model stays intact.2D Minimal cost. 3D Increased cost.

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

1 - Tenant / Occupant

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

1 - Tenant / Occupant

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

1 - Tenant / Occupant2 - Client

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

1 - Tenant / Occupant2 - Client

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

1 - Tenant / Occupant2 - Client1 & 2 can be combined

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

1 - Tenant / Occupant2 - Client1 & 2 can be combined

Who is Next ?

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

1 - Tenant / Occupant2 - Client1 & 2 can be combined

Who is Next ?( This is not a hierarchical structure )

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

1 - Tenant / Occupant2 - Client1 & 2 can be combined

Who is Next ?( This is not a hierarchical structure )

Relationship Dance Analogy

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

1 - Tenant / Occupant2 - Client1 & 2 can be combined

Who is Next ?( This is not a hierarchical structure )

Relationship Dance AnalogyWho wants to Dance ?

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

1 - Tenant / Occupant2 - Client1 & 2 can be combined

Who is Next ?( This is not a hierarchical structure )

Relationship Dance AnalogyWho wants to Dance ?If the CLIENT is a Pretty Woman

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

1 - Tenant / Occupant2 - Client1 & 2 can be combined

Who is Next ?( This is not a hierarchical structure )

Relationship Dance AnalogyWho wants to Dance ?If the CLIENT is a Pretty Womanand theCONSULTANTS are young Men.

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

1 - Tenant / Occupant2 - Client1 & 2 can be combined

Who is Next ?( This is not a hierarchical structure )

Relationship Dance AnalogyWho wants to Dance ?If the CLIENT is a Pretty Womanand theCONSULTANTS are young Men.

The men want to impress and get the opportunity to have a dance.

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

1 - Tenant / Occupant2 - Client1 & 2 can be combined

Who is Next ?( This is not a hierarchical structure )

Relationship Dance AnalogyWho wants to Dance ?If the CLIENT is a Pretty Womanand theCONSULTANTS are young Men.

The men want to impress and get the opportunity to have a dance.BUTWhat is this dance ?

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

1 - Tenant / Occupant2 - Client1 & 2 can be combined

Who is Next ?( This is not a hierarchical structure )

Relationship Dance AnalogyWho wants to Dance ?If the CLIENT is a Pretty Womanand theCONSULTANTS are young Men.

The men want to impress and get the opportunity to have a dance.BUTWhat is this dance ?Is this a singular partnership dance ?Or is this a group dance ?

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

1 - Tenant / Occupant2 - Client1 & 2 can be combined

Who is Next ?( This is not a hierarchical structure )

Relationship Dance AnalogyWho wants to Dance ?If the CLIENT is a Pretty Womanand theCONSULTANTS are young Men.

The men want to impress and get the opportunity to have a dance.BUTWhat is this dance ?Is this a singular partnership dance ?Or is this a group dance ?Do we all have the same song sheets ?

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

1 - Tenant / Occupant2 - Client1 & 2 can be combined

Who is Next ?( This is not a hierarchical structure )

Relationship Dance AnalogyWho wants to Dance ?If the CLIENT is a Pretty Womanand theCONSULTANTS are young Men.

The men want to impress and get the opportunity to have a dance.BUTWhat is this dance ?Is this a singular partnership dance ?Or is this a group dance ?Do we all have the same song sheets ?Is there a band leader ?

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

Principal Consultants - Documentation

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

Principal Consultants - DocumentationA - ArchitectsS - Structural EngineersM.E.P - Service Engineers

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

Principal Consultants - DocumentationA - ArchitectsS - Structural EngineersM.E.P - Service Engineers

In this group. Who is the Poor cousin ?

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

Principal Consultants - DocumentationA - ArchitectsS - Structural EngineersM.E.P - Service Engineers

In this group. Who is the Poor cousin ?M.E.P - Service EngineersWhy is this ?

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

Principal Consultants - DocumentationA - ArchitectsS - Structural EngineersM.E.P - Service Engineers

In this group. Who is the Poor cousin ?M.E.P - Service EngineersWhy is this ?Is this relationship changing,and Why ?

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

Principal Consultants - DocumentationA - ArchitectsS - Structural EngineersM.E.P - Service Engineers

In this group. Who is the Poor cousin ?M.E.P - Service EngineersWhy is this ?Is this relationship changing,and Why ?GREENF.M = 80% Building cost

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

Principal Consultants - DocumentationA - ArchitectsS - Structural EngineersM.E.P - Service Engineers

In this group. Who is the Poor cousin ?M.E.P - Service EngineersWhy is this ?Is this relationship changing,and Why ?GREENF.M = 80% Building cost

Client’s brief in a B.I.M environment:Clients give work to...?

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

Principal Consultants - DocumentationA - ArchitectsS - Structural EngineersM.E.P - Service Engineers

In this group. Who is the Poor cousin ?M.E.P - Service EngineersWhy is this ?Is this relationship changing,and Why ?GREENF.M = 80% Building cost

Client’s brief in a B.I.M environment:Clients give work to...?

