CONTENTS
Document Register:
Rev Date Distribution Reason for Issue Issued By
Stonnington Draft for initial review CR
P1 18.09.2015 Stonnington Design Development Stage 1 MR
P2 19.10.2015 Stonnington DD Progress MR
P3 30.10.2015 Stonnington Design Development Sitewide MR
P4 04.12.2015 Stonnington Design Development MR
Prepared for the City of Stonnington by:
rush \ wright associates
Lvl 4, 105 Queen StreetMelbourne Vic Australia 3000tel +61.3.9600 4255fax +61.3.9600 4266email inbox@rushwright.comwww.rushwright.com
Disclaimer:While every reasonable effort has been made to ensure that this document is correct at the time of printing. RWA has relied on considerable third party information and disclaim any and all liability to any person in respect of anything or the consequences of anything done or omitted to be done in reliance upon the whole or any part of this document.
8 TREES AND PLANTING 63Key plant species selections Stage 1 Stage 2stage 3stage 4Stgae 5 Stage 6 9 LIGHTING DESIGN 79Lighting inspirations 9.1 Catenary Design (Webb Report), refer Appendix A9.2 Site wide lighting concepts (WGE report), refer Appendix B
10 LANDSCAPE 83Design Development Drawings, refer Appendix C
11 SERVICES DESIGN 85Civil, Electrical, Hyrdraulic Designrefer Appendix D and Appendix E
12 TRAFFIC DESIGN 87Traffic advice and reports, refer Appendix F
0 GREVILLE STREET PRECINCT - WHOLE OF SITE 3Overall plan Staging plan
1.0 STAGE 1: GRATTAN GARDENS 7Current plans and renders 2.0 STAGE 2: GREVILLE STREET SHARED ZONE 19Current plans and renders 3.0 STAGE 3: KING STREET CLOSURE 25Current plans and renders 4.0 STAGE 4: PORTER STREET SHARED ZONE 29Current plans and renders
5.0 STAGE 5: GREVILLE STREET IMPROVEMENTS 33 (EAST AND WEST) Current plans and renders
6.0 STAGE 6: PRAHRAN TOWN HALL FRONTAGE 39Current plans and renders
7 DESIGN ELEMENTS 437.1 City of Stonnington - Standard urban design palette 7.2 Ground Plane paving pattern design opportunities metal highlights7.3 Walls and edges 7.4 Furniture 7.5 Planters 7.6 Bicycle racks/ Bollard elements 7.7 Public Art Opportunities
2 City of Stonnington Greville Street PrecinctPublic Realm Design Design Development Report, October 2015. Revision [P2].
4Prepared for the City of Stonningtonby rush\wright associates
DESIGN DEVELOPMENT OVERALL PLAN
GREVILLE STREET PRECINCT : WHOLE OF SITE
GREVILLE STREET
CHATHAM STREET
GRATTANGARDENS
PRAHRAN TOWN HALL
PRAHRANSTATION
LEGGETTS LANE
PRINCES CLOSE
KING STREET
ST E
DM
ON
DS R
OAD
IZET
T ST
REET
CHAP
EL S
TREE
T
LT C
HAP
EL S
TREE
T
GRA
TTAN
STR
EET
PORT
ER S
TREE
T
5Prepared for the City of Stonningtonby rush\wright associates
STAGING PLAN
GREVILLE STREET PRECINCT : WHOLE OF SITE
STAGE 5
STAGE 3 KING STREET CLOSURE
STAGE 5B GREVILLE ST EAST IMPROVEMENTS
STAGE 1 GRATTAN GARDENS STAGE 5A
GREVILLE ST WEST IMPROVEMENTS
STAGE 2 GREVILLE ST SHARED ZONE AND IZETT STREET INTERSECTION
STAGE 4 PORTER STREET SHARED ZONE + COMMERCIAL ROAD SIGNALS PLUS TEMPORARY GREVILLE ST WEST ONE WAY INFRASTRUCTURE
STAGE 6 PRAHRAN TOWN HALL FORECOURT
8Prepared for the City of Stonningtonby rush\wright associates
DESIGN DEVELOPMENT CANOPY PLAN
STAGE 1: GRATTAN GARDENS STAGE 1: GRATTAN GARDENS
+EX 0.00
+RL 0.00
HARDSCAPE KEY
EXTENT OF WORKS
EXISTING KERB
ASPHALT PAVING
GRANITE PAVING - SHARED ZONE100 X 100 SETTS WITH COLOUR PATTERN
GRANITE PAVING - STEPS
STEEL TREE SURROUND
TACTILE GROUND SURFACE INDICATORS (TGSI)
EXISTING WALL TO RETAIN
ROUGH BASALT ROCKERY WALL
GLAZED BRICK PLANTER WALL
CONCRETE EDGE - FLUSH KERB
EXISTING KERB AND CHANNEL
OVERHEAD AWNING LINE
BICYCLE RACK
BENCH SEAT WITH BACK AND ARMRESTS
SEAT WALL: MULTICOLOUR GLAZED BRICK
RAISED PLANTER WITH SEATING
FEATURE SEAT / BUTTON BOLLARD
BOLLARD: STEEL CLAD CONCRETE THIMBLE
RECYCLING AND RUBBISH BIN SET
DRINKING FOUNTAIN
STRIP DRAIN
PROPOSED LIGHT POLE
EXISTING POLE WITH LIGHTING TO REMAIN
EXISTING POLE TO REMAIN WITH LIGHTING REMOVED
CATENARY SUPPORT POLE
BEACON: INFORMATION & WAYFINDING
EXISTING LEVEL
PROPOSED LEVEL
SOFTSCAPE KEY
EXISTING TREE TO BE RETAINED
EXISTING TREE TO BE TRANSPLANTED (PALM)
