TABLE OF CONTENTS TABLE OF CONTENTS

INTRODUCTION

SERVICE & SPECIALISATION

WORK SCOPE AND MAJOR WORKS

LIST OF PROJECT EXPERIENCE

HEALTH, SAFETY & ENVIRONMENT

LIST OF EQUIPMENT AND WORKSHOP FACILITIES

COMPANY ORGANIZATION CHART

LICENCES

RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS

INTRODUCTION

RHS Tech Corporation Sdn Bhd was incorporated under Company Act 1965 onJune 29, 2002 and wholly owned (100%) by Bumiputra. In the beginning, RHS Tech Corporation Sdn Bhd started its business by providing various services toclient mainly within the Kerteh Industrial Area, Terengganu.Now the company has progressed its business coverage to service clients not onlyin Kerteh are butalso in other regions in Malaysia.

Our Corporation objective is to expand and enhance our capabilities and

OUR OBJECTIVE

p j p pcom[entencies in providing high quality services in the field of Electrical andInstrument, Servicing and Project EPCC works particularly in the Oil & Gas andPetrochemical Industries. We are committed in ensuring high standard of professionalism in our operation to meet client's specific requirements.

CORPORATE INFORMATION

BOARD OF DIRECTORY / SHAREHOLDER

MOHD RODZI BIN HUSSEIN - Managing DirectorHD B N HD LLEH D

CORPORATE INFORMATION

MOHD KASIM BIN MOHD SALLEH - DirectorZAKARIA BIN ABDU RAHMAN - Execuitve Director

PAID UP CAPITAL - RM500,000.00AUTHORISED CAPITAL - RM500,000.00

RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS

SERVICE & SPECIALISATIONSERVICE & SPECIALISATION

In addition, RHS Tech Corporation Sdn Bhd is an electrical and instrumentation company based which are registered with Suruhanjaya Tenaga Malaysia and PKK Class II .We are providing Field instrument design and specification per ISA Standard and We are providing Field instrument design and specification per ISA Standard and SIPW SIOP Standard.Well verse in American and European Standard such as NEMA, ISA, NEC and CENELEC.Implementing the design system into various kind of available systems for process requirement. Provision of experience analyzer manpower to perform daily preventivemaintenance etc. Performing electrical construction and related work such as design ofauto transformer starter control circuit, motor servicing etc. Troubleshooting and repairworks on all process measurment and control instrumentation Control Valve & PSVworks on all process measurment and control instrumentation. Control Valve & PSVoverhaul and repair and calibration.

RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS

SERVICE & SPECIALISATION

PLANT TURN - AROUNDWe were involved in a few major and minor shutdown works such as Petronas GasProcessing Plant 1, 2, 3 and 4, Petronas Penapisan (T) Sdn Bhd, Ethylene / PolyethyleneMalaysia Sdn Bhd, Tenaga Nasional PowerStation and Huntsman Tioxide Plant.During turn around we are providing the

PLANT TURN - AROUND

During turn around we are providing the most effiency project scheduling to cater customer shutdown planning.

E & I CONSTRUCTION WORKInvolve in hook up and commissioning work whichinclude cabling, street, perimeter, helideck and flood lighting, lighting distribution board, motor circuit,panels, earthing and lighting protection, electricalprotective relay, UPS Installation, public address system installation and other related electrical works.In field instrument installation we are providing suchp gas flow , level, pressure, temperature, control valve, gas flow meter, fusible flug loop and also on lineanalyzer. The works covered testing and commissioning for the whole loops.During project execution we are also to ensure andverified all construction works are complying with project specification, drawings and procedure.p j p f , g p

To do maintenance work as requested by clientE & I MAINTENANCE WORKS

To do maintenance work as requested by client,our technician and engineers are capable totrouble shoot the faulty equipment and putting back on line as normal.We are also providing and experience analyzermanpower to perform daily preventive maintanencework such as trouble shooting and repair workfor all process measurement control systemfor all process measurement control systemand electrical device.

RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS

SERVICE & SPECIALISATION

FIRE FIGHTING, ALARM & DETECTION SYSTEMWe are capable in supply, installation, testing andcommissioning the system for building and plantinstallation on gas detector, smoke, heat and sound & alarm system. Our experience had covered all installation involve in fire fighting work such as FM200 system,fire sprinkler system, CO2 system and fire protection system in turbine and generator room, local fire alarm system and

,

in turbine and generator room, local fire alarm system and fire suppression system for all downstream and upstream sector.Thus, our employee having enough knowlwdge and had attended the course which was organized by BOMBA and FIRE & SAFETY council and also seminar and exhibition from the principal of the fire system.

RHS T h i ff i t h i l i i d ltiTECHNICAL ENGINEERING CONSULTING SERVICES

RHS Tech is offering technical engineering and consultingservices for minor designing works particularly for Oil,Gas and Petrochemicals. The Company has succesfully takenseveral minor design and engineering work We are also develop project assigned from grassroot level to the implementation phase of project developmentfrom conceptual study to detailed engineering and cost

llestimated. Hence, we had to monitor all the preparation ofengineering, drawings and construction documentsDuring project construction to ensure comply with design and safety standard. i.e : Air Compressor Lead Lag Control System and CondensateSteam Recovery Skid and upgrading existing mimic panel.

SUPPLY OF TECHNICAL LABOUR AND PROFFESIONAL MANPOWERAs requested by the client, we are ready to supply various categories of competencemanpower at reasonable rate for Oil and Gas and petrochemical plant.

SUPPLY OF TECHNICAL LABOUR AND PROFFESIONAL MANPOWER

With the good relation between the principal suppliers andmanufactures, we are able to supply various types of

TRADING OF OIL & GAS EQUIPMENT / PARTS

manufactures, we are able to supply various types ofequipments and parts as reasonables price and delivery.Supply of oil and gas material and equipment such as pipe fittings, tools, machineries spare parts, TLV steam traps, gasket (TOMBO) and chemicals for boiler & water treatmentand also electrical and instruments spare parts.

RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS

COMPANY ORGANIZATION CHART COMPANY ORGANIZATION CHART

RHS TECH CORPORATION SDN BHDBOARD OF DIRECTOR

Managing Director Mohd Rodzi bin HusseinManaging Director

Mohd Rodzi bin Hussein

DirectorDirectorMohd Kasim Mohd Salleh

Executive DirectorMohd Norman bin Awang

Company SecretaryImbasan Nilai Sdn Bhd

Project ManagerMohd Zubaidillah Isa

Teknikal ExecutiveEzani bin Ab GhaniE & I Engineer

Taib bin Bakil

Contract EngineerAifah Ariffin

]

Taib bin Bakil

Procurement ExecutiveMuhammad Azmi Hj Omar

SupervisorMohd Rodzi Bin Sembok

] TechnicianMohd Azrol Azman

Assistant Of ProcurementWan Nor Eda

RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS

WORK SCOPE AND MAJOR WORKS

☼ Helideck Lighting Revamp at Bekok A & C Platform

☼ Engineering, Procurement, Construction & Commissioning for the replacement for Faulty Explosion Proof at OGT

☼ Installation of V-Cone Gas Flowmeter for Gas Lift Test Header& GasLeg Test Separator

☼ Conduct Full Inspection and Maintenance for Generator G420

☼ Supply of Manpower, Materials, Equipment & Consumables for Generator G 400 Repair & Maintenance at Bekok A Platform

☼ Gas Compressor Piping at Tinggi A Platform

☼ Refurbishment of Turbine Generator Busduct Enclosure at Tiong A

☼ Fusible Plug Loop Tubing at DPP-A

☼ Fire and Gas System Upgrading at Tiong A Platform☼ y pg g g

☼ To Supply Automatic Temperature Control valve to Angsi

☼ Relay Calibration at Bekok A, Tiong A, Tinggi A & Pulai A

☼ Testing and Calibration of Electrical Protective Relays and Breakers for AngsiBreakers for Angsi

☼ Rewiring Lighting Points at Kerteh Esso Complex

☼ To Installation of One Unit PCV 5480 at Angsi Platform

☼ Fire Alarm System Upgrade at KSB Warehouse No 4 & 5

☼ Electrical & Instrument Control System for New Air Compressor System at Dulang B and FSO Dulang

☼ Supply of Instrumentation for PNL Flowlines at Penara

☼ To Supply, Install, Testing & Commissioning of Double Block Valve atJDS R i & L hi OGTJDS Receiver & Launching at OGT

