Steve Slepcevic Paramount Disaster Recovery

Preview:

DESCRIPTION

Paramount Disaster Recovery is located in the county of Los Angeles. It is associated with following industry(s): Single-family Housing Construction - Repairing Fire Damage, Single-family Houses, Industrial Buildings And Warehouses - Industrial Buildings And Warehouses, Business Services - Estimating Service, Construction. Products and Services associated with Paramount Disaster Recovery include Fire.

Citation preview

Paramount Disaster Recovery, Inc. www.paramountinc.com

(800) 798-5025

24 Emergency Dispatch

Steve Slepcevic President and CEO

When Disaster Strikes… Will YOU Make A Difference?

Emergency Service Response Team

Construction Consulting Team

General Construction Service Team

1

23

Preparing Before Disaster Strikes…

Awareness, Table top, Simulation,Mock Disaster Drill - All Hazards.Current office space plans –Safe Evacuation Planning.Employee Tracking System.Hazmat – All Chemical Clearance.

Emergency Service Response Team1

By Floor

By Building

Emergency notification systems.Satellite, Radio, Text, Web.Emergency mitigation plans. Federal, State, Local, Fire Dept.Alternate site with duplicated systems.Consider disruption of transportation.

Emergency Service Response Team1

Emergency Service Response Team 1

Preparing Your Facilities

Preparing Your Facilities

Preparing Your Facilities

24/7- Response Time - Capabilities.Facilities review and access.MSA Contract = Priority Service

Emergency Response Vendors

Activating The Plan

Beginning the Process

Don’t panic! Assess The Damage, Manage it or…Emergency response team and Vendor notification.Control access, set command post, signed waivers.Videotape, photograph – preserve the evidence. Public relations single spokesperson.

Qualifying Your Emergency Response Vendor

Emergency Mitigation Plan & Timeline, Unit Pricing, Monitoring Logs, Video/Photography DocumentationStructural Engineers, Hygienists and ExpertsLicenses, Insurance and Disaster QualificationsDocumentation for Insurance ReimbursementBarcode System for Content Inventory and Storage

Improper Emergency Service 30 days vs 120 days

Avoid Further Liability

Matter of Life and Death

Deconstruction Impact

Planning

Preparation Checklist

Insurance Preferred. Burden of proof lies on the property owner or hired representatives.Hire Only The Best.

General Contractors

Cosmetic vs Structural.

Exploratory Forensics

Exploratory Forensics

Exploratory Forensics

Smoke Contamination• Course particles

– Up to 10 (µm) in diameter (PM10 )

• Fine particles – Smaller than 2.5 µm

diameter (PM2.5 )

Hair cross section = ~ 60 µm

Exploratory Forensics

Exploratory Forensics

Emergency Service Response Team 1Construction Consulting Team 2

Reconstruction Process

General Construction Service Team 3

Contractor ChecklistSteps to take:

Check license qualifications and references on all companies.Certificate of insurance and review vendor’s policies.Architect and Roofing Consultants.

Awarding The ContractFinal Steps:

Property Damage Scope and Costs of Repair Report. Contract to Include Percentage Draw Schedule and Completion Timeline.Lien Releases and Warranty Paperwork.

Moving Back in…

Steps to take:Inspect all systems thoroughly, collect all releases and guarantees prior to issuing final payments.Media reopening, we’re back and better!