incorporates gas collection, storage and compressor system leachate collection, storage and...

Preview:

Citation preview

incorporates

gas collection, storage and compressor system

leachate collection, storage and treatment facilities.

prevent leachate leakage into ground water

gas leakage detection p robes.

leachate monitoring well and ground water monitoring well

Design & operation SLF Several important factors must be

considered:

land area cover material cell design and construction equipment requirement personnel requirement financedrainage

spread and compaction water supply fire prevention facilities fencing - gatehouse operation time land use after completion of

landfill wheel cleaning notice board

Population protection site location rainfall temperatureSoil type windHydrological properties and water

table

compaction landfill

essential to reduce settlement

take about 2 years

prevent fire

eliminates odour, flies & vermin

for building structure – 10 – 12 years

ideally compacted fill should have density of 900 – 950 kg/m3

densities are measure by using backhoe method and auger method.

the values depend on:

Type of waste

Pretreatment

Composting of waste

Time of landfill

Moisture content

Type of landfill

Stage of compaction

Leachate

define as liquid that has percolated through solid waste and has extracted Dissolved or suspended material

average amount of leachate generated is 150L//tonne

contain organic matter, nitrogen (ammoniacal), suspended solid salts & colouring matter.

constration of eluted matters will be highest the first 3 – 8 years.

quantity of leachate produced depend on factors:

Soil type

Waste composition

Degree of composition

Rainfall

Evaporation

Landfill type and age

incorporates

gas collection, storage and compressor system

leachate collection, storage and treatment facilities.

prevent leachate leakage into ground water

gas leakage detection p robes.

leachate monitoring well and ground water monitoring well

Design & operation SLF Several important factors must be

considered:

land area cover material cell design and construction equipment requirement personnel requirement financedrainage

spread and compaction water supply fire prevention facilities fencing - gatehouse operation time land use after completion of

landfill wheel cleaning notice board

Population protection site location rainfall temperatureSoil type windHydrological properties and water

table

compaction landfill

essential to reduce settlement

take about 2 years

prevent fire

eliminates odour, flies & vermin

for building structure – 10 – 12 years

ideally compacted fill should have density of 900 – 950 kg/m3

densities are measure by using backhoe method and auger method.

the values depend on:

Type of waste

Pretreatment

Composting of waste

Time of landfill

Moisture content

Type of landfill

Stage of compaction

Leachate

define as liquid that has percolated through solid waste and has extracted Dissolved or suspended material

average amount of leachate generated is 150L//tonne

contain organic matter, nitrogen (ammoniacal), suspended solid salts & colouring matter.

constration of eluted matters will be highest the first 3 – 8 years.

quantity of leachate produced depend on factors:

Soil type

Waste composition

Degree of composition

Rainfall

Evaporation

Landfill type and age