☼ Duyong Load Shedding Upgrading

WORK SCOPE AND MAJOR WORKS

☼ Supply, Installation & Commissioning of Level Transmitter LT-130 forSeparator IV-130 at Tiong Platform

☼ Supply of Instrumentation for PNL Flowlines at Penara☼ Supply of Instrumentation for PNL Flowlines at Penara

☼ OGT General Maintenance Services On Electrical Facilities

☼ To Supply & Install Barriers for Bekok C

☼ Supply of Electronic Transformer for Helideck Primeter Lihting at Bekok C

☼ Power Extension for AMS MUX at Angsi Platform

☼ Duyong CPP TG Motor Starter Installation Works - Breakers Installation

☼ To Trouble shoot and Rectify Fault at PCSB KSB Warehouse NO 5

☼ I ll i f S f S i h f N Ai C D l B d L i☼ Installation of Safety Switch for New Air Compressor at Dulang B and LayingNew Power Cable for Air Compressor at FSO Puteri Dulang

☼ To Carry Out Study On Earthing and Lighting Protection System at PM 9

☼ To Relocate WAG Compressor Control Panel at Dulang A Platform

☼ Upgrade of Electrical Lighting System at Warehouse No 4

☼ Installation of Watercut Meters and Associated Instrumentation Works at PM9

☼ To Supply One Pressure Control Valve PV5070 for Dulang B

☼ To Supply of Pneumatic Kill Knob and 3/8" Tubing and Fittings for MalongInfill Drilling at Malong Platform

