Station design is one of the most exciting -- and most critical -- components of The Crosstown construction. There are a number of major considerations for station design, including: accessibility for people with disabilities, development potential, integration with surrounding communities, and minimizing construction impacts. This is the preliminary station design consultation for Dufferin. Visit www.thecrosstown.ca for more information.
Citation preview
Dufferin Station
Preliminary Design
Display Panels
1/25/2012
Open House#1 – January 25, 2012
Welcome to the Dufferin Station
Preliminary Design Open House
Please sign-in so that we may provide
you with updates on future events.
1/25/2012 2
Dufferin Station Preliminary Design
Part 1Part 1Part 1Part 1
•Introduction•Introduction•Introduction•Introduction
••••CrosstownCrosstownCrosstownCrosstown UpdateUpdateUpdateUpdate
•Station Design 101 •Station Design 101 •Station Design 101 •Station Design 101 ---- Design PrinciplesDesign PrinciplesDesign PrinciplesDesign Principles
Part 2Part 2Part 2Part 2
••••DufferinDufferinDufferinDufferin Station Preliminary Design Station Preliminary Design Station Preliminary Design Station Preliminary Design
Open House Overview
1/25/2012 3
3
••••DufferinDufferinDufferinDufferin Station Preliminary Design Station Preliminary Design Station Preliminary Design Station Preliminary Design
****Our partners in City Planning are here if you have questions Our partners in City Planning are here if you have questions Our partners in City Planning are here if you have questions Our partners in City Planning are here if you have questions
about existing development applications at about existing development applications at about existing development applications at about existing development applications at DufferinDufferinDufferinDufferin or the or the or the or the
future Land Use Study around future Land Use Study around future Land Use Study around future Land Use Study around CrosstownCrosstownCrosstownCrosstown StationsStationsStationsStations
Dufferin Station Preliminary Design
The Purpose of Tonight’s Open House The Purpose of Tonight’s Open House The Purpose of Tonight’s Open House The Purpose of Tonight’s Open House
• Provide a brief Crosstown project update
• Present the Crosstown station design philosophy
• Explain the anatomy of a station and challenges
• Display the preliminary design of Dufferin Station
Most importantly: Most importantly: Most importantly: Most importantly:
*Get your input on the *Get your input on the *Get your input on the *Get your input on the PreliminaryPreliminaryPreliminaryPreliminary Design early in this Design early in this Design early in this Design early in this
1/25/2012 4
*Get your input on the *Get your input on the *Get your input on the *Get your input on the PreliminaryPreliminaryPreliminaryPreliminary Design early in this Design early in this Design early in this Design early in this
process. process. process. process.
• Architectural Station design will be prepared for Open House #2 in
Spring 2012. Significant outreach will follow on construction.
Dufferin Station Preliminary Design
Open House #1 - Jan 25, 2012
Online Consultation - Jan 25 to Feb 10, 2012
Open House #2 - Spring, 2012•Response to Open House #1 input
•Architectural Treatments
•Final Station Design Open House
Open House #3 - Fall 2012
Dufferin Station Design Process
1/25/2012 5
Open House #3 - Fall 2012• Construction staging Ongoing Outreach on Construction
Tunnelling (Head walls at Tunnelling (Head walls at Tunnelling (Head walls at Tunnelling (Head walls at DufferinDufferinDufferinDufferin station box) station box) station box) station box) End 2012 – 2013 (TBD)
Dufferin Station construction - 2014 (TBD)
Dufferin Station Preliminary Design
Format for Feedback
• Please speak with the project team at the displays, we’re here
to answer your questions
• There are tables to write comments and for group discussions
• Please submit a feedback form tonight if possible , or send us
comments
via e-mail, mail, or online at www.thecrosstown.ca by February
1/25/2012 6
via e-mail, mail, or online at www.thecrosstown.ca by February
10, 2012
• A consultation report to inform the designers will be posted
online at: www.thecrosstown.ca
Dufferin Station Preliminary Design
Presentation Part 1:
Crosstown Overview &
Construction Update
1/25/2012 7
Dufferin Station Preliminary Design
1/25/2012 8
The Crosstown* Final number and location of stations subject to review
Dufferin Station Preliminary Design
1/25/2012 9
Congestion Today
9Dufferin Station Preliminary Design
1/25/2012 10
The Eglinton-Scarborough Crosstown Plan
• $8.4 billion transit investment from the Province of Ontario
through Metrolinx
• 25 km east-west transit corridor between Black Creek Drive and
Scarborough Centre
• 60% faster than bus service today (e.g. only 15 minutes from
Keele to Yonge) Keele to Yonge)
• 19 km underground tunnel (Black Creek Drive to Kennedy
Station)*
• 6km seamless service will replace the SRT from Kennedy Station
to Scarborough Centre
• Up to 26 stations
• *Exact alignment west of Keele Street and east of Laird Drive TBD
Dufferin Station Preliminary Design
1/25/2012 11
Crosstown Construction Update
� Crosstown tunnel preparation work
at Black Creek and Eglinton in
Keelesdale Park
� Piling rigs are building concrete
support walls for the future tunnel
launch shaft
� The shaft will enable tunnelling � The shaft will enable tunnelling
eastward in summer 2012
� Soil testing for the tunnel and
stations continues from Keele Street
to Kennedy Station in Scarborough
Dufferin Station Preliminary Design
Conceptual Design of a Crosstown Station
1/25/2012 12
Urban Design and Architectural
Guidelines have been developed:
• ensure positive change along the
corridor
• guide individual station designs
and achieve consistency
• guide configuration of surface
elements
• integrate surface elements with
existing and future development
Dufferin Station Preliminary Design
Stations 101
What’s needed to make a Station Work?