WSUD TREEPIT WITH UNDERPLANTING
LARGE PLANTER WITH SEMI-ADVANCED TREES & UNDERPLANTING
ADVANCED PALM PLANTING IN TURF / GARDEN BED
EXISTING GARDEN BED TO BE REPLANTED
NEW GARDEN BED
NEW TURF BED GREVILLE STREET
GRA
TTAN
STR
EET
9Prepared for the City of Stonningtonby rush\wright associates
DESIGN DEVELOPMENT PLAN - GROUNDPLANE
STAGE 1: GRATTAN GARDENS
GREVILLE STREET
GRA
TTAN
STR
EET
GREVILLE STREET
GREVILLE STREETSHARED ZONE
GREVILLE STREETFOOTPATH ANDTRADING ZONE
GRATTAN GARDENSFORECOURT
GRATTAN GARDENSGRASSED TERRACE
RESIDENTIAL LANEWAY
10Prepared for the City of Stonningtonby rush\wright associates
DESIGN DEVELOPMENT RENDER
STAGE 1: GRATTAN GARDENS STAGE 1: GRATTAN GARDENS
GRATTAN STREET
GREVILLE STREET
14Prepared for the City of Stonningtonby rush\wright associates
STAGE 1: GRATTAN GARDENS GLAZED BRICK WALLWITH BULLNOSE PROFILE
STEEL TREE SURROUND
GRATTAN GARDENS FORECOURT GRANITE SETTS IN 4 NEUTRAL GREY TONE COLOURSIN WOVEN PAVING PATTERN
EXISTING WATER FEATUREWITH STAINLESS STEEL GRATESTO BE RETAINED
15Prepared for the City of Stonningtonby rush\wright associates
STAGE 1: GRATTAN GARDENS CONCRETE PLANTER SEATCLAD IN PAINTED STEEL
EXISTING WATER FEATUREWITH STAINLESS STEEL GRATESTO BE RETAINED
GRATTAN GARDENS FORECOURT GRANITE SETTS IN 4 NEUTRAL GREY TONE COLOURSIN WOVEN PAVING PATTERN
GLAZED BRICK WALLWITH BULLNOSE PROFILE
CATENARY POLE WITHRIGGING FOR FUNCTIONAL LIGHTING AND EVENT INFRASTRUCTURE
16Prepared for the City of Stonningtonby rush\wright associates
STAGE 1: GRATTAN GARDENS GRASSED TERRACE & PATHSINCLINED EVENT LAWN
GRANITE STEPS WITHSTAINLESS STEEL HANDRAILS AND FEATURE LIGHTINGTO GRATTAN GARDENS FORECOURT
CATENARY POLE WITHRIGGING FOR FUNCTIONAL LIGHTING AND EVENT INFRASTRUCTURE
SEQUINED CATENARY WITH LED STUDDED MESH BORDERAT 8-METRE HEIGHT
BOTANICAL CATENARYWITH FLORAL HOUSING TO FEATURE LIGHTSAT 9.5-METRE HEIGHT
17Prepared for the City of Stonningtonby rush\wright associates
STAGE 1: GRATTAN GARDENS
NEW STREET TREE
WAYFINDING AND INFORMATION BEACON
EXISTING PERIMETER WALLS TO BE RETAINEDCLEAN DOWN AND REPAINT
CONCRETE BOLLARDCLAD IN TEXTUREDSTAINLESS STEEL
INTEGRATION WORKS:ASPHALT RAMP WITH RUBBER KERBS AND LINE MARKINGS
CATENARY POLE WITHRIGGING FOR FUNCTIONAL LIGHTING AND EVENT INFRASTRUCTURE
18Prepared for the City of Stonningtonby rush\wright associates
STAGE 1: GRATTAN GARDENS
NIGHT RENDER
CATENARY POLE WITHRIGGING FOR FUNCTIONAL LIGHTING
AND EVENT INFRASTRUCTURE
SEQUINED CATENARY WITH LED STUDDED MESH BORDERAT 8-METRE HEIGHT
BOTANICAL CATENARYWITH FLORAL HOUSING TO FEATURE LIGHTSAT 9.5-METRE HEIGHT
CONCRETE PLANTER SEATCLAD IN PAINTED STEEL
CONCRETE SEATCLAD IN PAINTED STEEL
STAINLESS STEEL BIKE RACK
20Prepared for the City of Stonningtonby rush\wright associates
STAGE 2: GREVILLE STREET SHARED ZONE
DESIGN DEVELOPMENT CANOPY PLANDESIGN DEVELOPMENT CANOPY PLAN
+EX 0.00
+RL 0.00
GREVILLE STREET
ST. E
DMO
NDS
ROAD
IZET
T ST
REET
GRA
TTAN
STR
EETHARDSCAPE KEY
EXTENT OF WORKS
EXISTING KERB
ASPHALT PAVING
GRANITE PAVING - SHARED ZONE100 X 100 SETTS WITH COLOUR PATTERN
BLUESTONE PAVING - FOOTPATH
VEHICULAR GRADE PERMEABLE PAVING
TACTILE GROUND SURFACE INDICATORS (TGSI)
EXISTING KERB AND CHANNEL
RAISED BLUESTONE KERB AND CHANNEL
BLUESTONE MOUNTABLE KERB
OVERHEAD AWNING LINE
BICYCLE RACK
BENCH SEAT WITH BACK AND ARMRESTS
RAISED PLANTER WITH SEATING
FEATURE SEAT / BUTTON BOLLARD
BOLLARD: STEEL CLAD CONCRETE THIMBLE
CIRCULAR BOLLARD
REMOVABLE BOLLARD
PEDESTRIAN BARRIER
RECYCLING AND RUBBISH BIN SET
DRINKING FOUNTAIN
STRIP DRAIN
PROPOSED LIGHT POLE
EXISTING POLE WITH LIGHTING TO REMAIN
EXISTING POLE TO REMAIN WITH LIGHTING REMOVED
CATENARY SUPPORT POLE
BEACON: INFORMATION & WAYFINDING
EXISTING LEVEL
PROPOSED LEVEL
SOFTSCAPE KEY
EXISTING TREE TO BE RETAINED
WSUD TREEPIT WITH UNDERPLANTING
21Prepared for the City of Stonningtonby rush\wright associates
STAGE 2: GREVILLE STREET SHARED ZONE
22Prepared for the City of Stonningtonby rush\wright associates
STAGE 2: GREVILLE STREET SHARED ZONE WSUD TREE PITWITH FLUSH KERB FOR OVERLAND FLOWAND INTERMITTENT RAISED KERB AS WHEEL STOP
