Process Layout
Chapter 8Chapter 8
© 2007 Pearson Education
Designing Line-Flow Layouts
Line balancing is the assignment of work to stations in a line so as to achieve the desired output rate with the smallest number of workstations.
Work elements are the smallest units of work that can be performed independently.
Immediate predecessors are work elements that must be done before the next element can begin.
Precedence diagram allows one to visualize immediate predecessors better; work elements are denoted by circles, with the time required to perform the work shown below each circle.
© 2007 Pearson Education
Line Balancing Example 8.3Example 8.3
Green Grass, Inc., a manufacturer of lawn & garden equipment, is designing an assembly line to produce a new fertilizer spreader, the Big Broadcaster. Using the following information, construct a precedence diagram for the Big Broadcaster.
© 2007 Pearson Education© 2007 Pearson Education
Line Balancing Green Grass, Inc.Green Grass, Inc.
66
E2020
H
1818
I
4040
D
3030
B
2525
F
5050
C4040
A
1515
G
AA Bolt leg frame to hopperBolt leg frame to hopper 4040 NoneNoneBB Insert impeller shaftInsert impeller shaft 30 30 AACC Attach axleAttach axle 5050 AADD Attach agitatorAttach agitator 4040 BBEE Attach drive wheelAttach drive wheel 66 BBFF Attach free wheelAttach free wheel 2525 CCGG Mount lower postMount lower post 1515 CCHH Attach controlsAttach controls 2020 D, ED, EII Mount nameplateMount nameplate 1818 F, GF, G
TotalTotal 244244
WorkWork Time Time Immediate ImmediateElementElement DescriptionDescription (sec) (sec) Predecessor(s) Predecessor(s)
© 2007 Pearson Education
Desired Output and Cycle Time
Desired output rate, r must be matched to the staffing or production plan.
Cycle time, c is the maximum time allowed for work on a unit at each station: 1
rc =
© 2007 Pearson Education
Theoretical Minimum
Theoretical minimum (TM ) is a benchmark or goal for the smallest number of stations possible, where total time required to assemble each unit (the sum of all work-element standard times) is divided by the cycle time. It must be rounded up
Idle time is the total unproductive time for all stations in the assembly of each unit.
Efficiency (%) is the ratio of productive time to total time.
Balance Delay is the amount by which efficiency falls short of 100%.
© 2007 Pearson Education
Output Rate and Cycle TimeExample 8.4
Green Grass, Inc. Desired output rate, r = 2400/week Plant operates 40 hours/week r = 2400/40 = 60 units/hour
Cycle time, c = 1/60
= 1 minute/unit
= 60 seconds/unit
1
r
© 2007 Pearson Education
Calculations for Example 8.4 continued
Theoretical minimum (TM ) - sum of all work-element standard times divided by the cycle time.
TM = 244 seconds/60 seconds = 4.067 It must be rounded up to 5 stations
Cycle time: c = 1/60 = 1 minute/unit = 60 seconds/unit
Efficiency (%) - ratio of productive time to total time.
Efficiency = [244/5(60)]100 = 81.3%
Balance Delay - amount by which efficiency falls short of 100%.
(100 − 81.3) = 18.7%
© 2007 Pearson Education
Line Balancingcc = 60 seconds/unit = 60 seconds/unitTM = 5 stationsTM = 5 stationsEfficiency = 81.3%Efficiency = 81.3%
S1
S2S3
40
66
2020
50
1515
1818
E30
25
4040H
I
D
B
FC
A
G
S1 A A 40 20
S2 B,C C 50 10
S3 B,F,G B 30 30D,E,F,G F 55 5
S4 D,E,G D 40 20E,G G 55 5
S5 E,I I 18 42E E 24 36H H 44 16
Cumm IdleStation Candidate Choice Time Time
Green Grace, Inc.Green Grace, Inc.
© 2007 Pearson Education© 2007 Pearson Education
S1
S2S3
S5S4 66
E2020
H
1818
I
4040
D
3030
B
2525
F
5050
C4040
A
1515
G
Green Grass, Inc. Green Grass, Inc. Line Balancing SolutionLine Balancing Solution
cc = 60 seconds/unit = 60 seconds/unitTM = 5 stationsTM = 5 stationsEfficiency = 81.3%Efficiency = 81.3%
The goal is to cluster the work elements into 5 workstations so that the number of work-stations is minimized, and the cycle time of 60 seconds is not violated. Here we use the trial-and-error method to find a solution, although commercial software packages are also available.
© 2007 Pearson Education
Line Balancing
cc = 60 seconds/unit = 60 seconds/unitTM = 5 stationsTM = 5 stationsEfficiency = 81.3%Efficiency = 81.3%Production = 2400Production = 2400
S2S3
S1 A 40 20S2 C 50 10S3 B,F 55 5S4 D,G 55 5S5 E,H,I 44 16
Work Work Station Work stationStation Elements Time Idle Time
Line CapacityLine CapacityFastest cycle time Fastest cycle time = 55 seconds/unit= 55 seconds/unitProduction = (40 hours x 60 minutes/hr x 60 seconds/hr)/55 = Production = (40 hours x 60 minutes/hr x 60 seconds/hr)/55 = 26182618Efficiency at capacity = 244/(5x55) = .887 = 88.7%Efficiency at capacity = 244/(5x55) = .887 = 88.7%
Green Grace, Inc.Green Grace, Inc.
© 2007 Pearson Education
Other Considerations
In addition to balancing a line, managers must also consider four other options:
1. Pacing: The movement of product from one station to the next as soon as the cycle time has elapsed.
2. Behavioral factors of workers.3. Number of models produced: A mixed-model line
produces several items belonging to the same family.
4. Cycle times depend on the desired output rate, and efficiency varies considerably with the cycle time selected. Thus exploring a range of cycle times makes sense.
© 2007 Pearson Education
Solved Problem 2Precedence Diagram
2020
E
145145
H
130130
I
2525
D
8080
B
1515
F
5050
C
4040
A
120120
G115115
J
Recommended