1- People they trust

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

Principal Consultants - DocumentationA - ArchitectsS - Structural EngineersM.E.P - Service Engineers

In this group. Who is the Poor cousin ?M.E.P - Service EngineersWhy is this ?Is this relationship changing,and Why ?GREENF.M = 80% Building cost

Client’s brief in a B.I.M environment:Clients give work to...?

1- People they trust2- People with the knowledge to achieve their goals

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

Principal Consultants - DocumentationA - ArchitectsS - Structural EngineersM.E.P - Service Engineers

In this group. Who is the Poor cousin ?M.E.P - Service EngineersWhy is this ?Is this relationship changing,and Why ?GREENF.M = 80% Building cost

Client’s brief in a B.I.M environment:Clients give work to...?

1- People they trust2- People with the knowledge to achieve their goals

3- Main goals: On time/ To budget / Max. profit

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

Principal Consultants - DocumentationA - ArchitectsS - Structural EngineersM.E.P - Service Engineers

In this group. Who is the Poor cousin ?M.E.P - Service EngineersWhy is this ?Is this relationship changing,and Why ?GREENF.M = 80% Building cost

Client’s brief in a B.I.M environment:Clients give work to...?

1- People they trust2- People with the knowledge to achieve their goals

3- Main goals: On time/ To budget / Max. profit4- To Specification

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

Construction CompaniesWhere are they positioned?

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

Construction CompaniesWhere are they positioned?

QS & Project ManagersWhere are they positioned?

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

Construction CompaniesWhere are they positioned?

QS & Project ManagersWhere are they positioned?

Traditional Contract Relationships1 - Older Traditional ( Architect principal consultant )

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

Construction CompaniesWhere are they positioned?

QS & Project ManagersWhere are they positioned?

Traditional Contract Relationships1 - Older Traditional ( Architect principal consultant )

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

Construction CompaniesWhere are they positioned?

QS & Project ManagersWhere are they positioned?

Traditional Contract Relationships1 - Older Traditional ( Architect principal consultant )

2 - Standard NZ Larger Project

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

Construction CompaniesWhere are they positioned?

QS & Project ManagersWhere are they positioned?

Traditional Contract Relationships1 - Older Traditional ( Architect principal consultant )

2 - Standard NZ Larger Project

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

Construction CompaniesWhere are they positioned?

QS & Project ManagersWhere are they positioned?

Traditional Contract Relationships1 - Older Traditional ( Architect principal consultant )

2 - Standard NZ Larger Project3 - Novated

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

Construction CompaniesWhere are they positioned?

QS & Project ManagersWhere are they positioned?

Traditional Contract Relationships1 - Older Traditional ( Architect principal consultant )

2 - Standard NZ Larger Project3 - Novated

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

Construction CompaniesWhere are they positioned?

QS & Project ManagersWhere are they positioned?

Traditional Contract Relationships1 - Older Traditional ( Architect principal consultant )

2 - Standard NZ Larger Project3 - Novated

What defines these contracts ?

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

Construction CompaniesWhere are they positioned?

QS & Project ManagersWhere are they positioned?

Traditional Contract Relationships1 - Older Traditional ( Architect principal consultant )

2 - Standard NZ Larger Project3 - Novated

What defines these contracts ? - NZIA Terms of engagement

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

Construction CompaniesWhere are they positioned?

QS & Project ManagersWhere are they positioned?

Traditional Contract Relationships1 - Older Traditional ( Architect principal consultant )

2 - Standard NZ Larger Project3 - Novated

What defines these contracts ? - NZIA Terms of engagement

Do we have B.I.M contracts ?

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

Construction CompaniesWhere are they positioned?

QS & Project ManagersWhere are they positioned?

Traditional Contract Relationships1 - Older Traditional ( Architect principal consultant )

2 - Standard NZ Larger Project3 - Novated

What defines these contracts ? - NZIA Terms of engagement

Do we have B.I.M contracts ? - A.I.A Integrated Project Delivery

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

Construction CompaniesWhere are they positioned?

QS & Project ManagersWhere are they positioned?

Traditional Contract Relationships1 - Older Traditional ( Architect principal consultant )

2 - Standard NZ Larger Project3 - Novated

What defines these contracts ? - NZIA Terms of engagement

Do we have B.I.M contracts ? - A.I.A Integrated Project Delivery

Consultant’s primary mission is ?

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

Construction CompaniesWhere are they positioned?

QS & Project ManagersWhere are they positioned?

Traditional Contract Relationships1 - Older Traditional ( Architect principal consultant )

2 - Standard NZ Larger Project3 - Novated

What defines these contracts ? - NZIA Terms of engagement

Do we have B.I.M contracts ? - A.I.A Integrated Project Delivery

Consultant’s primary mission is ?1- Provide value to clients

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

Construction CompaniesWhere are they positioned?

QS & Project ManagersWhere are they positioned?

