SEMINAR ON “PRE ENGINEERED BUILDINGS”
Concept , Design &Construction
BY- BahadurGuide- Mukesh Bhavsar
INTRODUCTION
Pre-Engineered Buildings can be adapted to suit a wide variety of structural applications, the greatest economy will be realized when utilizing standard details. An efficiently designed Pre-Engineered Building can be lighter that the conventional steel buildings by up to 30%.
Tailor made building based on client’s requirement & actual design calculations using tapered sections.
Designing and casting is done in factory, building components are brought to site then fixed/jointed at the site. All connections are bolted.
These are the structures basically produced at the factory with high tensile steel material by collecting complete information of the shed/building (viz; Length, Width, Height etc,).
The entire design of column, rafters and other accessories is based on International structural standards and involve high technical welding and quality production.
Video- How drawing is drawn using STRUCAD?
Insulation (PEBI) Uniformly textured inorganic glass fibers bonded together
by a non-water soluble and fire-retardant thermosetting resin. It is free from coarse fibers and shot due to its mineral composition.
PEBI is non-toxic and not hazardous to health.
Design Criteria DESIGN METHOD: Allowable stress design method is
used as per the AISC specifications.
DEFLECTIONS: Unless otherwise specified, the deflections will go to MBMA, AISC criteria and standard industry practices.
PRIMARY FRAMING: Moment resisting frames with pinned or fixed bases.
SECONDARY FRAMING: Cold formed Z sections or C sections for purlins or girts designed as continuous beams spanning over rafters and columns with laps.
LONGITUDANAL STABILITY: Wind load on building end walls is transferred through roof purlins to braced bays and carried to the foundations through diagonal bracing.
DESIGN SOFTWARE
The latest software that is used for design is STAAD 2007.
ERECTION SYSTEMERECTION SYSTEM
Preparation for ErectionPreparation for Erection1.1. Pre Erection checksPre Erection checks2.2. Receiving Materials at siteReceiving Materials at site3.3. Unloading ContainersUnloading Containers
Erection of the FramingErection of the Framing1.1. Preparation of the First BayPreparation of the First Bay2.2. Main framesMain frames3.3. Mezzanine floorsMezzanine floors4.4. Crane BeamsCrane Beams
Sheeting & TrimmingSheeting & Trimming
Sheeting preparationSheeting preparation
Sheeting the wallsSheeting the walls
Sheeting the roofsSheeting the roofs
Miscellaneous trimmingsMiscellaneous trimmings
FasciaFascia
Self weight Self weight
30% lighter30% lighter Primary Member is Primary Member is
tapered sectiontapered section Secondary members Secondary members
are light weight rolled are light weight rolled framed “Z” and “C” framed “Z” and “C” sectionsection
Self weightSelf weight
More heavyMore heavy Primary members are Primary members are
Hot rolled “I” sectionHot rolled “I” section Secondary members are Secondary members are
“I” or “C” section “I” or “C” section which are heavy in which are heavy in weight.weight.
Delivery – average 6 to 8 Delivery – average 6 to 8 weeksweeks
Foundation-simple design, Foundation-simple design, easy to construct & light easy to construct & light wt.wt.
Erection cost and time- Erection cost and time- accurately knownaccurately known
Delivery- average 20 to Delivery- average 20 to 26 weeks26 weeks
Foundation- expensive, Foundation- expensive, heavy foundation heavy foundation required.required.
Erection cost and time- Erection cost and time- 20% more than PEB20% more than PEB
Overall price -30%lowerOverall price -30%lower Architecture-achieved at Architecture-achieved at
low costlow cost Erection process is easy, Erection process is easy,
fast, step by stepfast, step by step
Overall price - Higher Overall price - Higher price per square meter.price per square meter.
Architecture- achieved at Architecture- achieved at higher costhigher cost
Erection process is slow Erection process is slow and extensive field labor and extensive field labor is required.is required.
PRE ENGINEERED BUILDING vs CONCRETE BUILDINGS
APPLICATIONS
Industrial BuildingsIndustrial Buildings WarehousesWarehouses Commercial ComplexesCommercial Complexes ShowroomsShowrooms OfficesOffices SchoolsSchools Indoor StadiumsIndoor Stadiums Outdoor Stadiums with canopiesOutdoor Stadiums with canopies Gas StationsGas Stations Metro Stations, Bus Terminals, Parking LotsMetro Stations, Bus Terminals, Parking Lots Primary Health Centers, Angan wadi’sPrimary Health Centers, Angan wadi’s And many more…And many more…
Industrial Industrial BuildingBuilding
Parking lotsParking lots
Indoor StadiumsIndoor Stadiums
Railway StationRailway Station
Aircraft HangarsAircraft Hangars Metro StationMetro Station
Wear houseWear house High rise BuildingHigh rise Building
ADVANTAGES
Aesthetic AppealAesthetic Appeal Faster CompletionFaster Completion EconomicalEconomical Seismic ResistanceSeismic Resistance Ease of ExpansionEase of Expansion Maintenance FreeMaintenance Free Large Clear SpansLarge Clear Spans Controlled QualityControlled Quality
CONCLUSION
PEB concept has been very successful and well established in North America, Australia and is presently expanding in U.K and European countries. PEB construction is 30 to 40% faster than masonary construction. PEB buildings provide good insulation effect and would be highly suitable for a tropical country like India.
The pre-engineered building calls for very fast construction of buildings and with good aesthetic looks and quality construction. Pre-engineered Buildings can be used extensively for construction of industrial and residential buildings.
REFERENCES
Various websites from internet PEB project Vigyan Ashram, Pabal
Thank You!