☼ To Refurbish Gas and Condensate Metering Skid for Bekok C

☼ MOL Pump Switch Upgrade at Pulai A

☼ To Repair and Service Molecular Weight Analyzerp g y

LIST OF PROJECT EXPERIENCENO CLIENT

1 Installation of CO2 Analyzer at GPP2/3/4

Analyzer House

2 Installation of Dissolved On Line Analyzer at

Boiler Feed Water System at GPP 2, 3 & 4

Emerson Process Management

Emerson Process Management

DESCRIPTION

y

3 Cable Installation Work at GPP 3 and 44 To Supply & conduct Installation

5 Instrument Cable Laying c/w for Panel

at GPP 2,3 and 4

6 To Provide Manpower, Tools, Equipment

Nusa Armada Sdn BhdNusa Armada Sdn Bhd

GE Betz Malaysia Sdn Bhd

Local Engineering Sdn Bhd

Test Activity for All Related Cable

6 To Provide Manpower, Tools, Equipment

and Consumables for Generator G400 and

Maintenance at Bekok A

7 Supply of ATS Transformer

8 Supply of Manpower, Material, Equipment

and Consumables for Lay New Power Cable

from Stock Chemical Yard to Existing Panel

Local Engineering Sdn Bhd

Local Engineering Sdn Bhd

Local Engineering Sdn Bhd

from Stock Chemical Yard to Existing Panel

9 To Supply & Install Junction Box

MOL Pump Cable

10 Supply Manpower, Material, Equipment &

Consumables for Fusible Plug Loop

Local Engineering Sdn Bhd

Local Engineering Sdn Bhd

at PCSB Open Yard KSB

Replacement at Duyong Platform

11 Supply of Manpower, Material, Equipment

& Consumables, Tools and Equipment

12 Supply of Manpower to Supervise

FGS Installation at Bekok A

13 Termination Works at Junction Nusa Armada Sdn Bhd

Nusa Armada Sdn Bhd

Local Engineering Sdn Bhd

Box at GPP 2 and 3

14 Supply 600/1000 Power Cable to IEC 332

XLPE/PVC/SWA/PVC

15 To Supply Control Valve for Angsi

Nusa Armada Sdn Bhd

Local Engineering Sdn Bhd

RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RH

LIST OF PROJECT EXPERIENCENO CLIENT

16 Supply for Manpower, Equipment, Tools and

Consumables

17 To Relocate Wag Compressor Control Panel

Nusa Armada Sdn Bhd

Local Engineering Sdn Bhd

LIST OF PROJECT EXPERIENCEDESCRIPTION

g p

at Dulang A Platform

18 To supply Materials, Tools and Equipmentsfor Punch List at GPP 2,3 and 4 Project

19 Supply for Manpower, Material and

Equipments, Scaffolding Rental for Project

at Resak Platform

Nusa Armada Sdn Bhd

Nusa Armada Sdn Bhd

g g

at Resak Platform

20 To Supply Poliken Tape for Punch List for

GPP 2, 3 and 4 Project

21 Rental of 4 x 4 Container c/w Wire Sling

22 To Supply Current Transformer

23 To Supply Motor Management Relay

24 T R d B k D i g t i l t d

Nusa Armada Sdn Bhd

Nusa Armada Sdn Bhd

Local Engineering Sdn Bhd

Local Engineering Sdn Bhd

24 To Redraw Back Drawings at size completed

with Endorsement

25 To Sample and Test Power Transformer

Insullation Oil

26

Recommendation for conducting Discremination

Local Engineering Sdn Bhd

Local Engineering Sdn Bhd

Local Engineering Sdn BhdTo Provide Manpower, Report and

Detail Study on the Electrical Installation

27 Specially Design Portable Battery Charger for

Resak Turbine Generator

28 Eexde Flameroof round cover Junction Boxcompleted with 20 Nos 2.5mm terminals

29 To Supply Cable Glands, Brass, Flameproof Eexde Local Engineering Sdn Bhd

Local Engineering Sdn Bhd

Local Engineering Sdn Bhd

c/w PCP Shroud, Locknuts, Entry Threa Seals &

Serrated Washers Make-BICC / Piralli

30 To Supply M10 x 40 LG Bolt & Nuts & Spring

Washer for project Install & Junction Box

Completed stand for MOL Pump at Bekok A

Local Engineering Sdn Bhd

RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS

NO CLIENT

31 To Supply Transformer for Auto Transfer Switchand MCCB

32 To Service and Calibrate 5 nos of Hydrometer

LIST OF PROJECT EXPERIENCEDESCRIPTION

Nusa Armada Sdn Bhd

Local Engineering Sdn Bhd32 To Service and Calibrate 5 nos of Hydrometerand 2 nos of Thermometer

33 Tp Installation of Coriolis Meters at MalongPlatform

34 To Supervise Works for UPS Upgrading atDuyong Remote Platform

35 To Supply of Surge Suppressor and RotatingDiode for G420 at Pulai A Platform

Local Engineering Sdn Bhd

Local Engineering Sdn Bhd

Nusa Armada Sdn Bhd

Nusa Armada Sdn BhdDiode for G420 at Pulai A Platform

36 To Supply of Manpower to Supervise FGSInstallation at Bekok A, B and C Platform

37 Supply One Site Supervisor for Installation andCommissioning Activities at Resak Platform

38 Upgrade Pedestal Crane Floodlight Cablesat Angsi Platform

39 Review and De- Bugging of Angsi IMCS Program Local Engineering Sdn Bhd

Local Engineering Sdn Bhd

Local Engineering Sdn Bhd

Local Engineering Sdn Bhd

39 Review and De- Bugging of Angsi IMCS Programand Architecture

40 MOL Pump Switch Upgrade at Pulai A41 To Repair and Service Molecular Weight 42 Relay and Calibration & Breaker Service at

Bekok A & C Platform43 Supply of Motor Protection Relay for Dulang B

Motor Booster Pump

Shapadu Sdn BhdLocal Engineering Sdn Bhd

Emerson Processing Management

Local Engineering Sdn Bhd

Nusa Armada Sdn Bhd

Motor Booster Pump44 Installation of TG Motor Starter at Duyong CPP45 The Provision for Procurement Supply, Delivery

Installation, Testing & Commissioning forAudible Gas Alarm and Beacon Lights at GasProcesssiong Plant (GPP) 4 at Kerteh

46 To Supply, Install, Test and CommissioningParts On Chloride Removal Unit GPP 2

Local Engineering Sdn BhdLocal Engineering Sdn Bhd

Local Engineering Sdn BhdParts On Chloride Removal Unit GPP 2

47 Engineering, Procurement Construction and Commissioning to Install Permanent ElectricalPower Supply to RO Unit Chemical InjectionSystem at GPP 2 & 3, GPP A at Kerteh

