View
9
Download
0
Category
Preview:
Citation preview
ACROSS THE PACIFIC
WE BUILD A GREATER BRIDGE TOA BETTER FUTURE
BETWEEN ASIA
STARTING AT
AND LATIN AMERICA
SINGAPORE
WE ARE ALL ABOUT
Strengthening ties
Growing investments
Connecting effectively
Creating opportunities
TABATINGA & PARTNERS WILL
Operate / Maintain / Administer the Project
Undertake Engineering
Manage the procurement
Fund the project
Develop the project01
02
03
04
05
FINANCING AND INVESTMENT
viable and sustainable investment opportunities.
We seek to unite best financing with high quality,
OUR SERVICES
Acquisitions and divestments
Pitch DeckTeaser
Financial Models Investor & Supplier Negotiations
Investment Banking + CorporateAdvisory Services
Project Definition
Transaction structuring and arrangement(debt, equity and hybrids)
Seed and early stage fundingthrough to listing on an
Investor driven Stock Exchange
Information Memorandums
WIND ENERGY
With its relatively low population density, long distances and energy needs in remote locations, Latin America offers an ideal
environment to take advantage of wind energy.
Colombia, and other Latin American countries have startedeolic energy projects. The region has enormous potential.
WIND POWER POTENTIAL MAP
֍
https://globalwindatlas.info
HYDROELECTRIC ENERGY
Hydropower is more than half of the electricity in Latin America.
High rainfall levels in the mountains, forests, highlands and valleys facilitate
the construction of dams and reservoirs.
HYDROELECTRIC ENERGY
Colombia •Rainfall: 1500 - 4000 mm/year •Installed capacity: ≈17.3 GW
(68% is hydraulic).
Latin America•Has 20% of the world's capacity to produce hydropower•Has only developed 20% to 25% of its potential•About 30 million people do not have access to this service.
SOLAR ENERGY
This market has grown 25% per annum and is projected to increase.
The World Bank forecasts that power demand in Latin America will double between 2008 and 2030, reaching 2,500
TWh. This implies the need for an additional 239 GW in the region approaching 330 GW of installed capacity.
Our investors bring experience in design, construction and operation of solar generation assets and financial strength. With realistic return expectations.
Our investors seek to invest their capital in social and environmental projects, which are RESPONSIBLE and SUSTAINABLE.
TABATINGA SOLAR ENERGY
We make sure that the projects we offer investors are “construction ready” or near, with penal clauses included in the contracts.It is vital to support the debt protection of assets with insurance for late delivery.
In recent years, a rapid and significant decrease in costs has been observed, particularly in investment modules.
TABATINGA SOLAR ENERGY
PDP
• Project Development Planning
• Advice on solar radiation, grid network, capacity, etc.
SPV
• Special Purpose Vehicle
• We can help build the company and find the right shareholders
EPC
• Engineering, Procurement and Construction
• Advice on the optimal equipment, logistics and planning
PF
• Project Funding
• Provide the most suitable investors with the best rates
EMC
• Energy Management Contract
• Help negotiate the best price, whether it’s EMC or PPA
O&M
• Operation and Management
• Contribute through board meetings or as external advisers
TABATINGA SOLAR ENERGYWE HELP
YOU EVERY STEP OF THE
WAY
HIGHEST SOLAR RADIATION
Our viability analysis
verifies the land,
quality of the solar
resource, topography,
temperature, wind
speed, precipitation,
dust, pollution, etc.
https://globalsolaratlas.info/
In Colombia, the effect
of solar energy lasts up
to 12 hours a day,
registering some of
the highest
rates worldwide.
NATIONAL ENERGY GRID
We analyse: 1. The proposed technology; modules,
inverters, transformers, assembly systems, etc.
2. Available transmission infrastructure; access, distance, loss and capacity.
3. Licensing permits and contracts for the land use.
4. Environmental and social impact of its mitigators.
5. Offtaker(s) 6. Pricing
Case study Colombia
https://www.geni.org/globalenergy/library/national_energy_grid/colombia/index.shtml
Main features- High certified resistance to wind
- Perfect self-cleaning capacity of modules- Smart-looking cells and modules- Excellent performance- High resistance to salt spray and ammonia
TABATINGA SOLAR ENERGYWe guarantee the solar panels comply with Colombian regulations
Our solar panels comply with RETIE regulations for: The protection of life and human health, the
protection of animal and plant life, the preservation of the environment and the
prevention of practices that may mislead the user
WE HAVE SUCCESS STORIES IN
Colombia •Rainfall: 1500 - 4000 mm/year •Installed capacity: ≈17.3 GW
(68% is hydraulic).
Successful stories from our investors and allies
ALLIES & PARTNERS SUCCESS STORIES
ARGENTINA Cauchari solar plant La PunaSusques/Jujuy
300 MW expanding to 500 MW-1.2 million solar panels - The largest in Latin America - It ill be one of the largest in the world
NIGER Gourou Banda solar plantCommune V,Niamey
Maximum capacity 20MW-Will provide energy for 3 cities in Niger
KENYAGarissa solar plantGarissa District,Garissa
55 MW-85 ha; 200,200 solar panels-Construction period: 2017 - 2018 -Is the largest solar station in East and Central Africa -Is Kenya’s first utility scale solar project.