BLUESTONE FOOTPATH AND TRADING ZONETO COUNCIL STANDARDS
PROPOSED STREET TREEIN FLUSH KERB OUTSTAND WITHINTERMITTENT RAISED KERB AS WHEEL STOP
CONCRETE PLANTER SEATCLAD IN PAINTED STEEL
GREVILLE STREET SHARED ZONEGRANITE SETTS IN 4 NEUTRAL GREY TONE COLOURSIN WOVEN PAVING PATTERN
23Prepared for the City of Stonningtonby rush\wright associates
STAGE 2: GREVILLE STREET SHARED ZONE CONCRETE PLANTER SEATCLAD IN PAINTED STEEL
CONCRETE SEATCLAD IN PAINTED STEEL
STAINLESS STEEL BIKE RACKSTEEL TREE SURROUNDWITH GRANITE PAVING BAND
CATENARY POLE WITHRIGGING FOR FUNCTIONAL LIGHTING AND EVENT INFRASTRUCTURE
26Prepared for the City of Stonningtonby rush\wright associates
STAGE 3: KING STREET CLOSURE
DESIGN DEVELOPMENT CANOPY PLAN
+EX 0.00
+RL 0.00
KING STREET
REFER KING STREEET SECTION
GREVILLE STREET
LT. C
HAPE
L ST
REET
CHAP
EL S
TREE
T
HARDSCAPE KEY
EXTENT OF WORKS
EXISTING KERB
ASPHALT PAVING
CONTRASTING INTERSECTION THRESHOLD PAVING
GRANITE PAVING - SHARED ZONE100 X 100 SETTS WITH COLOUR PATTERN
BLUESTONE PAVING - FOOTPATH
TACTILE GROUND SURFACE INDICATORS (TGSI)
EXISTING KERB AND CHANNEL
RAISED BLUESTONE KERB AND CHANNEL
OVERHEAD AWNING LINE
BICYCLE RACK
BENCH SEAT WITH BACK AND ARMRESTS
LINEAR BENCH SEAT TUBULAR STEEL AND MESH
CIRCULAR BOLLARD
REMOVABLE BOLLARD
RECYCLING AND RUBBISH BIN SET
DRINKING FOUNTAIN
STRIP DRAIN
PROPOSED LIGHT POLE
VERTICAL CATENARY LIGHTING AND MESH STRUCTURE
BEACON: INFORMATION & WAYFINDING
EXISTING LEVEL
PROPOSED LEVEL
SOFTSCAPE KEY
EXISTING TREE TO BE RETAINED
GARDEN BED WITH CLIMBERS
27Prepared for the City of Stonningtonby rush\wright associates
STAGE 3: KING STREET CLOSURE
NIGHT RENDER
VERTICAL SCREEN AND CATENARYWITH FEATURE LIGHTINGAND CLIMBERS
MULTI-HEADED LIGHT POLEWITH PROJECTIONS TO PAVING
PERFORATED STEEL MESH SEAT WITH INTERNAL FEATURE LIGHTING
CAFE FURNITURE KING STREET PAVINGGRANITE SETTS IN 4 NEUTRAL GREY TONE COLOURSIN WOVEN PAVING PATTERN
28Prepared for the City of Stonningtonby rush\wright associates
STAGE 3: KING STREET CLOSURE
DESIGN DEVELOPMENT SECTION
EXISTING KING STREET SECTION PROPOSED KING STREET SECTION
30Prepared for the City of Stonningtonby rush\wright associates
STAGE 4: PORTER STREET SHARED ZONE
DESIGN DEVELOPMENT CANOPY PLAN
+EX 0.00
+RL 0.00
GREVILLE STREET
PORT
ER S
TREE
T
PORT
ER S
TREE
T
HARDSCAPE KEY
EXTENT OF WORKS
EXISTING KERB
ASPHALT PAVING
CONTRASTING INTERSECTION THRESHOLD PAVING
GRANITE PAVING - SHARED ZONE100 X 100 SETTS WITH COLOUR PATTERN
BLUESTONE PAVING - FOOTPATH
TACTILE GROUND SURFACE INDICATORS (TGSI)
EXISTING KERB AND CHANNEL
SE1: RAISED BLUESTONE KERB AND CHANNEL
OVERHEAD AWNING LINE
BENCH SEAT WITH BACK AND ARMRESTS
SEAT WALL: MULTICOLOUR GLAZED BRICK
RAISED PLANTER WITH SEATING
FEATURE SEAT / BUTTON BOLLARD
BOLLARD: STEEL CLAD CONCRETE THIMBLE
CIRCULAR BOLLARD
PROPOSED NEW FENCE TO PLATFORM EDGE
RECYCLING AND RUBBISH BIN SET
DRINKING FOUNTAIN
PROPOSED LIGHT POLE
EXISTING POLE WITH LIGHTING TO REMAIN
EXISTING POLE TO REMAIN WITH LIGHTING REMOVED
BEACON: INFORMATION & WAYFINDING
EXISTING LEVEL
PROPOSED LEVEL
SOFTSCAPE KEY
EXISTING TREE TO BE RETAINED
WSUD TREEPIT WITH UNDERPLANTING
Add road markings and signs for pedestrian crossing
including additional light pole to match existing
31Prepared for the City of Stonningtonby rush\wright associates
STAGE 4: PORTER STREET SHARED ZONE
WAYFINDING ANDINFORMATION BEACON
NEW STREET TREES NEW STREET LIGHTPOLE EXISTING PHOENIX PALM
PORTER STREET SHARED ZONEGRANITE SETTS IN 4 NEUTRAL GREY TONE COLOURSIN WOVEN PAVING PATTERN
NEW STEEL PATTERNED FENCE
34Prepared for the City of Stonningtonby rush\wright associates
DESIGN DEVELOPMENT CANOPY PLAN
STAGE 5A: GREVILLE STREET WEST IMPROVEMENTS
+EX 0.00
+RL 0.00
GREVILLE STREET
PORT
ER S
TREE
T
GRA
TTAN
STR
EET
HARDSCAPE KEY
EXTENT OF WORKS
EXISTING KERB
ASPHALT PAVING
CONTRASTING INTERSECTION THRESHOLD PAVING
BLUESTONE PAVING - FOOTPATH
TACTILE GROUND SURFACE INDICATORS (TGSI)
EXISTING KERB AND CHANNEL
RAISED BLUESTONE KERB AND CHANNEL
OVERHEAD AWNING LINE
BENCH SEAT WITH BACK AND ARMRESTS