1/25/2012 13
• Main Entrance
• Secondary Entrance
• Passenger Transportation (elevators, escalators)
• Mechanical and Electrical Systems
• Ventilation Shafts and Ventilation Fan Rooms
• Traction Power Substations
Dufferin Station Preliminary Design
Guiding Principle:
Consolidate Surface Elements to enhance design &
minimize impacts
• Reduce construction impacts (traffic, staging area, noise, dust )
• Preserve public space and development potential
• Save $
• Integrate with surrounding neighbourhood
• Safe and enjoyable user experience
• Full accessibility
• Preserve space for future re-development
• Enhance the local “sense of place”
Design Philosophy
1/25/2012 14
Accessibility for all users
14
• Enhance the local “sense of place”
• Long-term sustainability
• Reduce Construction Footprint & Impacts
• Reduce Costs
Compatible scale
Accessibility for all users
Dufferin Station Preliminary Design
Accessibility Principles & Features
• Access for persons with all levels of mobility
• Elevators
• Escalators
• Low-Floor Access
1/25/2012 15
15
• Low-Floor Access
Dufferin Station Preliminary Design
Safety and Security Features
• Monitored CCTV Security Cameras
• Urban Braille
• High Quality Lighting
1/25/2012 16
16Dufferin Station Preliminary Design
1/25/2012 17
Public Realm Elements
• Streetscape & integration
of Public Realm Elements
• Wayfinding
• Bicycle Facilities
Elements to be determined
and considered:
Dufferin Station Preliminary Design
• Bicycle Facilities
Architectural Design Approach
• Excellence in architectural/urban design treatments
• Cost effective and maintainable structures
• Standard station box configurations
• Creative use of materials, color,
1/25/2012 18
• Creative use of materials, color, textures, artwork, light
• Brand identification with graphics
• Use standard elements whenever
possibleEglinton West Station
Dufferin Station Preliminary Design
Surface Elements
Guiding Principles
• Surface elements are
most visible to public
• Integrate into local
community
• Minimize property
implications
1/25/2012 19
implications
• High quality design
• Major focus on
consolidating:
– Entrances
– Vent Shafts
– Substations
Dufferin Station Preliminary Design
� Any architectural finish can contain integrated artwork, including:
� walls
� floors
� ceilings
� glazing
Integrated Artwork
1/25/2012 20
� glazing
Dufferin Station Preliminary Design
Traction Power Substations
What and Why?