Traditional Contract Relationships1 - Older Traditional ( Architect principal consultant )

2 - Standard NZ Larger Project3 - Novated

What defines these contracts ? - NZIA Terms of engagement

Do we have B.I.M contracts ? - A.I.A Integrated Project Delivery

Consultant’s primary mission is ?1- Provide value to clients2- B.I.M provides better value

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

Construction CompaniesWhere are they positioned?

QS & Project ManagersWhere are they positioned?

Traditional Contract Relationships1 - Older Traditional ( Architect principal consultant )

2 - Standard NZ Larger Project3 - Novated

What defines these contracts ? - NZIA Terms of engagement

Do we have B.I.M contracts ? - A.I.A Integrated Project Delivery

Consultant’s primary mission is ?1- Provide value to clients2- B.I.M provides better value

THAT’S IT!!!

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

How to implement B.I.M correctly ?

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

How to implement B.I.M correctly ?1- New B.I.M contract: A.I.A - Integrated project delivery

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

How to implement B.I.M correctly ?1- New B.I.M contract: A.I.A - Integrated project delivery2- Business plan for B.I.M: Lead, follow or get out of the way

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

How to implement B.I.M correctly ?1- New B.I.M contract: A.I.A - Integrated project delivery2- Business plan for B.I.M: Lead, follow or get out of the way3- New foundations (Standards, Systems, Processes)

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

How to implement B.I.M correctly ?1- New B.I.M contract: A.I.A - Integrated project delivery2- Business plan for B.I.M: Lead, follow or get out of the way3- New foundations (Standards, Systems, Processes)4- Training & education

(In-house & design team)

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

How to implement B.I.M correctly ?1- New B.I.M contract: A.I.A - Integrated project delivery2- Business plan for B.I.M: Lead, follow or get out of the way3- New foundations (Standards, Systems, Processes)4- Training & education

(In-house & design team)

This will define to the client:

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

How to implement B.I.M correctly ?1- New B.I.M contract: A.I.A - Integrated project delivery2- Business plan for B.I.M: Lead, follow or get out of the way3- New foundations (Standards, Systems, Processes)4- Training & education

(In-house & design team)

This will define to the client:1- What your company will deliver

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

How to implement B.I.M correctly ?1- New B.I.M contract: A.I.A - Integrated project delivery2- Business plan for B.I.M: Lead, follow or get out of the way3- New foundations (Standards, Systems, Processes)4- Training & education

(In-house & design team)

This will define to the client:1- What your company will deliver2- What the design team will deliver

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

How to implement B.I.M correctly ?1- New B.I.M contract: A.I.A - Integrated project delivery2- Business plan for B.I.M: Lead, follow or get out of the way3- New foundations (Standards, Systems, Processes)4- Training & education

(In-house & design team)

This will define to the client:1- What your company will deliver2- What the design team will deliver3- No unrealistic expectations regarding B.I.M

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

How to implement B.I.M correctly ?1- New B.I.M contract: A.I.A - Integrated project delivery2- Business plan for B.I.M: Lead, follow or get out of the way3- New foundations (Standards, Systems, Processes)4- Training & education

(In-house & design team)

This will define to the client:1- What your company will deliver2- What the design team will deliver3- No unrealistic expectations regarding B.I.M

Consultants’ main point of difference regarding B.I.M:

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

How to implement B.I.M correctly ?1- New B.I.M contract: A.I.A - Integrated project delivery2- Business plan for B.I.M: Lead, follow or get out of the way3- New foundations (Standards, Systems, Processes)4- Training & education

(In-house & design team)

This will define to the client:1- What your company will deliver2- What the design team will deliver3- No unrealistic expectations regarding B.I.M

Consultants’ main point of difference regarding B.I.M:1- Multi- Disciplined Company Standards and processes Co-ordinated

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

How to implement B.I.M correctly ?1- New B.I.M contract: A.I.A - Integrated project delivery2- Business plan for B.I.M: Lead, follow or get out of the way3- New foundations (Standards, Systems, Processes)4- Training & education

(In-house & design team)

This will define to the client:1- What your company will deliver2- What the design team will deliver3- No unrealistic expectations regarding B.I.M

Consultants’ main point of difference regarding B.I.M:1- Multi- Disciplined Company Standards and processes Co-ordinated2- Fully understanding the B.I.M process

B a s i c B I M C o n c e p t sBUILDING INFORMATION MODELING (BIM)

How to implement B.I.M correctly ?1- New B.I.M contract: A.I.A - Integrated project delivery2- Business plan for B.I.M: Lead, follow or get out of the way3- New foundations (Standards, Systems, Processes)4- Training & education

(In-house & design team)

This will define to the client:1- What your company will deliver2- What the design team will deliver3- No unrealistic expectations regarding B.I.M

Consultants’ main point of difference regarding B.I.M:1- Multi- Disciplined Company Standards and processes Co-ordinated2- Fully understanding the B.I.M process3- Cloud technology