SEAT WALL: MULTICOLOUR GLAZED BRICK
RAISED PLANTER WITH SEATING
FEATURE SEAT / BUTTON BOLLARD
BOLLARD: STEEL CLAD CONCRETE THIMBLE
CIRCULAR BOLLARD
RECYCLING AND RUBBISH BIN SET
DRINKING FOUNTAIN
PROPOSED LIGHT POLE
EXISTING POLE WITH LIGHTING TO REMAIN
EXISTING POLE TO REMAIN WITH LIGHTING REMOVED
BEACON: INFORMATION & WAYFINDING
EXISTING LEVEL
PROPOSED LEVEL
SOFTSCAPE KEY
EXISTING TREE TO BE RETAINED
WSUD TREEPIT WITH UNDERPLANTING
35Prepared for the City of Stonningtonby rush\wright associates
STAGE 5A: GREVILLE STREET IMPROVEMENTS
36Prepared for the City of Stonningtonby rush\wright associates
STAGE 5B: GREVILLE STREET EAST IMPROVEMENTS
DESIGN DEVELOPMENT CANOPY PLAN
+EX 0.00
+RL 0.00
GREVILLE STREET
MAC
QU
ARIE
STR
EET
IZET
T ST
REET
ST. E
DMO
NDS
ROAD
HARDSCAPE KEY
EXTENT OF WORKS
EXISTING KERB
ASPHALT PAVING
CONTRASTING INTERSECTION THRESHOLD PAVING
BLUESTONE PAVING - FOOTPATH
TACTILE GROUND SURFACE INDICATORS (TGSI)
EXISTING KERB AND CHANNEL
RAISED BLUESTONE KERB AND CHANNEL
OVERHEAD AWNING LINE
BICYCLE RACK
BENCH SEAT WITH BACK AND ARMRESTS
SEAT WALL: MULTICOLOUR GLAZED BRICK
RAISED PLANTER WITH SEATING
FEATURE SEAT / BUTTON BOLLARD
BOLLARD: STEEL CLAD CONCRETE THIMBLE
CIRCULAR BOLLARD
PEDESTRIAN BARRIER
RECYCLING AND RUBBISH BIN SET
DRINKING FOUNTAIN
PROPOSED LIGHT POLE
EXISTING POLE WITH LIGHTING TO REMAIN
EXISTING POLE TO REMAIN WITH LIGHTING REMOVED
BEACON: INFORMATION & WAYFINDING
EXISTING LEVEL
PROPOSED LEVEL
SOFTSCAPE KEY
EXISTING TREE TO BE RETAINED
WSUD TREEPIT WITH UNDERPLANTING
37Prepared for the City of Stonningtonby rush\wright associates
STAGE 5B: GREVILLE STREET EAST IMPROVEMENTS
DESIGN DEVELOPMENT CANOPY PLAN
+EX 0.00
+RL 0.00
GREVILLE STREET
CHAP
EL S
TREE
T
HARDSCAPE KEY
EXTENT OF WORKS
EXISTING KERB
ASPHALT PAVING
EXISTING BLUESTONE PAVING - STEPS
BLUESTONE PAVING - FOOTPATH
STAINLESS STEEL TREE SURROUND
TACTILE GROUND SURFACE INDICATORS (TGSI)
EXISTING WALL TO RETAIN
GLAZED BRICK PLANTER WALL
STEEL BLADE WALL
CONCRETE EDGE - FLUSH KERB
EXISTING KERB AND CHANNEL
OVERHEAD AWNING LINE
BICYCLE RACK
LINEAR BENCH SEAT TUBULAR STEEL
BENCH SEAT WITH BACK AND ARMRESTS
PERFORATED MESH SEAT
RAISED PLANTER WITH SEATING
FEATURE SEAT / BUTTON BOLLARD
BOLLARD: STEEL CLAD CONCRETE THIMBLE
RECYCLING AND RUBBISH BIN SET
DRINKING FOUNTAIN
STRIP DRAIN
PROPOSED LIGHT POLE
EXISTING POLE WITH LIGHTING TO REMAIN
EXISTING POLE TO REMAIN WITH LIGHTING REMOVED
BEACON: INFORMATION & WAYFINDING
EXISTING LEVEL
PROPOSED LEVEL
SOFTSCAPE KEY
EXISTING TREE TO BE RETAINED
WSUD TREEPIT WITH UNDERPLANTING
38Prepared for the City of Stonningtonby rush\wright associates
STAGE 5B: GREVILLE STREET EAST IMPROVEMENTS
40Prepared for the City of Stonningtonby rush\wright associates
DESIGN DEVELOPMENT CANOPY PLAN
STAGE 6: PRAHRAN TOWN HALL FORECOURT
+EX 0.00
+RL 0.00
GREVILLE STREET
CHAP
EL S
TREE
T
KING STREET
HARDSCAPE KEY
EXTENT OF WORKS
EXISTING KERB
ASPHALT PAVING
BLUESTONE PAVING
TACTILE GROUND SURFACE INDICATORS (TGSI)
EXISTING KERB AND CHANNEL
OVERHEAD AWNING LINE
BICYCLE RACK
LINEAR BENCH SEAT TUBULAR STEEL
RECYCLING AND RUBBISH BIN SET
DRINKING FOUNTAIN
PROPOSED LIGHT POLE
EXISTING POLE WITH LIGHTING TO REMAIN
EXISTING POLE TO REMAIN WITH LIGHTING REMOVED
RELOCATED HERITAGE POLE
INGROUND LED
OVERSIZE PLANTER
BEACON: INFORMATION & WAYFINDING
EXISTING LEVEL
PROPOSED LEVEL
SOFTSCAPE KEY
EXISTING TREE TO BE RETAINED
LARGE PLANTER WITH SEMI-ADVANCED TREES &
UNDERPLANTING
41Prepared for the City of Stonningtonby rush\wright associates
STAGE 6: PRAHRAN TOWN HALL FORECOURT
OVERSCALED RAISED PLANTERSCONCRETE CLAD IN PAINTED STEEL
PERFORATED STEEL SEAT ANDCURVED STEEL TUBINGBENCH SEAT
EXISTING PLANE TREES
BLUESTONE PAVING WITHMETAL INLAY AND IN-GROUND FEATURE LIGHTING
WAYFINDING ANDINFORMATION BEACON
44Prepared for the City of Stonningtonby rush\wright associates
7.1 CITY OF STONNINGTON - STANDARD URBAN DESIGN PALETTE
DESIGN ELEMENTS
35City of Stonnington / Chapel Street Palette & Guidelines 2013
Par
t D: S
tand
ard
Pal
ette
Standard Furniture Palette
Description
Rubbish bin enclosure with internal wheelie bin.
