Roof integration USA15 cavern integration Sylwia Wojnarska CERN - European Organization for Nuclear...

Preview:

Citation preview

Preliminary Pipe Integration

Roof integration USA15 cavern integration

Sylwia Wojnarska CERN - European Organization for Nuclear Research

sylwia.wojnarska@cern.chWarsaw University of Technology

Roof integrationPlatform on the roof of 3184 building

Dimensions of the platform

Roof integration

Dimensions of the platform

Roof integration

Dimensions of the platform

Roof integration

Dimensions of the platform with tank and condenser (made from 2D drawings)

Roof integration

Pipe integration

Roof integration

Pipe integration

Roof integration

Location of the valves

Roof integration

USA15 cavern integrationTwo pipes:

Yellow pipe – DN 200, vapour pipe from Manifold to Balcony Unit

Orange pipe – DN 50, liquid pipe from Balcony Unit to Manifold

USA15 cavern integrationDimensions and path of the Yellow pipe

There is no space between existing pipes and the dark blue unit, but there is a gap between floors

USA15 cavern integration

Dimensions and path of the Orange pipe

USA15 cavern integration

View from inside

USA15 cavern integration

View from inside

USA15 cavern integration

View from inside

USA15 cavern integration

View from inside

USA15 cavern integration

View from inside – compressor room – over the entrance door

USA15 cavern integration

View from inside – compressor room

USA15 cavern integration

View from inside – manifold

USA15 cavern integration

View from inside – manifold

USA15 cavern integration

View from inside – manifold

USA15 cavern integration

Sylwia Wojnarska CERN - European Organization for Nuclear Research

sylwia.wojnarska@cern.chWarsaw University of Technology

Thank you for your attention!

Any questions?