• Required to provide power to the station
system
• Every two kilometres, at stations
• Many different configurations Toronto Hydro Substation in Scarborough
1/25/2012 21
• Many different configurations
• Above ground, surface, below-ground
• Guidelines to integrate substations
Leslie Station
Toronto Hydro Substation in Scarborough
Dufferin Station Preliminary Design
Presentation Part 2:
Dufferin Station
1/25/2012 22
22Dufferin Station Preliminary Design
Dufferin Station
Preliminary Design
Preliminary Design by:
Crosstown Consortium
IBI Group
1/25/2012 23
IBI Group
SNC Lavalin
Lea Consulting Limited
Dufferin Station Preliminary Design
Dufferin Station
Local Context
1/25/2012 24
Crosstown Line
Dufferin Station Preliminary Design
Population Density within a 10 minute walk to Dufferin Station
Barrie GO Transit
Dufferin Station
Existing Uses
1/25/2012 25
Dufferin Station Preliminary Design
Dufferin StationFuture Transit & Existing Bus Stops
1/25/2012 26
CROSSTOWN
Dufferin Station Preliminary Design
1/25/2012 27
Dufferin StationBike Routes
Improved bike connections
to be identified
Dufferin Station Preliminary Design
Dufferin Station
Local ContextFairbank Village and York-Eglinton BIAs
1/25/2012 28
•www.fairbankvillagebia.com
•Chamberlain Avenue to Dufferin Street
www.yorkbia.com
•Dufferin Street to Winona Drive/Marlee Avenue
Dufferin Station Preliminary Design
1/25/2012 29
Dufferin Station
2010 Environmental Assessment
Dufferin Station Preliminary Design
DUFFERIN STREET
Secondary
Entrance
Dufferin Station
Station Entrances - 2012
1/25/2012 30
EGLINTON AVENUE WEST UNDERGROUND STATION BOX
Main Entrance
Dufferin Station Preliminary Design
Dufferin Station
Main Entrance & Station Support - 2012
1/25/2012 31
Dufferin Station Preliminary Design
Dufferin Station
Green Roof Plan - 2012EGLINTON AVENUE WEST
DUFFERIN STREET
1/25/2012 32
DUFFERIN STREET
Dufferin Station Preliminary Design
Dufferin Station
Preliminary Design Concept - 2012
1/25/2012 33
Dufferin Station Preliminary Design
Entrances
Substation
Vents
1/25/2012 34
Dufferin Station
New Consolidated Layout
Key Advantages
� Improves look and feel from street for community
� Reduces number of properties affected
Dufferin Station Preliminary Design
� Reduces number of properties affected
� Preserves potential for investment and development
� Reduces construction footprint, cost & impacts
(station box shortened by 40 metres)
Dufferin Station
Passenger Circulation - 2012
LOOKING SOUTH
1/25/2012 35
Dufferin Station Preliminary Design
Dufferin Station
Station Daylighting - 2012
LOOKING SOUTH
1/25/2012 36
Dufferin Station Preliminary Design
1/25/2012 37
Dufferin Station
Main Entrance & Station Support Building
EXISTING FUTURE
Dufferin Station Preliminary Design
SOUTHEAST CORNER OF DUFFERIN AND EGLINTON (GAS STATION)
Dufferin Station
Station Support Building
1/25/2012 38
EXISTING FUTURE
Dufferin Station Preliminary Design
SOUTHWEST CORNER OF DUFFERIN AND EGLINTON
Dufferin Station
Secondary Entrance Location
EXISTING FUTURE
1/25/2012 39
NORTHWEST CORNER OF DUFFERIN AND EGLINTON
Dufferin Station Preliminary Design
Dufferin Station
Underground Station Section
1/25/2012 40
Dufferin Station Preliminary Design
Dufferin Station
St. Hilda’s ParkImportant opportunity to Enhance St. Hilda’s ParkPlease let us know what improvements are most important to
you. Please fill in our questionnaire which includes questions on
potential park improvements.
1/25/2012 41
Dufferin Station Preliminary Design
Dufferin Station
Community Outreach for Construction
• At this early design stage, construction staging is not yet
developed
• Comprehensive Construction Management Plan &
1/25/2012 42
• Comprehensive Construction Management Plan &
individual construction plans for each station will be
developed with local consultation before construction
• Please contact us any time with questions you may
have about construction
Dufferin Station Preliminary Design
1/25/2012 43
The Crosstown Team
Please Get in Touch with Us!
Community Office Hours — 2012
Monday, Wednesday, Friday:
9:00 a.m. – 5:00 p.m.
Tuesday: 8:00 a.m. – 4:00 p.m.
Devin Horne, Franca Di Giovanni,
Denise Jayawardene
E-mail: eglintontransit@ttc.ca
Online: www.thecrosstown.ca
Tel: 416-338-6310
Fax: 416-397-8193
Dufferin Station Preliminary Design
Tuesday: 8:00 a.m. – 4:00 p.m.
Thursday: 12:00 p.m. – 8:00 p.m.Fax: 416-397-8193
TTY: 416-481-2523
Visit our West Community Office at
1848 Eglinton Avenue West
(at Dufferin)