Application
To be distributed at regular intervals along the entire length of Chapel Street, with additional units located at intersections, pause points and village squares, and within easy walking distance of take away food outlets or areas where people are likely to sit and consume food or drink.
Materials and Finishes
Frame: Stainless steel (304) Colour: Powder coat colour Berry Grey (Dulux colour range) Size: 120 litre Lid: Standard litter bin lid
Dimensions
Length: 660mm Width: 660mm Height: 1000mm
Installation
Surface mount or sub surface mount to manufacturer recommendations.
Bins should not be located in front of doorways, in pedestrian pathways, where they are visually obtrusive or obscure car / pedestrian / bicycle viewlines.
Provide wheelie bin.
Maintenance
Periodic inspection by Council’s Maintenance Department.
Recommended Supplier or Similar
Urban Design Group Web: www.urbandesigngroup.com.au Ph: (03) 9357 8884
Recommended Product or Similar
UDG3-BN140
7.6 Standard Rubbish Bin Enclosures
Standard Furniture Palette
49City of Stonnington / Chapel Street Palette & Guidelines 2013
Par
t D: S
tand
ard
Pal
ette
Standard Kerb & Channel Profile
Uncut bluestone pitchers, sawn bluestone gutterstone and sawn bluestone kerb.
Sawn bluestone pitchers
Standard Furniture Palette
7.20 Standard Kerbs
Kerbstone
Natural sawn bluestone as kerbstone to be distributed along the entire length of Chapel Street.
Dimensions
Length: 1000mm with a minimum length of 800mm Width: 300mm Height: 300mm Bullnose: 25mm to exposed corner
Gutterstone
Natural sawn bluestone as gutterstone to be distributed along the entire length of Chapel Street. Stagger joints of kerbstone and gutterstone
Dimensions
Length: 900mm typical Width: 250mm Thickness: 100mm
Channel
Natural sawn bluestone pitchers as channel to be distributed along the entire length of Chapel Street. Where channel forms part of a bicycle path, cut bluestone to ensure a flat sawn top face to form a smooth surface.
Dimensions
Length: 400mm typical Width: 200mm Thickness: 200mm
Additional Notes
Salvage and recycle existing kerb, gutter and channel stones wherever practical to preserve heritage value.
Alternate Option
Insitu concrete kerbs and gutter to be used only where that is the existing dominant condition.
Match properties of concrete colour and form to existing kerb.
Do not mix bluestone kerb with insitu concrete kerb.
Channel
Street
Pedestrian Zone Kerbstone Gutter- stone
54 City of Stonnington / Chapel Street Palette & Guidelines 2013
Par
t D: S
tand
ard
Pal
ette
WSUD LINTEL
WSUD LINTEL
HEEL SAFE GRATE
WSUD LINTEL
WSUD LINTEL
HEEL SAFE GRATE
Plan of typical pit location
Section of typical water inlet
Standard Planting Palette
Description
WSUD Side Entry pit located along Chapel Street to act as a primary watering system for the trees planted in footpath.
Pit to be covered with bicycle safe stormwater grate. Refer to 7.18 Street Pit Grate.
Application
To be distributed along Chapel street in close proximity to trees planted in footpath.
Preference is to have one side entry pit per tree.
Dimensions
TBC
Installation
In kerb and channel to manufacturer recommendations.
Maintenance
Periodic inspection by Council’s Maintenance Department.
.
8.4 Standard Side Entry Pit
40 City of Stonnington / Chapel Street Palette & Guidelines 2013
Par
t D: S
tand
ard
Pal
ette
Standard Furniture Palette
7.11 Standard Water Station - Option A
Description
DDA compliant filtered water station with drinking fountain and bottle refill dispenser.
Application
To be distributed at key public areas along Chapel Street,such as pause points and village squares.
Where possible, the station should be installed adjacent to garden bed areas where spilt and excess water can be used to irrigate planting.
Materials and Finishes
Housing frame: Stainless steel (304) Housing unit: Anodised aluminium Water supply connection: 50mm PVC Graphic Panels: 2mm thick polycarbonate sheet
Dimensions
Length: 598mm Width: 327mm Height: Custom height at 1050mm
Installation
Surface mount or sub surface mount to manufacturer recommendations.
All plumbing and drainage work is to be done in accordance with the local authority’s regulations and by a licensed contractor.
Maintenance
Periodic inspection by Council’s Maintenance Department.
Filter to be replaced every 12-18 months.
Recommended Supplier or Similar
Arrow-Alpha Industries Web: www.aquafil.com.au Ph: (02) 9737 0022
Recommended Product or Similar
Product Type C (custom height) - refill station and drinking fountain
Additional Notes
Graphic or colour to panels to be selected by Council
Unit customised at 1050mm high
48 City of Stonnington / Chapel Street Palette & Guidelines 2013
Par
t D: S
tand
ard
Pal
ette
FOO
TPTAH
S + DR
IVEWA
YS
City of Stonnington
STA
ND
AR
D P
ALE
TTE
Asphalt
FOO
TPTAH
S + SHA
REW
AYS
FOO
TPATH
DETA
ILS, LAN
ES + SHA
REW
AYS
Granite / B
luestoneG
ranite / Bluestone
Granite S
ettsFO
OTPA
THS
Asphalt
450x450200x200
100x100
KER
BS
Stone / C
oncrete
Sawn bluestone pavers
Standard Furniture Palette
Description
Pedestrian grade natural sawn bluestone paving
Application
To be distributed along the entire length of Chapel Street as the primary pavement.
Materials and Finishes
Material: Bluestone Colour: Natural Finish: Sawn
Dimensions
Length: 595mm Width: 595mm Thickness: 40mm
Installation
Laid in a stretcher bond pattern perpendicular to kerb.
Provide a 5mm joint to paving.