PAKISTAN/CHINA BORDER Quaid-e-Azam Solar Park Bahawalpu, Punjab
900 MW -2,600 ha-402,560 solar modules-Construction period: 2014 - 2015
ALLIES & PARTNERS SUCCESS STORIES
CHINA DunhuangPhotovoltaic Power Plant Gansu, China
CHINAQingtongxia Photovoltaic Power Station Ningxia
Phase-I 10MW Project and Phase—II 20 MW -Installed capacity: 30MW(10MW+20MW)-Construction period:2011—2011-Total planned capacity 100MW, annual generating capacity 36GWh
Installed capacity: 20MWConstruction period: 2009—2010The first large-scale photovoltaic grid-connection demonstrationproject in China
CHINASheyang
Photovoltaic Power Plant Jiangsu, China
Installed capacity:20MW Construction period:2010—2010 Holds the record for fastest-speed construction Total generating capacity/year > 30 GWh.
CHINA Shanxi YouyuPhotovoltaic Power PlantShanxi, China
Installed capacity: 20MWConstruction period: 2011—2012Realized complementary generation of wind/photovoltaic power
Sri Lanka
Vietnam
Colombia
Singapore
WE ARE DEVELOPING INVESTMENT & FINANCE PROJECTS IN
Myanmar
Coal-fired power plants in Australia and Colombia
Health Care – Aged care, pharmacy, child care Australia
“Green Power” Solar, Bio-mas, Wind, Gas
Mining in Australia, Indonesia, PNG, Fiji and Colombia
Agriculture: beef export, coffee, sugarmill operations requiring power
Thailand
Paul Raftery
Chairman
paul.raftery@tabatingasg.com
Phillip Blandorfd Conn
Non Executive Director
Phillip.conn@tabatingasg.com
Enrique Garcia Duperly
Legal Advice
Enrique.garcia@tabatingasg.com
OUR TEAM
Alejandro Hoyos Vallejo
Business Partner
alejandro.hoyos@tabatingasg.com
Jaime A. Fernández
Business Partner
Jaime.fernandez@tabatingasg.com
Mauricio Otoya
Senior Associate Projects
mauricio.otoya@tabatingasg.com
OUR TEAM
German Libreros Sanchez
Engineering & Technical Support
german.libreros@tabatingasg.com
Peter Martin
Commercial Representative Latin America
peter.martin@tabatingasg.com
Carmenza Hoyos
Managing Director
carmenza.hoyos@tabatingasg.com
OUR TEAM
THE GREATEST ATTRACTION FOR AN INVESTOR
THE GUARANTEE OF PROFITABILITY
www.tabatingasg.com
Our investors become partners of the projects
WE DONT PROMISE. WE DELIVER!
THANK YOU!
info@tabatingasg.comMobile: +6586481353
PROJECT INVESTMENT SPECIALISTS CONNECTING THE WORLD
Level 24, Tower 1One Raffles PlaceSingapore, 048616
DISCLAIMER
Not an Offer
This presentation does not constitute an offer, invitation, solicitation or recommendation in relation to the subscription, purchase or sale of any securities or financial products in anyjurisdiction. Nothing in this presentation will form the basis of any contract or commitment. It has been prepared and distributed only for the purpose of assessing the potential demand forthe transaction(s) set out in this presentation. Neither this document nor any financial products referred to herein have been registered or filed with or approved or disapproved by anyregulatory authority of any country or jurisdiction, nor has any regulatory authority endorsed the accuracy or adequacy of this document.
Indicative Only
The information contained in this presentation is indicative only and may change without notice. Except as otherwise provided by law, no representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions and conclusions, nor as to the reasonableness of any assumption, contained in this presentation. While the information provided in this presentation is based on information believed to be reliable, no guarantee is given that it is accurate or complete.
No Liability
By receiving this presentation, to the extent permitted by law, the Recipient releases Linchpin Capital and its related bodies corporate, associated entities and respective officers, employees, agents, associates and advisers from any liability (including, without limitation, in respect of direct, indirect or consequential loss or damage or loss or damage arising bynegligence) arising as a result of the reliance by the Recipient or any other person on anything contained in or omitted from this presentation. No action should be taken on the basis of, or in reliance on, this presentation. Nothing in this presentation constitutes investment, legal, taxation, financial product or other advice and it does not take into account the investmentobjectives, financial situation or particular needs of the Recipient who is entirely responsible for forming opinions and conclusions on these matters. The Recipient should make anindependent assessment of the information in this presentation, having regard to individual objectives, financial considerations and needs.
Strictly Confidential
By agreeing to view the following presentation, the Recipient expressly agrees to treat the proprietary commercial information and ideas contained herein as Confidential Information to keep it secure from unauthorized use, access, duplication, distribution or disclosure without express consent of TABATINGA SG.
Recommended