48 Supply starter Connector to Feed Pump StarterOffshore Installation & Commissioning Services

Local Engineering Sdn Bhd

Local Engineering Sdn Bhd

RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS

NO CLIENT

49 Repair and Troubleshoot Lighting at KSB Warehouse and Open Yard

50 Identity and Replace the Mounting Lighting

LIST OF PROJECT EXPERIENCEDESCRIPTION

Local Engineering Sdn Bhd

Nusa Armada Sdn Bhd50 Identity and Replace the Mounting Lighting

Hanger Broken, Gland Badly condition and

to Rectify low Illumination level51 To Upgrade the Compressor Skid Enclosure

Lighting Cables Conduct and The Light Fittings

52 Supply of Instrumentation for Sotong Flowlines

for Sotong Infill Drilling

Local Engineering Sdn Bhd

Shapadu Sdn Bhd

Nusa Armada Sdn Bhd

for Sotong Infill Drilling53 Power Extension for AMS MUX at Angsi Platform54 To Supply Manpower for Site Visit FSO HV

Damaged55 GPP B - New Instrument Installation56 Supply of Manpower 1HV Chargeman, 1 Wireman

and Termination Kit for SWLP's Motor Installationat Dulang B

Local Engineering Sdn Bhd

Local Engeering Sdn Bhd

Local Engineering Sdn Bhd

Shapadu Sdn Bhd

at Dulang B57 Supply of Instrumentation for PNL Flowlines58 To Refurbish Gas and Condensate Metering

Skid for Bekok C59 Supply of One New Unit 3200A ACB for Pulai A60 Upgrading of Pulai B - Navigation Aids61 To Conduct Site Visit at Bekok A62 Angsi Crane Floodlight Cables

Nusa Armada Sdn Bhd

Local Engineering Sdn BhdNusa Armada Sdn Bhd

Local Engineering Sdn Bhd

Local Engineering Sdn BhdLocal Engineering Sdn Bhd

62 Angsi Crane Floodlight Cables63 To Repair / Services 6.6 KV 410 KW Electric

Mootr 64 Installation of OGT Flare Ognition Pilot System65 To Supply of Labour, Equipment and Materials to

Supply and Replace 2 pcs danaged data cableserver room and guard house using AVAYACAT 5 / i t ti d

Shapad Sdn Bhd

Nusa Armada Sdn Bhd

Shapadu Sdn BhdLocal Engineering Sdn Bhd

CAT 5 c/w accessories, testing and commissioning

66 Junction Box MOL Pump Cable Installationat Bekok A

67 KSB Open Yard Cable Laying68 To Supply Micromate UPS 2000E for Bekok A69 Gas Compressor Piping at Tinggi A70 T S l 4 i Ci i B k f Ai

Local Engineering Sdn Bhd

Local Engineering Sdn Bhd

L l E i i Sd BhdLocal Engineering Sdn BhdLocal Engineering Sdn Bhd

70 To Supply 4 units Circuit Breakers for AirCompressor at Bekok A

RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS

Local Engineering Sdn Bhd

RHS Tech Corporation Sdn Bhd is committed to the Health, Safety and Environment (HSE)of all employees, and strives to practice and adhere to the recognized HSE standards. Thecompany goal is to have incident and accident free workplace. The company will identifyand work to ensure that all hazards, pratices and behavior that can cause accidents,injuries or illness to its employees, contractors and visitors are eliminated.

As an industrial company involved in the Oil, Gas and Construction activities, we shalladapt the following measures :

▲ Company with all relevant statutory regulations

▲ Provide adequate resources to establish and maintain safe work methodsq

▲ Maintin Health, Safety and Enviroment competency and integrate it's policyrequirement in all aspects of business.

▲ Continuosly improve performance through current and innovative technology,education and good management practices

▲ Cultivate Health, Safety and Enviroment habit and practiices in day to day activities

▲ provide appropriate training and briefing related to Health, Safety and Enviromentconcern to all employees

▲ Promote a positive Health, Safety and Environmenture which is based on theprinciple that all incidents and accidents can be prevented and controlledprinciple that all incidents and accidents can be prevented and controlled

▲ Provide an emergency response program for unforeseenevents so as to minimizehazards to human being, assets and the environment

The success of this policy depends on the understanding appreciation and participationof all employeesof all employees.

RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS

LIST OF EQUIPMENT & WORKSHOP FACILITIES LIST OF EQUIPMENT & WORKSHOP FACILITIES

NO QUANTITY

ELECTRICAL TOOL BAG C/W : - 3 set

1 Set of common ring spanner (8mm - 30m) 3

DESCRIPTION

2 Combination plier 33 Cable cutter (shell) 34 Electrical knife c/w spare blade 35 Measuring tape 7.5 meter 36 Monkey plier 37 Set of allan key - imperial 38 Set of allan key - metric 39 Adjustable spanner - 4 inch 3

Adjustable spanner - 8 inch 3Adjustable spanner - 12 inch 3

10 Electrical hammer ( ball head ) 311 Hand saw c/w spare blade 312 Mini hand saw c/w spare blade 313 Crimping tool 3p g14 Wire cutter 315 Test pen ( heavy duty) 316 Square 12 inch 317 3

18 Pipe wrench - 6 inch 3Pipe wrench - 10 inch 3

19 Set of screw driver 3

Water level 200mm

19 Set of screw driver 320 Termination Screw driver 321 Long nose plier - 6 inch 322 Drill bit (complete set) 323 Hole cut 40mm 324 Insulation tester 325 Clampon ammeter - 0900amp 326 Phase rotation meter 326 Phase rotation meter 327 Hand held technometer 328 Digital voltmeter 4 1/2 digit 0-100 miliamp range 329 Stop watch hole saw 330 Electrician hivoltage rubber glove 3

RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS

LIST OF EQUIPMENT & WORKSHOP FACILITIES

NO QUANTITY

INSTRUMENT TOOL BAG C/W :- 3 SET

DESCRIPTION

1 Tubing Bender - 3/8" 3

Tubing Bender - 1/2" 3Tubing Bender - 3/4" 3

2 Tubing Cutter (Swagelok) c/w spare blade 33 Deburring Tool 34 Set of common ring spanner 3g p

5 36 Cable cutter (shell) 37 Electrical knife c/w spare blade 38 Measuring tape 7.5 meter 39 Monkey plier 310 Set of allan key - imperial 311 Set of allan key - metric 3

Combination plier

y12 Adjustable spanner - 4 inci 313 Adjustable spanner - 12 inch 3

Adjustable spanner - 8 inch 314 315 Mini hand saw c/w spare blade 316 Crimping tool ( for 1.25mm to 16mm cable lug) 317 Wire cutter 3

Hand saw c/w spare blade

17 Wire cutter 318 Test pen (heavy duty) 319 Square 12 inch 320 Water level 200mm 321 Pipe wrench - 6 inch 3

Pipe wrench - 10 inch 322 Set of screw driver 323 Termination screw driver 323 Termination screw driver 324 Long nose plier - 6 inch 325 Drill bit (complete set) 326 Hole cut 40 mm 327 Dead Weight tester 0-10 000psig 328 Wellace and Teiman or equiv, pneumatic test set 329 0-30VDC Variable power supply 3

RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS

LIST OF EQUIPMENT & WORKSHOP FACILITIES

NO QTY NO DESCRIPTION1 Ginding Machine 4 16 Hydraulic cable crimp c/w 1

2 Air Compressor 180 cfm 1 accessories - 800mcm3 Diesel Diven welding Machine 2 17 Multimeter - Fluke 787 processmeter 44 Eletrade Oven 2 18 Cable core meter printer c/w acc 2

DESCRIPTION QTY

LIST OF EQUIPMENT

5 Loop Check Calibrator 1 19 Portable hand pump 16 Digital Multimeter 1 20 Grinder 4 inc c/w spare blade & disc 27 Smart Communicator 1 21 Hand Drill 28 Temperature Simulator 1 22 Druck calibrator 20 bar (inds std) 19 Portable Compressor 1 23 Hart 275 (rosemount) 110 Mega Tester 1 24 Battery 6V x 4ea@sourse 24 volt 211 Chain Block 2-3 Tonne 4 25 Pneumatic Hand Drill 212 Cutting Machine 2 26 Pneumatic Grinder 413 Hot Air Blower 2 27 Analogue Earth Tester M 4102A 114 Digital Clamp Meter 1 28 Digital RCCB ( ELCB) Tester 115 87V True RMS Multimeter 1 29 Electronic Lettering Machine 1

RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS

LICENCE LICENCE

RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS

LICENCE

RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS

LICENCE

RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS

LICENCE

RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS

LICENCE LICENCE

RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS

LICENCE

RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS

LICENCE

RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS

LICENCE

RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS RHS

Recommended