The paving should be a consistent finish, level and flush with adjacent pavement surfaces.
Provide construction, expansion and isolation joints to engineer’s requirements.
Install on mortar bed and insitu concrete base to engineer’s requirements.
Maintenance
Periodic inspection by Council’s Maintenance Department.
Supplier
Preference for Australian sourced bluestone
7.19 Standard Footpath Paving - Pedestrian Grade Zone
• bluestonekerbandchannel
• rubbishandrecyclingbins • drinkingfountain • wsudtreepit
• bluestonepaving
• pedestrianthresholds
45Prepared for the City of Stonningtonby rush\wright associates
7.2 GROUND PLANE : PAVING PATTERN DESIGN OPPORTUNITIES
• moderatelyrandomisedpattern
• pavingpatternincorporateshighcontrastpavingstrip
• patternderivedfromthegeomorphologyofVictoria
• designdevelopmentrender
• wovenpattern
• blendedinterfacebetweenpaversizes
• designdevelopmentrender
46Prepared for the City of Stonningtonby rush\wright associates
7.2 GROUND PLANE : METAL HIGHLIGHTS
STAGE 1: DESIGN ELEMENTS• designdevelopmentrender• treesurround
• tactilepattern• metalthreadswithingroundplane • existingwaterfeature
47Prepared for the City of Stonningtonby rush\wright associates
7.3 WALLS & EDGES: COLOURS & MATERIALS
STAGE 1: DESIGN ELEMENTS• designdevelopmentrender
• colourpaletteinspiration
• glazedbrickpalette • glazedbrickwalls • glazedbrickdetailcoursing
• wallandplanterformsinspiredbyheritageelementsofGrattanGardens
48Prepared for the City of Stonningtonby rush\wright associates
7.5 PLANTERS AND BOLLARDS
STAGE 1: DESIGN ELEMENTS• subtlevariety• varyingshapesandtextures
• uniqueobjectswithconsistentlanguage • stainlesssteelandconcretebollard(thimbleform) • buttonseat/bollard
• definepathsandspaceswithinthesharedzone• fieldofobjects
49Prepared for the City of Stonningtonby rush\wright associates
7.5 PLANTERS AND BOLLARDS
STAGE 1: DESIGN ELEMENTS• designdevelopmentrender• seatplanterplan
• seatplantersection
50Prepared for the City of Stonningtonby rush\wright associates
7.6 BICYCLE RACKS/ BOLLARD ELEMENTS
STAGE 1: DESIGN ELEMENTS• designdevelopmentrender
• streetfurnitureasbollard
• bicyclerack
• borrowedlanguage• hoopbikerack
51Prepared for the City of Stonningtonby rush\wright associates
7.4 MISCELLANEOUS AND STANDARD ELEMENTS
STAGE 1: DESIGN ELEMENTS• seatbacksonseatingwall • stainlesssteelstripdrain • designdevelopmentrender
• granitetactiles • stainlesssteelhandrail • cafefurniture
52Prepared for the City of Stonningtonby rush\wright associates
7.7 GREVILLE STREET SHARED ZONE ELEMENTS
STAGE 2: DESIGN ELEMENTS• wsudtreepit • wsudtreepit
• linemarkingsbycolourcontrast • pedestrianbarrier• linemarkingsbycolourcontrast
• designdevelopmentrender
53Prepared for the City of Stonningtonby rush\wright associates
7.7 KING STREET ELEMENTS
STAGE 3: DESIGN ELEMENTS• designdevelopmentrender
• pavingpattern• lightingtoenhancepavingpatternandcastshadows• verticalscreenandcatenary • withsomegreening
• screencouldprovideinterimpatternwhilstclimbersestablish • effectsthroughprojectionorartinstallation
• playfullightingeffects
54Prepared for the City of Stonningtonby rush\wright associates
7.7 PORTER STREET ELEMENTS
STAGE 4: DESIGN ELEMENTS• designdevelopmentrender
• pavingpattern • railwayfencewithdeformedpickets
• fencepanelswithselectedopacityandtransparency
• ingroundLEDtodefinepedestrianedges
• fieldofpointstoreadatdayandnight
• railwayfencegraphicembeddedinfencedesign
55Prepared for the City of Stonningtonby rush\wright associates
7.7 GREVILLE STREET WEST & EAST
STAGE 5: DESIGN ELEMENTS
• wsudtreepit• bluestonefootpath
• stainlesssteelseatinginavarietyofoptions • designdevelopmentrender
• treepitgrate
56Prepared for the City of Stonningtonby rush\wright associates
7.7 PRAHRAN TOWN HALL LIBRARY ELEMENTS
STAGE 5: DESIGN ELEMENTS• perforatedsteelforseating • designdevelopmentrender
• existingrampandstairwall • steelbladewall• stainlesssteelseatingbenches
57Prepared for the City of Stonningtonby rush\wright associates
7.7 PRAHRAN TOWN HALL FORECOURT ELEMENTS
STAGE 6: DESIGN ELEMENTS
• seatingwithinchapelstreetlanguage
• townhallfrontage • designdevelopmentrender• in-groundLEDstrip
• stonepavingwithmetalinlay
• seasonalplantingopportunities • overscaledelements
58Prepared for the City of Stonningtonby rush\wright associates
7.8 PUBLIC ART OPPORTUNITIES
PORTER STREET
1
3
2
1
2
3
BEACON OBJECT SERIES (REFER GRATTAN GARDENS)
COLLABORATION PROJECT: NEW STEEL FENCING TO PLATFORM BOUNDARY COULD INTEGRATE CONTEMPORARY DESIGN ARTWORK (REINTERPRET TRADITIONAL RAILWAY PICKET CONSTRUCTION DETAILS.
COLLABORATION PROJECT: SHARED ZONE PAVING DESIGN AS INTEGRATION OF HISTORIC CULTURAL ELEMENTS AND IDEAS INCLUDING LIGHTING, IMAGE, TEXT, PAVING DESIGN IN GRANITE - BLUESTONE PALETTE.
59Prepared for the City of Stonningtonby rush\wright associates
7.8 PUBLIC ART OPPORTUNITIES
GRATTAN GARDENS
BEACON OBJECT SERIES: A REPEATED STREET ELEMENT (REFER OTHER PRECINCT PLAN MARKUPS) WHICH COULD INVESTIGATE HISTORY, INTERPRETATION, SOUND, LIGHT, LOCAL EVENT BULLETIN, INTERACTIVE ELEMENTS.
