Speaker: Chris Brown, HOK -Design creation and coordination About the Qatar BIM User Day: Qatar University, HOCHTIEF ViCon and Teesside University proudly take the initiative to facilitate modern and innovative methods in the Gulf construction industry. The focus is Building Information Modeling (BIM), and our aim is to establish a knowledge platform with government, research and industry experts. The User Day aims to help people to share knowledge, discuss new technologies, and identify new potentials for BIM. More information: www.bimuserday.com Follow BUD on Twitter @bimuserday

Citation preview

1

May 22nd, 2012 Chris Brown

BIM process for Building Smart and Sustainable Design at HOK

BIM BAM BOOM!

2

HOK Building Smart Strategy "Buildings cost much more than they should and perform much less efficiently than needed….. the real promise of BIM extends from design to construction and building operations."

3

HOK Building Smart Strategy

4

Refined Concept: Lives of a BIM Model 1. Conceptual Design Model :

feasibility, environmental assessment, presentation

2. Design Intent Model: coordination and scheduling through construction docs

3. Design Fabrication Model: clash detection through finished construction, phasing, quantities

4. As-Built Model : for building occupation maintenance, operations and facilities management

Currently consultants have taken it upon themselves define and deliver all of these models

5

Conceptual Design BIM Model Essential

1. Conceptual Design Model : feasibility, environmental assessment, presentation

2. Environmental Design Model : MEP standards, environmental assessment

6

Conceptual Design BIM Model Essential

1. Master plan or urban design : feasibility, environmental assessment, presentation

2. Environmental Design Model : MEP standards, environmental assessment

7

Contractor to Set Standards 2. Design Intent Model(BAM):

-coordination and scheduling through construction docs -consultant led including the whole team

3. Design Fabrication Model(BAM):

-clash detection through finished construction, phasing, quantities -contractor led

8

Owner to Set Standards

4. As-Built Model(BOOM): for building occupant maintenance and future development BIM : Building Information Model Design cost impact

BAM : Building Assembly Model Construction cost impact 10 times design cost

BOOM : Building Owner Operational Model

Maintenance impact 30 times design impact over building life

9

Building Smart Strategy: Revised

Analysis Opportunities

10

Building Smart Strategy: Revised

11

BIM Analysis Tools Earlier in the Design

Analysis Opportunities: pushed to the front of BIM curve where the Cost of a design change is minimal.

12

BIM Analysis Tools Earlier in the Design

Analysis Opportunities: pushed to the front of BIM curve where the Ability to impact performance is maximum.

Performance

13

Environmental Analysis Software

NORTH15°

30°

45°

60°

75°

EAST

105°

120°

135°

150°

165°SOUTH

195°

210°

225°

240°

255°

WEST

285°

300°

315°

330°

345°

10 km/h

20 km/h

30 km/h

40 km/h

50 km/h hrs249+224199174149124997449<24

Prevailing WindsWind Frequency (Hrs)Location: Montreal, Quebec - Canada (45.5°, -73.7°)Date: 1st January - 31st DecemberTime: 00:00 - 24:00© Weather Manager

Weekly SummaryAverage Temperature (°C)Location: Rome, Italy (41.8°, 12.6°)© Weather Manager

°C

<0510152025303540

45+

Hr

48

1216

20

24

28

32

36

40

44

48

52

48 12 16 20 24

0

10

20

30

40

50

48

1216

20

24

28

32

36

40

44

48

52

14

Exterior Analysis to Influence Early Design

15

MEP Energy Analysis Tools not Early Enough

16

BIM and the design process

17

18

19

20

21

22

23

24

COLLABORATION

A shared environment

25

Robocopy

COLLABORATION Divide and conquer – linked models

26

Mind the gap

27

Grasshopper

The rest of the toolkit

28

29

30

31

32

33

34

35

3D Design Data: Design in BIM Platform when Possible