CATENARY LIGHTPOLES WITH PROJECTION CAPACITY FROM RIGGING (NOTE: STAGE 2 IMPLEMENTATION) IMAGE ART & SOUND INSTALLATION
PERIOD OF THREE MONTH TRAFFIC TRIAL WITH TEMPORARY FESTIVAL INSTALLATION OF LIGHTING BY ARTISTS OR STUDENTS FROM THE MELBOURNE POLYTECHNIC DIPLOMA OF ‘LIVE PRODUCTION & TECHNICAL SERVICES’ AT PRAHRAN CAMPUS
1
2
3
1
2
3
3
60Prepared for the City of Stonningtonby rush\wright associates
PRAHRAN TOWN HALL
7.8 PUBLIC ART OPPORTUNITIES
4
CHAP
EL S
TREE
T
GREVILLE STREET
2
2
13
3
1
2
3
4
BEACON OBJECT SERIES (REFER GRATTAN GARDENS)
COLOUR - IMAGE WALL TREATMENT WITH TEMPORARY OR PERMANENT LIGHT PROJECT SERIES
COLLABORATION PROJECT: LIBRARY AND TOWN HALL OFFICES (FUTURE CIVIC FACILITY) SPECIAL OBJECT OR PAVING INSERTIONS
PRAHRAN TOWN HALL FORECOURT: SPECIAL ARTWORK INTEGRATION FOR MARKING TOWN HALL SPACE ALONG CHAPEL STREET
61Prepared for the City of Stonningtonby rush\wright associates
KING STREET
7.8 PUBLIC ART OPPORTUNITIES
4 4 4 4 43 3 3 3
2 2
1
1
2
3
4
5
BEACON OBJECT SERIES (REFER GRATTAN GARDENS)
COLOUR - IMAGE WALL TREATMENT
SPECIAL GRANITE PAVING PATTERN SERIES
TEMPORARY OR PERMANENT LIGHT PROJECT SERIES ONTO PAVING
LIGHTING DESIGNER & ARTIST COLLABORATIONA. LIGHTING PROJECTS (REFER #4 ABOVE)B. SEAT LIGHTINGC. LIGHT EFFECTS ONTO BUILDING PIERSD. VERTICAL CATENARY LIGHTING DESIGNE. GOBO PROJECTIONS
CHAP
EL S
TREE
T
LT. C
HAPE
L ST
REET
GREVILLE STREET
KING STREET
64Prepared for the City of Stonningtonby rush\wright associates
PLANTING KEY PLAN
STAGE 1: GRATTAN GARDENS
Understory:Agave americana, Aloe arborescens, A. barberae, A. plicatilis, Dion spinulosum, Yucca filamentosa or Y. recurvifolia, Zamia furfuracea
Understory:Agave americana, Aloe arborescens, A. barberae, A. plicatilis, Dion spinulosum, Yucca filamentosa or Y. recurvifolia, Zamia furfuracea
Ficus platypoda
Existing Schinus molle var. areirawith new understorey planting
Transplanted Phoenix canariensis
Existing Phoenix canariensis
Chamaerops humilis
Cussonia spicata
Washingtonia robusta
Existing Melia azedarach
Ceiba sp.
Chamaerops humilis
Erythrina crista-galli
Jacaranda mimosifolia
Brachychiton populneus x acerifolius ‘Jerilderie Red’Brachychiton populneus x
acerifolius ‘Jerilderie Red’
65Prepared for the City of Stonningtonby rush\wright associates
The fresh design prepared by the design team for Grattan Gardens is based on the concept of “bringing back the gardens” into Greville Street – a theme developed during the masterplan phase.
The park redesign is based on a reinterpretation of the original late 19th- early 20th Century “gardenesque” layout of the gardens, while providing spaces for social interaction and informal seating for the Prahran neighbourhood, serving contemporary needs and uses. Botanical interest and diversity is central to the design ideas presented, following the nineteenth century and early 20th Century ambition of curating a plant collection for the park that adds to a sense of public richness.
The current “symmetrical” order of a 7m wide path dividing 2 raised grass lawns and with only 3 tree species types has eroded the exuberance of the original garden and planting palette. There is potential “delight” in diverse plantings which we believe are essential to any park experience.
The two existing Phoenix palms are not part of the original 19th century layout of the gardens. They have probably already been transplanted once before, possibly as part of the current design. One Palm was originally closer to Greville Street as seen in the photo below. The current symmetrical design, framing an empty view, is akin to a domestic arrangement at a private house development or suburban estate entry and does diminish and dominate the visual perception of the park today.
Functional issues: The new design aims to provide equity of access up onto a single grass terrace (this is not currently provided in this area of the park). This requires a ramped path edging the west side of the park. The alignment of this path requires cutting into and retaining the existing grades at its north and south ends. Such a path cannot be located on the east side due to existing electrical switching and pit infrastructure on the NE corner. (It is undesirable to land a ramped path in that area).
The existing NW palm is right against the alignment of the proposed ramped path edge wall and requires relocation. Building a retaining wall against its swollen trunk base (bole) is not ideal due to the scale of the current swelling and trunk, resulting in uncomfortable visual proximity (it will feel too close). The palm requires a more generous space within a larger lawn area - hence the current proposal to relocate to the SE area of the terrace. The edge to this pathway will be planted with new Washingtonia robusta or Livistona chinensis palms and suitable understorey.
While we understand that Phoenix palms are very robust, a successful, diverse new planting for this edge will be difficult to achieve horticulturally / aesthetically around the bole of the existing palm and in elevation along the terrace edge and within the 2m cross section of the proposed garden. It will feel ‘thin’ and too close to the wall system.
The current DD design drawings show planning that is not purely symmetrical. (Circular Planter sizes, forecourt tree locations, catenary, non- ovoid grass shaping etc.) Retaining the symmetry of the existing palm locations diminishes the potential of the new design and detracts from the long term potential of new plantings.
The proposed locations of the two Palms, one retained and one relocated establishes a larger plant scale on the east side of the grass terrace with bold palm frond textures set against fine peppercorn foliage. The placement allows the largest area of free grass space. The two palm specimens will become a linked pair of strong vertical markers leading the eye and walkers off the forecourt, a kind of large scale pair of sentinels, inviting pedestrians up to the terrace and the park beyond.
Transplanting of existing Phoenix canariensis within DD Grattan Gardens design.
The Palm (in question) on left of picture is therefore proposed to be relocated on the east side of park against the existing line of peppercorns (right). The space between the existing White Cedar trees and the Palm is minimal to achieve a compliant path/ ramp.
Future Location of Transplanted palms against existing Peppercorns.
This is an important design move, and will take away the sense of the palms feeling like symmetrical ‘goal posts’ – a dull arrangement that commands too much attention, framing as it does and empty view. Relocating the palm to a side view, will totally transform the sense of the park for users, helping to invite a walk around rather than presenting the view of empty space. The palms will present in side view, as a pair, deepening the sense of perspective and maximising the sense of length and extension of the green space. This also allows fresh plantings on the west side, and a balanced asymmetry in the best of the gardenesque tradition.
We feel this is a very important design issue, and is based on some central design principles for the revised park design. Retaining the palm in its current location is definitely not recommended, and will diminish and stultify the fresh design if it is left as is.
66Prepared for the City of Stonningtonby rush\wright associates
PLANTING KEY PLAN
STAGE 2: GREVILLE STREET SHARED ZONE
Tilia cordata ‘Green Spire’ or Acer truncatum x platanoides
Jacaranda mimosifolia
67Prepared for the City of Stonningtonby rush\wright associates
PLANTING KEY PLAN
STAGE 3: KING STREET CLOSURE
Existing Platanus orientalis ‘Digitata’
Existing Platanus orientalis ‘Digitata’
climbers to linear catenary meshKennedia rubicundaParthenocissus quinquefoliaVitis vinifera
68Prepared for the City of Stonningtonby rush\wright associates
PLANTING KEY PLAN
STAGE 4: PORTER STREET SHARED ZONE
Existing Phoenix canariensis
Tilia cordata ‘Green Spire’ or Acer truncatum x platanoides
Tipuana tipu orJacaranda mimosifolia
Jacaranda mimosifolia
69Prepared for the City of Stonningtonby rush\wright associates
PLANTING KEY PLAN
STAGE 5A: GREVILLE STREET WEST
Tilia cordata ‘Green Spire’ or Acer truncatum x platanoides
Jacaranda mimosifolia
70Prepared for the City of Stonningtonby rush\wright associates
PLANTING KEY PLAN
STAGE 5B: GREVILLE STREET EAST
Tilia cordata ‘Green Spire’ or Acer truncatum x platanoides
Tilia cordata ‘Green Spire’ or Acer truncatum x platanoides
Existing Platanus orientalis ‘Digitata’
71Prepared for the City of Stonningtonby rush\wright associates
PLANTING KEY PLAN
STAGE 6: PRAHRAN TOWN HALL FORECOURT
Existing Platanus orientalis ‘Digitata’
Existing Platanus orientalis ‘Digitata’
Magnolia grandiflora ‘Kay Parris’Magnolia grandiflora ‘Teddy Bear’
72Prepared for the City of Stonningtonby rush\wright associates
STREET TREES
TREES AND PLANTING Tilia cordata ‘Green Spire’ Linden Tree
Platanus orientalis ‘Digitata’ - Existing along Chapel StreetAcer truncatum x platanoides
Platanus orientalis ‘Digitata’ - Existing at Chapel Street
73Prepared for the City of Stonningtonby rush\wright associates
PALMS
TREES AND PLANTING Washingtonia robusta Mexican Fan Palm Washingtonia robusta Mexican Fan PalmPhoenix canariensis - Existing at Prahran Station
Phoenix canariensis - Existing in Grattan Gardens
74Prepared for the City of Stonningtonby rush\wright associates
FEATURE TREES
TREES AND PLANTING
Brachychiton populneus x acerifolius ‘Jerilderie Red’ Brachychiton populneus x acerifolius ‘Jerilderie Red’Brachychiton populneus x acerifolius ‘Jerilderie Red’
Ceiba sp. Cussonia spicataChamaerops humilis
75Prepared for the City of Stonningtonby rush\wright associates
FEATURE TREES
TREES AND PLANTING
Ficus platypoda
Tipuana tipu
Melia azedarach - Existing at Grattan GardensErythrina crista-galli
Schinus molle var. areira - Existing at Grattan Gardens
Jacaranda mimosifolia
76Prepared for the City of Stonningtonby rush\wright associates
CLIMBERS
TREES AND PLANTING
Kennedia rubicunda Parthenocissus quinquefolia
Vitis vinifera
77Prepared for the City of Stonningtonby rush\wright associates
UNDERSTOREY
TREES AND PLANTING 04F. Yucca filamentosa or Y. recurvifolia
Aloe plicatilisAgave americana Aloe arborescens Aloe barberae
04G. Dion spinulosum Zamia furfuracea
80Prepared for the City of Stonningtonby rush\wright associates
LIGHTING INSPIRATIONS: GRATTAN GARDENS CATENARY
LIGHTING DESIGN
• sequinedfield
• simplifiedbotanicallightfitting
• simplifieddirectionallightfitting • designdevelopmentrender
• glomeshfabricfield • studdedclusters
81Prepared for the City of Stonningtonby rush\wright associates
9.1 CATENARY DESIGN
LIGHTING DESIGN
REFER APPENDIX A: WEBB CATENARY LIGHTING
82Prepared for the City of Stonningtonby rush\wright associates
9.2 SITE WIDE LIGHTING CONCEPTS
LIGHTING DESIGN
REFER APPENDIX B: WGE SITEWIDE LIGHTING
84Prepared for the City of Stonningtonby rush\wright associates
10.1 DESIGN DEVELOPMENT DOCUMENTATION
LANDSCAPE DRAWINGS
REFER APPENDIX C: RWA LANDSCAPE DRAWINGS
86Prepared for the City of Stonningtonby rush\wright associates
11.1 DESIGN DEVELOPMENT DOCUMENTATION
CIVIL, HYDRAULIC, AND ELECTRICAL DRAWINGS
REFER APPENDIX D: WGE SERVICES REPORTAND APPENDIX E: WGE SERVUCES DRAWINGS
Recommended